Is there any indication yet of the installed diesel power and the overall weight of the Class 769 ? Will it be able to maintain Sprinter timings ?
David
Is there any indication yet of the installed diesel power and the overall weight of the Class 769 ? Will it be able to maintain Sprinter timings ?
David
.... when running as an EMU the top speed for Flex is 100mph. She adds that, being conservative, when running on diesel its likely to be around 91mph-92mph. Really detailed point-to-point analysis shows what it does well, and which routes and journeys will deliver the biggest benefits to operators.
Perfect for through Windermere, Barrow services from Manchester etc.
I think Porterbrook will want some kind of long term commitment to use 769s before they start creating large quantities of them.
Except that by the December 2019 Northern have to provide 'Northern Connect' standard trains on those services which must have 2+2 seating, tables, charging points, air conditioning and wi-fi. Apparently the plan to put air conditioning on 319s was dismissed as an option because it would drain too much power and affect the train's performance.
Except that by the December 2019 Northern have to provide 'Northern Connect' standard trains on those services which must have 2+2 seating, tables, charging points, air conditioning and wi-fi. Apparently the plan to put air conditioning on 319s was dismissed as an option because it would drain too much power and affect the train's performance.
As there has been a material change to the situation of the franchise (no electrification to Windermere) I don't see why a change like this (to remove aircon from the spec) couldn't be agreed if appropriate.
Passengers in the Lake District will benefit from double the number of direct services to Manchester Airport from May 2018. From 2019, there will be brand new trains with more seats and better on-board facilities including air conditioning, toilets, free wifi and plug sockets, subject to business case.
We have listened to concerns about electrification gantries spoiling protected landscapes. Northern, the train operator, will therefore begin work to explore the possibility of deploying alternative-fuel trains on the route by 2021, improving comfort and on-board facilities for passengers whilst protecting the sensitive environment of this World Heritage Site. This trial will pilot an alternative-fuelled train, removing the need to construct intrusive wires and masts in this National Park. Journeys between Windermere and Manchester Airport will be improved sooner and with less disruption to services and local communities. This replaces plans to electrify the line between Windermere and Oxenholme.
Carlisle-Newcastle is due to be run by 158s so would be an obvious alternative service to put 195s on.
I
769s are being used on Windermere services from May 2018 to December 2019. I don't know what their internal configuration will be though. 2+2 seating, tables, wifi and a limited number of power sockets + USB charging would make them reasonably comfortable. The franchise spec has already gone out of the window and the DfT would happily agree to further changes as long as the ToC is being reasonable because the situation is NRs fault. Carlisle-Newcastle is due to be run by 158s so would be an obvious alternative service to put 195s on.
After which they get 195's and a connect service, given the timescale that they will be introduced its somewhat fanciful to talk about seating changes I think its pretty clear the seating will stay as is and they wont be used on connect services.
Of course not all services on the Windermere route have to be connect same applies to Barrow so some Barrow/Windermere-Lancaster/Preston could be 769 worked.
Seating changes are only fanciful if rolling stock plans don't change. Maybe Northern's will stay largely intact but the cancellation of electrification across England and Wales will increase the shortage of DMUs. Northern has more services suitable for 769s than can be run by 8 units and leases a range of sprinters from Porterbrook, there is an obvious deal to be done that allows some Northern DMUs to be cascaded elsewhere.
Well yes we already have another thread on the possibility that some GWR 150's may not transfer to Northern so yes Northern may well end up with more 769's, but they seemed fairly well aimed at the 150 market and from Northern viewpoint that going to be paired 150 diagrams, alternatively if you then start talking about using them on Connect services, with new interiors and Air Con then thats going to get expensive and then there is the extra load on the engines for the Air Con for a train which will have roughly similar Diesel Power to a 150.
Aircon, USB, "new" trains are all promises written for a manifesto, for votes because 50 new trains sounds a load better to the average voter than 100 cascaded.
No the promise for Northern Connect on Manchester Airport to Blackpool/Barrow/Windermere/Liverpool was written in because people were concerned that they'd get tatty old trains from the 1980s replacing 185s when routes are transferred from TPE to Northern. Arriva extended that promise to other routes so that they got quality points in the bidding process by trying to have a better bid than the likes of Govia.
To me it makes most sense to initially get 769s on services that will run in part (even a small part) under the wires. That way you get the most benefit, both in terms of making best use of the electrification, but also in terms of good publicity against "dirty diesels".
769 leasing cost could be relatively low if they allow Porterbrook to charge a small premium on leases for any Sprinters that they free up. If Angel Trains and Eversholt don't have any suitable DMUs available then its an oppertunity for Porterbrook to make some money. It is in the DfTs interests for as many 319s to be converted so they would probably allow Porterbrook to take advantage of the situation and sign off the transfers.
It's certainly not in DfT's interests to produce more - it's in their interests to ensure as much electrification as possible in done in the next 2 years, so the redundant EMUs can be used as EMUs.
Porterbrook are well aware they have an opportunity to make money. The 769s will reportedly cost almost as much to lease as brand new FLIRTs. If it wasn't for the December 2019 deadline and the poor planning for it the 769 would have been a non-starter. Look at what's happened with the D-Train, it's a non-starter as CAF are able to produce reasonably brand new DMUs which won't cost that much more than D-Trains.
It's certainly not in DfT's interests to produce more - it's in their interests to ensure as much electrification as possible in done in the next 2 years, so the redundant EMUs can be used as EMUs.
Are there any figures available? I have read that before but not seen any evidence to justify it. Seems odd that adding diesel engines to dual volt electric trains with 10-15 years of life left would cost a similiar amount per year as a new unit, especially when you consider that there are now 47 class 319s off lease earning Porterbrook nothing.
Are there any figures available? I have read that before but not seen any evidence to justify it. Seems odd that adding diesel engines to dual volt electric trains with 10-15 years of life left would cost a similiar amount per year as a new unit, especially when you consider that there are now 47 class 319s off lease earning Porterbrook nothing.
Leases could come down if we end up with say 50 769s?