Alstom submit plans for Halebank, Widnes site!

Status
Not open for further replies.

childwallblues

Established Member
Joined
3 Jul 2014
Messages
3,885
Location
Liverpool, UK
The original date was May. However, for all we know it is open, but currently not excepting trains for obvious reasons. Remember, it is just not soley to repaint the Pendolino's, it is also a training facility, hence taking on upto 60 apprentices too (understand September start for them?). Currently, Newstead Road Bridge still has security access by the roundabout so preventing access to the public road. I would assume when Depot fully operational that would be gone.
Thanks Doug
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Signal Head

Member
Joined
26 May 2013
Messages
466
The physical connection to the existing Ditton Sidings is due to go in over this weekend.
 

Dixie

Member
Joined
19 Feb 2012
Messages
160
Went past the new facility this afternoon on way back from the DEMU Showcase at Burton Upon Trent. The connection into Ditton sidings seems to have been made and several masts have been erected.
 

Attachments

  • alstom_1.jpg
    alstom_1.jpg
    118.8 KB · Views: 85
  • alstom_2.jpg
    alstom_2.jpg
    112.4 KB · Views: 80
  • ditton_sidings.jpg
    ditton_sidings.jpg
    97.8 KB · Views: 73

childwallblues

Established Member
Joined
3 Jul 2014
Messages
3,885
Location
Liverpool, UK
Looking at those images, I would say they are. By the way, it is "Alstom", there is no "h" in the name - yes there use to be but not now.
Yes Doug we are all guilty of errors in spelling at times. Even you in your reply failed to put the "d" on the end of use!
 

8A Rail

Established Member
Joined
6 Dec 2012
Messages
1,351
Location
Mars
Yes Doug we are all guilty of errors in spelling at times. Even you in your reply failed to put the "d" on the end of use!
Yes, correct but I suspect you may of not been aware that Alstom dropped the "h" , that was the reason for letting you (& others) aware of it. I had previously spelt it with a "h' too. (So not a spelling lesson as you were thinking) :(
 
Last edited:

Dixie

Member
Joined
19 Feb 2012
Messages
160
Are the masts on the Alsthom site?

Yes, they are. They go right up to the doors where there is a large final portal. Not yet clear if the wires will continue into the workshop. At least one mast appears to have the arms fitted. Not sure if it was wired in.
 

Dixie

Member
Joined
19 Feb 2012
Messages
160
Changing tack will ALSTOM require a shunting loco on site?

I did ponder this question myself and looking at the large OHLE portal positioned immediately in front of the doors to the facility I think it is likely that the wires will be terminated at that point, rather than continuing into the building, meaning that a shunter would be needed. The only other possibility might be a tractor and/or winching system of some sort, a bit like they use at the Bombardier factory at Derby.
 

8A Rail

Established Member
Joined
6 Dec 2012
Messages
1,351
Location
Mars
Info I had which was well over 6 months ago, as far as I am aware the answer was yes but no firm decision had been made so a possibility there could one of those 4 wheel box type shunters instead. As like the Edge Hill facility, there will not be any wires inside the shed. HTH.
 

childwallblues

Established Member
Joined
3 Jul 2014
Messages
3,885
Location
Liverpool, UK
Info I had which was well over 6 months ago, as far as I am aware the answer was yes but no firm decision had been made so a possibility there could one of those 4 wheel box type shunters instead. As like the Edge Hill facility, there will not be any wires inside the shed. HTH.
l was not aware that the one at Edge Hill had ever worked there.
 

driver_m

Established Member
Joined
8 Nov 2011
Messages
2,248
Info I had which was well over 6 months ago, as far as I am aware the answer was yes but no firm decision had been made so a possibility there could one of those 4 wheel box type shunters instead. As like the Edge Hill facility, there will not be any wires inside the shed. HTH.

Edge Hill IS wired inside.

The only part that isnt wired is the pit, which is never used.

They are expecting to use a shunt engine to enable moving the split coaches around.
 

8A Rail

Established Member
Joined
6 Dec 2012
Messages
1,351
Location
Mars
Edge Hill IS wired inside.
The only part that isnt wired is the pit, which is never used.
They are expecting to use a shunt engine to enable moving the split coaches around.

Is it - not so obvious then when you look at these images -

29488210773_dfa85576a0.jpg


29821314720_c20489d6d5.jpg
 

driver_m

Established Member
Joined
8 Nov 2011
Messages
2,248
Depot now connected to mainline acc to notices. Via a ground frame release from Ditton Box.
 

8A Rail

Established Member
Joined
6 Dec 2012
Messages
1,351
Location
Mars
A reliable source has confirmed that a Class 08 will be allocated to the depot. (Dont shoot the messenger please).
 

8A Rail

Established Member
Joined
6 Dec 2012
Messages
1,351
Location
Mars
The Halebank facility was opened today with Pendolino 390104 on site.
Pendo 390104 due back at Edge Hill later today, arrived at Widnes on 28th. I must admit this week parking has been at a premium in and around the site including over the railway bridge and Newstead Road, so something was up. I've notice some road laying vehicles around - may they are laying the road into the depot along with car parking?
 

childwallblues

Established Member
Joined
3 Jul 2014
Messages
3,885
Location
Liverpool, UK
The Halebank facility was opened today with Pendolino 390104 on site.

The opening of the depot was on the BBC North West News. When asked about the possibility of train building at the site the manager stated that if the company won a contract for new tube trains for London they would be built at Widnes.
 