The internet version also has City starters at 0526/0607/0638 plus a terminator arriving 0844 (the 0752 ex-Sevenoaks continues beyond City). WebTIS on the other hand includes the first three starters/terminators like the SER timetable but also claims both the 0844 and 0900 are terminators and that the 1733/1821/2039 arrivals start north of City. Not confusing huh? :?
WebTIS also claims that the 1816 'crowd-buster' from Farringdon becomes the 1705 ex-Sevenoaks with the following service (1824 call at StP) no longer starting at Sevenoaks and doing so at 1810 in Elephant & Castle instead (without a Farringdon call!). That's another 319 diagram or two since the 317s are needed on the GN route, we only have 2 units spare as it is (is 377502 definitely on course for service starting this Friday?).
I keep on wondering where that 'extra' spare came from - and I think it's finally clicked now.
I remember reading somewhere that there are still 99 D1C diagrams in total but one of the 377 diagrams was originally thought to be a 319 diagram (at the time only 501 and 504 had been dispatched from Derby). That equates to planned peak utilisation rates of ~95.35% for the 319s* and ~96.12% for the whole TL fleet.*
So the situation is marginally better than I thought. However with only 2 377/5s in service ATM we still need another 3 or 4 before May 18 and yet another 3 before June 15 just to avoid temporarily losing diagrams - this is based on all 86 319s being diagrammed (and also the 4 Networkers for City starters/terminators) until even more 377/5s are delivered.
Anyway, why didn't 502 make the trip?
[* Assuming 4 spares. With 2 of them in use the respective rates increase to ~97.67% and ~98.06%]
A 0650 BFR departure sounds like the 0540 BDM-BTN, was that 377 formation transferred from the 0600 BDM-BTN then? If so it's just as well I got to LTN later, intending to get the 0708 HST but bailing out and getting a 319/2 at 0651 instead (and I had let another southbound /2 go past at 0640!)
Considering what D1C stands for how exactly are the 2 317 diagrams considered extra to the D1C diagrams? :? Also, as mentioned earlier the 'crowd-buster' may well continue beyond this timetable and ultilise a 319 or two starting in DC territory from May 18.
Thanks for clarifying the status of the 317 diagrams.
Glad to hear 502 finally made it (with recently fixed 208 I've heard), mind you if I'd known about the move I'd have spent a few extra minutes in Farringdon this afternoon. Also, I hear that 206 was diverted to Moorgate today (DC issues presumably) - was that why the 1704 BTN-BDM (1822 Blackfriars) was cancelled today? (What also intrigues me is that during that minute 319430+(I think)440 came through Blackfriars empty, whether this is relevant I don't know.)
And finally, 507 has already been to Milton Keynes Central with 215 on test; DC trips to Brighton/Barnham with another 377 (was originally going to be 502) are also planned, diagrams courtesy of JKA:
Happened to be a failed train between Old Street and Moorgate which is why there was so much disruption.
It all depends what was the problem, if the unit wasn't able to move under it's own power then that's why, it could have gapped itself ie lose power from the 3rd rail which has happened before, anything could have happened.
As to the CIS screens, I have been told by management that some will be updated when possible mainly Welwyn Garden City, Hertford and I think Royston.
I agree with your post that a screen could be placed upstairs but then it comes down to who will pay for it, it's a TFL station but they might argue that since FCC want it, they should pay for it.
Well from what I've heard, the GN might be looking at the TL's Funkwerk system as the company behind the existing GN system didn't get a look in and that came from the engineer who looks after the system.
Still, it would be nice to have just one system though out the entire company, makes it easier for maintenance.
But if it's one thing I do envy about the TL route is the fact that they should soon be running 377s, I take it that the 377s are being operated by FCC until the new Thameslink trains come into service in 2012?
I got the chance to travel behind one from Brighton this year and it was luxury compared to the 319s, they are long overdue for the route.
Would be nice to cascade the 317s/321s across to NXEA and let us have some 377s, about 18 in total which would allow for the replacement of all FCC 317s, the LM 321s to go to NXEA instead of us and also to finally replace the 365 that was involved in the Potters Bar crash.
Then replace the 313s with 378/2s, basically a 378 but with a lower roof profile like the 313s, the 313s going to MerseyRail to boost their services.
Funkwerk heading our way, apart from all the problems noted with it seeing as it is a newly installed system - (no idea what was used before) what's it like?
Don't suppose you found out the dates (not set in concrete obviously)
As to the GN Moorgates, there's still the Welwyn to Moorgates to consider as well.
As to when the new stock comes in, I think it would be slowly both routes at the same time as then they could use the trains on either the GN or TL routes to bed them down and solve any teething problems.
Would also allow for staff training as well, they could introduce them on the TL first and allow the GN staff to have training sessions over there but who knows....
One thing I love to know is when the TVs will get fitted to our trains?