Assuming this is at Paddington?
Yes!
Will amend original post, apologies.
Assuming this is at Paddington?
Two platforms at Bristol Temple Meads will be extended this summer in preparation for a new fleet of diesel-electric Intercity Express Trains, which will provide more seats, better on-board facilities and more comfortable journeys for passengers.
Great Western Railway (GWR)s new fleet of trains are longer than the existing High Speed Trains and will require additional platform length to allow passengers to get on and off the trains safely.
These new trains will begin to come into service this autumn.
This work will fit alongside other improvement work taking place at Temple Meads as part of Network Rails Railway Upgrade Plan, including signalling renewals and the installation of new lighting.
To extend the platforms, the existing ramp will be demolished during the last week of June and the first week of July. This will take place overnight in order to minimise disruption for passengers.
Platform extension works will also take place overnight over a three-week period from the last weekend of July until mid-August.
Services will not run from platforms 13 and 15 on the four Sundays between 30 July and 20 August, so passengers are advised to check the departures boards at the station for updated platform information on arrival at Bristol Temple Meads.
Michelle Scogings, Senior Programme Development Manager for Network Rail, said: I would like to thank passengers in advance for their patience as we undertake this work to accommodate the new fleet of Intercity Express Trains at Bristol Temple Meads as part of our Railway Upgrade Plan.
We have worked closely with our colleagues at GWR to ensure that the impact on local residents and passengers from this work will be minimal.
Passengers will see the benefits from this work in the autumn as the new trains come into service, providing a vital capacity boost, as well as more space for passengers and their luggage.
UM Twyford to Twyford West wired.
All Twyford west crossovers wired.
Two additional mast have gone up at Lands End. There are now 4 at each end
of the Twyford west crossovers.
Twyford overbridge parapet work ongoing.
Missing mast on Pl 4 and portal now up.
Work around other mast base finished. Mast to go up? There is one laying nearby.
Re the final 3 images in your post, I'd suspect that those 4 masts will have something to do with a National Grid Feeder connection, given the height and spacing.
The only National Grid feeder connections are at (or will be at) Didcot and Kensal Green with the neutral section between the two phases at Maidenhead. A document issued some time ago by ABB shows Twyford as an ATS site, an auto-transformer site. The switch gear being installed at Twyford West is most likely to be there for isolating sections for maintenance as it is located at a ladder crossing running between the Up Relief and the Down Main.
Thanks for this post. This all seems to be a haphazard implementation.AT wire now in between Hanwell & West Ealing, (NLL).
An autotransformer wire, which on some electrification schemes exists instead of a return wire. Where a return wire is carried on small insulators, an AT wire requires full-size insulators like those used for the contact and catenary wires. If the rails are at 0V and the contact wire is at +25kV, an AT wire is at -25kV. It enables more or heavier or faster trains to run for reduced power losses.What is a "AT wire" please?
An autotransformer wire, which on some electrification schemes exists instead of a return wire. Where a return wire is carried on small insulators, an AT wire requires full-size insulators like those used for the contact and catenary wires. If the rails are at 0V and the contact wire is at +25kV, an AT wire is at -25kV. It enables more or heavier or faster trains to run for reduced power losses.
Thanks. Is there a website that explains all? Much appreciated. Sounds fascinating.
What is a "AT wire" please? And surely these two stations have been operating HEX and HConn for years....so why the need to implement more here?
I have just gone under the Acton Dive Under. Didn't realise it was used yet? I have never been through it before? A freight train was just leaving Acton Yard so that would be why. Just didn't realise it was operational yet... how long has it been like this?

Also the power from Kensal Green now has to get as far as Maidenhead, and probably to Reading or beyond if the Didcot feeder is out of use for any reason. Because the AT system works at double the voltage from this point of view, it can supply an adequate voltage in the line at least twice as far away.The HEx wiring was good for 100mph and 6xEMUs an hour each way.
The GW route needs 125mph (arguably 140mph) and a much heavier electric load with something like 15tph (800s and 387s) added to the mix, plus some freight.
Hence it will need a much higher performance, so an AT solution is needed.
New power supplies at Kensal Green will power it all out to Maidenhead.
For the same reason, St Pancras to Bedford OHLE will have to be uprated when the MML is wired north of Bedford.
...Reports from people who used it during the first few days can be seen about 1000 posts back in this thread.![]()
I've got a vid up of a pass under it on opening day, shot from the window of a 387.
On another note, when does Kensal supergrid get sparked up? And will it be a prerequisite for the additional Maidenhead runs from 3rd July?
Friday 30 Jun 2017
Prime Minister opens railway sidings for new electric services
Route:
Western
Prime Minister, Theresa May, officially opened a new £4.5million railway siding in her constituency of Maidenhead this morning, which will see Great Western Railway (GWR) increase the number of electric, peak time trains.
The sidings have been installed as part of Network Rails Railway Upgrade Plan and will ease congestion on the railway, allowing GWR to introduce a further three new eight carriage Electrostar trains, increasing capacity and improving passengers experience.
Theresa May, the Maidenhead MP, unveiled a plaque to mark the opening of the sidings and said: It is great to see that this vital work, which will increase capacity and improve services for passengers, has been completed ahead of schedule.
Improving peak-time services between Maidenhead and London is one of my priorities as an MP, and it is good news for the town that we are making such progress.
The new Electrostar services were extended from Hayes & Harlington to operate between Maidenhead and London Paddington in May this year at peak times. Today will see a total of eight, eight carriage electric trains now in service, replacing five and six carriage diesel services.
The newly-opened sidings have been delivered 18 months early, and electrification between Maidenhead and London Paddington was also completed ahead of time after being funded and delivered by the Crossrail project. The new sidings will be used by Elizabeth line trains from 2019.
Mark Langman, route managing director for Network Rail, said: It is a real honour to have the Prime Minister with us to officially open the sidings which will allow more of the fantastic new GWR electric trains to run between Maidenhead and London Paddington.
By delivering the sidings 18 months early it allows passengers to enjoy the benefits of electrification and our Railway Upgrade Plan sooner than expected.
Mark Hopwood, GWR Managing Director, said: The Thames Valley is one of the most popular rail corridors in the UK. We have promised the current fleet would be upgraded to provide much needed additional capacity and more comfortable, quieter journeys.
We started to run our first new electric trains between Paddington and Maidenhead in May and I am delighted to be here today, as we further increase the number of new, eight carriage electric trains in service.
ENDS
The newly-opened sidings have been delivered 18 months early, and electrification between Maidenhead and London Paddington was also completed ahead of time after being funded and delivered by the Crossrail project.
Talk about rewriting history.
For years, the mantra was that Paddington-Oxford/Newbury/Bristol was supposed to be finished by Dec 2016.
I take it as there's plenty of activity booked for Monday in the sidings that it's going to be energised by then? Those 8 units in there all still have the pans down so I'm assuming it isn't yet?
Let's just hope the wires, when in regular service, remain strong and stable...![]()