https://www.theguardian.com/comment...-nhs-britain-rail-electrification-politicians
is very interesting, but too long to quote fully. An example:
Unfortunately it fails to understand the turmoil created by the change in electrification standards,
https://www.railengineer.uk/2017/02/24/egip-electrification-clearance-woes/
The guardian article is mainly about UK decision-making, which is I suppose exactly what the Rail Engineer article is criticising too.
is very interesting, but too long to quote fully. An example:
A familiar pattern of events ensued. To enable the electrification, the line was closed, at first at weekends and then altogether from last June until February this year. Reopening was scheduled for the end of that month, and it did reopen, though without electric trains. Too much had gone wrong. The masts that carried the overhead wires were incorrectly designed and delivered late; a road bridge had had to be modified; pile drivers had broken through sewers and platforms had still to be lengthened to cope with longer electric trains. To remedy these flaws and omissions, the railway will close again later this year. With luck, the first electric trains will run in late spring next year, only 15 months late.
What the local paper called “an engineering design blunder” has become far from exceptional.
Unfortunately it fails to understand the turmoil created by the change in electrification standards,
which is explained well here:"contractors had set the overhead power lines too low when they passed under bridges"
https://www.railengineer.uk/2017/02/24/egip-electrification-clearance-woes/
The guardian article is mainly about UK decision-making, which is I suppose exactly what the Rail Engineer article is criticising too.