In the case of the Uckfield branch, he said the exact opposite (p61 of the report):
On page 55 is that there is no significant difference between the costs of the AC and DC scheme, he then gives largely unsupported suppositions that AC is cheaper than DC.
Gibb Report said:Separate experts have suggested to me that a cost in the range of £75m-£95m is more likely for electrifying Uckfield – Hurst Green alone, whether this is with AC overhead or DC third rail
(In a Modern Railways interview, he expanded on the substations point: Substations would also require land to be purchased to put them on).
Meanwhile AC systems would be fed with a magical supergrid bulk supply point that consumes no land at all
Indeed in the report he mentions that it is entirely possible to electrify using DC without a national grid connection at all, instead drawing power from the local distribution network at 11kV or 33kV.
Gibb Report said:The line between Sanderstead and East Grinstead was electrified as cheaply as possible in 1987, and the 11kV power supply
Tram-style 750Vdc rectifier plants are extremely compact.
Yes, but you can buy an awful lot of substations for the cost of ripping it all out and providing a whole new grid supply system, distribution system, all the steelwork and resignalling works, and all the associated disruption.A 92 can only deliver 4MW if that power is available in the third rail. The consequence of using 750V DC is that it's much harder to provide that sort of power efficiently. Megawatt-level loads really do take 750V DC third rail well beyond its comfort zone, while 25kV wouldn't be breaking a sweat. Of course, you can mitigate this by providing lots of feeder stations, but the train interface is still never going to work well.
EDIT:
Apologies, I got the Gibb Report and the Uckfield Line mixed up with the Kent Route Study - Technical Appendix draft and the Marshlink LIne.
Page 20/58:
6.2.6. The options are expected to cost:
• Option 1 - dc electrification £100-250M
• Option 2- ac electrification £250-500M
• Option 3 - no direct cost.
Last edited: