Hi all. I have just been having a think about all the SWT stock which First will be withdrawing soon. Basically if i was them this is what i would do with all of the units:
Convert all of the AGA / FTPE / HC / LM 350s and 360s in to 450s (by adding third rail and end corridor connections where necessary) and send them all to SWT. This when mean that SWT would have a fleet of 240 (instead of 127 currently) four coach class 450 EMUs. This would also mean that they would no longer need to use the 442s and could use extra 450s instead. This would also allow SWT to run far more 12 coach trains. The new LM franchise (which hopefully wont be Govia) could then order a brand new fleet of trains (which will probably happen anyway).
Send all of the 707s to GTR but convert them to four coaches and use them on coastway services to replace all of the 313s. Then use the removed coaches to help extend all of the 8 coach 700s to 12 coaches (in addition to ordering some more coaches as well as this wont be quite enough). TL is very overcrowded and the eight coach trains are simply not enough.
Send all of the 458s to Abellio Scotrail and merge them with the 334s to create four coach units (a sort of similar project to the 458 and 460 conversions).
Send all of the 455s and 456s to GTR Southern to allow them to run 12 coach trains across the Metro network. A few platform extensions or adding SDO would be necessary but this is very simple to do.
As we all know common sense doesn't exist in the UK railway industry so i imagine the DFT and the TOCs will probably come up with some silly ideas instead for these trains.
But i am just interested what others think of this? Is there a chance that any of this might happen? Does anyone think these would be good idea for them? If not what what would you suggest should happen with them?
Many thanks.
Convert all of the AGA / FTPE / HC / LM 350s and 360s in to 450s (by adding third rail and end corridor connections where necessary) and send them all to SWT. This when mean that SWT would have a fleet of 240 (instead of 127 currently) four coach class 450 EMUs. This would also mean that they would no longer need to use the 442s and could use extra 450s instead. This would also allow SWT to run far more 12 coach trains. The new LM franchise (which hopefully wont be Govia) could then order a brand new fleet of trains (which will probably happen anyway).
Send all of the 707s to GTR but convert them to four coaches and use them on coastway services to replace all of the 313s. Then use the removed coaches to help extend all of the 8 coach 700s to 12 coaches (in addition to ordering some more coaches as well as this wont be quite enough). TL is very overcrowded and the eight coach trains are simply not enough.
Send all of the 458s to Abellio Scotrail and merge them with the 334s to create four coach units (a sort of similar project to the 458 and 460 conversions).
Send all of the 455s and 456s to GTR Southern to allow them to run 12 coach trains across the Metro network. A few platform extensions or adding SDO would be necessary but this is very simple to do.
As we all know common sense doesn't exist in the UK railway industry so i imagine the DFT and the TOCs will probably come up with some silly ideas instead for these trains.
But i am just interested what others think of this? Is there a chance that any of this might happen? Does anyone think these would be good idea for them? If not what what would you suggest should happen with them?
Many thanks.