Blockade to allow Waterloo upgrade to take place, resulting in timetable changes

Status
Not open for further replies.

Malcolmffc

Member
Joined
19 Mar 2017
Messages
310
...... Really?????


Was her personally responsible for the derailment was he? Which is the cause for the overrun.

Carne is responsible for ensuring that the appropriate processes and oversights are in place to prevent such incidents from ever happening.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,453
Between 7am and 9am this morning, there was just 1 train between Surbtion and Wimbledon. Also the same for Clapham Junction. Last Tuesday there were 8 an hour! Can they have last week's timetable back please. Haha. :joke, although train figures are true:
 
Last edited:

Foggycorner

Member
Joined
16 Nov 2016
Messages
202
Location
bolton
In answer to spacepenix question about signalling testing short answer is yes
all route combinations are tested and is easiest without any trains about as you can then simulate trains running and platforms empty or half occupied
 

SpacePhoenix

Established Member
Joined
18 Mar 2014
Messages
5,491
Would some of the drivers of the trains last night, once it was just the ex international platforms in use have been route conducted into the platforms 21-24?
 

ijmad

Established Member
Joined
7 Jan 2016
Messages
1,858
Location
UK
Still lots of cancellations and delays showing up. They've pushed back the target for resumption of normal services to 2pm.
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
Then push it back to 16.00, then to 18.00 then "until end of service" - what a shambles!
This word has been used several times today on these forums (one to describe Northern train services).

There may be problems with the matters discussed but I don't know about blood and guts everywhere being part of them. :D
 

randompixel

Member
Joined
31 Jan 2014
Messages
156
Location
Brookwood
Not sure how much accuracy to ascribe to this map but OpenTrainTimes signalling map for Waterloo is still showing P1, P2 and P3 as SHUT.

http://www.opentraintimes.com/maps/signalling/wat

Deep within the wall of text inside journeycheck.
To allow engineers access to a set of points at London Waterloo we have temporarily closed platforms 1-3 until 14:00, we are expecting this to have a minimal affect on our service.
We will update you with further information by 14:00.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,453
And you would have managed it better?
Then push it back to 16.00, then to 18.00 then "until end of service" - what a shambles!
Whilst I wouldn't want to use the word shambles, I did think 12.00 was rather optimistic to say the least. It's now 14.00 that disruption will last until but the 14.07 Guildford to Waterloo is cancelled and the 14.28 Guildford to Waterloo is showing as delayed, as is the 14.00 Ascot service but that might be for other reasons.

The 13.15 Waterloo to Haslemere hasn't left Waterloo yet and at some point on its route towards Haslemere, it would go past 14.00, so that would count too. I'm sure similar oil be find for other routes too.

This then begs the question, at what point can one class disruption as over. Only when the final disrupted train has completed its journey? When most trains are no longer disrupted? Something else entirely? How many is most?
 

WelshBluebird

Established Member
Joined
14 Jan 2010
Messages
5,610
What time was the handover supposed to happen this morning if everything had gone to plan? Feels to be as if there just wasn't enough contingency in the plan (or was it in the plan, but already used up by other things?). Tbh if I was a commuter going into Waterloo I probably would have assumed a delay today and made other plans!
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,942
What time was the handover supposed to happen this morning if everything had gone to plan? Feels to be as if there just wasn't enough contingency in the plan (or was it in the plan, but already used up by other things?). Tbh if I was a commuter going into Waterloo I probably would have assumed a delay today and made other plans!

As always with signal commissioning, no contingency can allow for a problem that is identified immediately in advance of hand back. I don't know what happened here, but that seems likely.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,453
As always with signal commissioning, no contingency can allow for a problem that is identified immediately in advance of hand back. I don't know what happened here, but that seems likely.
When staff strike from say midday to midday, there is a period either side where less trains run as services get up to the right point again. Could they do a phased return of services just in case problems occur? It was massive project and one can't expecting things to always go perfectly.

There were lots of stopping services running from Woking to Waterloo this morning, not all but a fair number. However as the usual timetable doesn't allow them to stop at any station between Surbtion and Waterloo, they did just that. I. E. Skip them all as timetables. If they could have diverted one or two trains onto the slow line, then stations such as Wimbledon, Earlsfield and Clapham Junction could have been served. They were able to do it last week with a planned reduced timetable. Bear in mind only 1 out of 8 trains between Surbtion and Waterloo were running on the slow line between 7am and 9am today. Last week they were running 16 trains in that time, abet other services from other lines, that join the slow line north of Surbtion, were not running. Some if those weren't running today either. Chessington Branch for example.

I know this was unplanned but it seems they are not able to be flexible when things go wrong. If they cannot be flexible then perhaps a phased return would be better.
 
Last edited:

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,308
Route into P1-P3 appears to be back in use as of 1411. At least there's trains in P1 and P2 as I type...
 

ijmad

Established Member
Joined
7 Jan 2016
Messages
1,858
Location
UK
It would appear that P2 & 3 are back in passenger service. However, boards still showing a bunch of delays and cancellations: 14:03 to Teddington, 14:09 to Guildford, 14:12 to Shepperton, haven't moved yet, 14:20 to Exeter cancelled.
 

WelshBluebird

Established Member
Joined
14 Jan 2010
Messages
5,610
As always with signal commissioning, no contingency can allow for a problem that is identified immediately in advance of hand back. I don't know what happened here, but that seems likely.

Obviously you have to be careful with what you read online, but I saw that apparently it was an issue while testing signalling after works had finished. If that is the case then I really do have to ask why on earth was testing being done the morning the station was due to fully reopen? Surely common sense would have said if testing wasn't due to happen until today then wait until tomorrow to try to run a full service?
 

Juniper Driver

Established Member
Joined
17 Jul 2007
Messages
2,154
Location
SWR Metals
Obviously you have to be careful with what you read online, but I saw that apparently it was an issue while testing signalling after works had finished. If that is the case then I really do have to ask why on earth was testing being done the morning the station was due to fully reopen? Surely common sense would have said if testing wasn't due to happen until today then wait until tomorrow to try to run a full service?

Of course the passengers know best as usual.I've read the tweets.
 

Wombat

Member
Joined
12 Jul 2013
Messages
302
Tbh if I was a commuter going into Waterloo I probably would have assumed a delay today and made other plans!

That's what I did - tomorrow is the day on which I attempt to resume my "normal" commute. Not everyone will be in a position to do that, though.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,601
Location
Torbay
Signalling is always the last discipline to complete and hand over, simply because it's not possible to finally connect up all the external track circuit bonds to the rails and the cables to point machines until the civil and permanent way work is complete. Interlocking and panel/vdu etc is all pretested, either well in advance in the office for computer based systems or earlier during the work while the heavy trackwork is being done, and using test switch panels to simulate the exterior equipment if a relay-based system. Teething problems with some exterior equipment may not become apparent until that final changeover, and it's possible there can be other underlying causes, say a poorly-aligned new switch preventing a point machine making detection, or a mistake in traction bonding shorting out a track circuit. No excuse clearly but illustrative of the tension in that final stage of the work.
 

WelshBluebird

Established Member
Joined
14 Jan 2010
Messages
5,610
Of course the passengers know best as usual.I've read the tweets.

Oh don't get me wrong, I am not claiming I know best. And I am more than aware of the ludicrous comments that will be coming from some people.

I am just talking from my point of view from my career. Testing happens in software development too, but we certainly don't put a plan together where a new build is released to live on the same morning that testing is planned to finish.

Which is why I am interested, because to have a plan that finely balanced that something failing testing causes the issues that it did is a massive contact to what I used to.
 

ijmad

Established Member
Joined
7 Jan 2016
Messages
1,858
Location
UK
Oh don't get me wrong, I am not claiming I know best. And I am more than aware of the ludicrous comments that will be coming from some people.

I am just talking from my point of view from my career. Testing happens in software development too, but we certainly don't put a plan together where a new build is released to live on the same morning that testing is planned to finish.

I would guess any contingency was eaten up by the derailment incident.

Also, I'm in software too and I do understand what you're saying, but it's not a fair comparison with bricks and mortar. After all, you can't just downgrade if it all goes wrong, or fix bugs as easily, and if a train station 'crashes' you're in some serious trouble. :lol:
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,453
That's what I did - tomorrow is the day on which I attempt to resume my "normal" commute. Not everyone will be in a position to do that, though.
I actually decided not to travel today. Not something I considered during the three weeks of works if I ever need to get a train.

Now I didn't get up until 7.45 and maybe if I'd got up earlier I might have attempted it.

I see disruption until end of service but it's due to multiple incidents, which to be fair, they wouldn't have known about this morning.

In addition to the signalling testing:
A track circuit failure failure near London Waterloo, closing platforms 1-3 at London Waterloo
A broken down freight train in the Southamton area
A broken down train near Bookham
http://www.nationalrail.co.uk/service_disruptions/168727.aspx

They are doing a phased bring up of services. I think that should have been the plan in advance but then hindsight is wonderful. Maybe it was intended for it to be fully tested yesterday but other earlier issues prevented it.
 
Last edited:

WelshBluebird

Established Member
Joined
14 Jan 2010
Messages
5,610
I hope people don't take my comments the wrong way by the way. The amount of work that has been done whilst keeping at least some of the station open is pretty impressive in my eyes. And I am certainly not throwing my toys out the pram like some people on Twitter have been (I had a go at SWR for a mess up at Bristol last night, so am not in the business of defending companies normally either).

I would guess any contingency was eaten up by the derailment incident.

But in that case, why not be open about it? Overnight they were still saying everything was running as planned.

Also, I'm in software too and I do understand what you're saying, but it's not a fair comparison with bricks and mortar. After all, you can't just downgrade if it all goes wrong, or fix bugs as easily, and if a train station 'crashes' you're in some serious trouble. :lol:

Now I can't disagree at all with that! Apart from the fact that as you can't downgrade back to the version, then contingency is even more important.
 