I was also surprised that Andover only allowed 9 and the very rear of coach 10 was indeed just out.
Andover holds 10 on both the up and down platforms.
I was also surprised that Andover only allowed 9 and the very rear of coach 10 was indeed just out.
Salisbury depot has to locate a computer which can still read floppy disks to update the PIS to being SWR rather than SWT(JOKE)
159s used to have additional speed restrictions going via Staines so it probably makes more sense to keep them onto the main-line than to crawl through some of the stations.
Neither floppy disk drives (either internal or USB) nor the disks themselves are hard to source. A 30 second search on Amazon or Maplin's websites shows that.
If Salisbury don't have the necessary hardware easily available in their depot, it's due to pure incompetence and clearly shows how little train companies care about (providing information to) passengers.
Andover holds 10 on both the up and down platforms.
That same Salisbury depot maintains the most reliable fleet in the country - even if it was a joke, making sure the service runs is the most important thing.
Sure, but nobody cares how reliable the train's mechanics are when the line is blocked by flooding/tree on the line/other non-train-related problem and they're left for hours with no information about what's happen(ed|ing) or how/if/when they're going to get to their destinations. After ensuring the train is safe and unlikely to break down, passenger information is easily the most important thing. Unfortunately TOCs (and BR was little different) seem to treat it as less important than the catering trolley.
Reliability goes hand in hand with ensuring the train doesn't break down.
Now read what I said... Particularly the parts where I said "... when the line is blocked by flooding/tree on the line/other non-train-related problem ..." and "After ensuring the train is safe and unlikely to break down ...".
The train can be as mechanically reliable as you like, but there will always be times when it can't run for some reason unrelated to its reliability. That's when providing accurate, up-to-date and regular information is vital. Unfortunately, most of the time, you'll get better information from the TOC's Twitter account than any public-facing member of staff.
Why the company-issued smartphones can't be as the very least be set up to receive the company's Twitter updates is beyond my understanding... Would at least stop the most blatant cases of out-of-date or just plain incorrect information being given out.
A useful feature of the new SWR website is the "How busy is my train?" section... based on the average loading for each train between December 2016 and May 2017.
It's really about time that data made it into the Journey Planner as per SBB, with an added option of "avoid crowded trains if possible at the expense of a slower journey".
Presumably the idea is that this data will eventually be real-time or regularly updated using the load monitoring of the 707s and (when they get them) Aventras? Is there any suggestion that they might add this to the current Desiros, too?
Neither floppy disk drives (either internal or USB) nor the disks themselves are hard to source. A 30 second search on Amazon or Maplin's websites shows that.
If Salisbury don't have the necessary hardware easily available in their depot, it's due to pure incompetence and clearly shows how little train companies care about (providing information to) passengers.
The Desiro fleet has load sensing/monitoring, and a subset of both fleets has IR passenger counting (seen above doorways).
I doubt it can be displayed onboard like the newest trains though.
Could it be added, though? From memory (the website seems to be down now?) the SWR website promised new PIS on all mainland trains including loading information.
The LR article mentions that additional stairs are being added to P1-4 to increase access to the Undeground. Is this really the case? I've not seen any mention of that here or in the publicity.
I think it is a work in progress. Obviously the LR article provides photographic evidence that the work has commenced, in fact I wonder if P5/6 will also get the same treatment?
In an ideal world I suppose all the subway stairs would be altered to face towards the country end of the platforms. Does anyone know if the lifts are still operational, because they and various "staff facilities" all combine to limit circulation...
The Smart card pages link through to each other in a loop.
Does anyone know of a working link to apply?
Also, can these be used at any station now?
Annoying. Hedge End has had the terminals for years.The map I saw yesterday was no different to that for SWT's scheme, i.e. not every station, and not every route, basically exactly as before.
That's interesting! Is this how the guards know there are seats available in other carriages? They often make that announcement, and I wonder how they can be so sure when they're at the opposite end of the train.
Andover, as detailed in the sectional appendix, can only take 9 car 159s. Neither platforms are long enough for 10, 219m and 223m respectively.
Could it be added, though? From memory (the website seems to be down now?) the SWR website promised new PIS on all mainland trains including loading information.
Surely they must be able to? A guard on my train the other day gave out his Twitter user name and said he could be tweeted directly. Maybe it's something they wish to bring in over time or maybe he was unique and doing something he hadn't been directed to do as part of his job.Now read what I said... Particularly the parts where I said "... when the line is blocked by flooding/tree on the line/other non-train-related problem ..." and "After ensuring the train is safe and unlikely to break down ...".
The train can be as mechanically reliable as you like, but there will always be times when it can't run for some reason unrelated to its reliability. That's when providing accurate, up-to-date and regular information is vital. Unfortunately, most of the time, you'll get better information from the TOC's Twitter account than any public-facing member of staff.
Why the company-issued smartphones can't be as the very least be set up to receive the company's Twitter updates is beyond my understanding... Would at least stop the most blatant cases of out-of-date or just plain incorrect information being given out.
New stairs will only be provided on platforms 1-4. I took the image below when onsite. You can clearly see that a hole has not been created in the platform 5-6 void.
Thanks,
Ross