• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

High Summer Friday till 25th August Only ATW Long Distance Changes

Status
Not open for further replies.

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
IJ09- 0910 Birmingham International (BHI) to Holyhead ( HHD) will become 1J09 0910 BHI to Aberystwyth (AYW) instead.

Front 4 carriages will detach at Shrewsbury (SHR) on arrival at 1021 to form 1G31 1032 SHR to BHI. Rear 2 will continue to AYW @ 1027. Platform 4B.

1S20 0830 AYW to SHR terminates Platform 3 (1017) then forms new 1D42 1027 SHR to HHD.
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
What does any of that mean?

There diverting a through Birmingham to Holyhead train to Aberystwyth. It use to connect with an Aberystwyth train that ran from Shrewsbury the unit from this (which terminated originating Aberystwyth) will now form a Shrewsbury to Holyhead train in the path of the through train from Birmingham.

I suspect there could be high advance booking for Aberystwyth and there doing this for customer convenience instead of making them change at Shrewsbury. Ive just tried booking an AP next Friday on the 0910 and there sold out.

Says something about demand for through trains to North Wales Coast from West Midlands via Shrewsbury.
 

sjoh

Member
Joined
7 Apr 2016
Messages
372
Location
London, E11.
IJ09 (09:10) Birmingham International to Holyhead will become 1J09 (09:10) Birmingham International to Aberystwyth instead.

Front 4 carriages will detach at Shrewsbury (arrives at 10:21) to form 1G31 (10:32) Shrewsbury to Birmingham International. Rear 2 will continue to Aberystwyth (10:27) from Platform 4B.
;
1S20 (08:30) Aberystwyth to Shrewsbury terminates in Platform 3 (at 10:17) then forms new 1D42 (10:27) Shrewsbury to Holyhead.

Better?

So what are the reasons for these changes?
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,442
Location
Yorkshire
What does any of that mean?
I have edited the post so that it now complies with our requirements for the station name to be referred to at least once (we do allow the use of CRS codes to be used thereafter) so hopefully it makes sense now :)
 

175001

On Moderation
Joined
3 Feb 2007
Messages
1,360
Location
Between Heaven and Hell
Says something about demand for through trains to North Wales Coast from West Midlands via Shrewsbury.

Always been the case hasn't it?

West Mids go Barmouth/Harlech/Pwllheli way
North West go Prestatyn/Rhyl/Llandudno way

ATW also running a bucket and spade relief on the coast on Saturdays, using the Manchester MK3 set.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,972
Location
Airedale
Advances or no, it might relieve the preceding Cambrian train which can get very busy IME, unlike the SHR-AYW.

But how will another enforced change play in Wrexham et al?
 

Welshman

Established Member
Joined
11 Mar 2010
Messages
3,068
Will the 0830 ex Aberystwyth be advertised as through to Holyhead?

If so, I think that will be a first!
 
Status
Not open for further replies.

Top