• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Factors affecting line speeds through stations

Status
Not open for further replies.

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,916
Location
Fenny Stratford
Up to 125mph, if the track is straight enough, the signalling is up to it, and the permanent way and all associated structures are up to the necessary standard, etc...

And that's why signs say to stand back!

see Northallerton as an example!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

rob w

Member
Joined
18 Apr 2011
Messages
17
Highly unlikely. At Haddenham, anything on the up road not stopping will almost certainly be doing 100mph through the platforms unless there is a bit of disruption on the line however on the down road the fast Birmingham often catches the fast Oxford up in that area and will be running a bit slower than usual.

especially if the stock is limited to 75mph
 

kieron

Established Member
Joined
22 Mar 2012
Messages
3,283
Location
Connah's Quay
Just for completeness, the yellow line requirement only comes in at 100 mph for passenger trains, but 60 mph for freight trains because they are not aerodynamic (especially containers as mentioned earlier).
That's interesting. I know the bottom line through Shotton has a 75mph limit on it, and had this long before the yellow lines were drawn on it. I don't know how fast freight trains actually go through there, though. Do you know if there's a standard way to handle this sort of situation?
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,665
Location
Nottingham
The yellow line appears in many places with much lower speeds, presumably as a risk mitigation measure where overcrowding is a concern. One example is Manchester Piccadilly through platforms, permitted speed about 15mph I think. The announcements for each train, and sometimes the platform staff, remind people to keep behind the line.
 

Cherry_Picker

Established Member
Joined
18 Apr 2011
Messages
2,825
Location
Birmingham
especially if the stock is limited to 75mph

I've got no interest in counting, but I'd imagine the number of class 165 (75mph) trains which pass through Haddenham & Thame without stopping on a typical day is extremely small, almost to the point of insignificance. It's really only the Birmingham service and about half of the Oxfords which don't call at Haddenham and they are almost always formed of 100mph stock. The 165s should usually be following the 100mph stock too. Most of the problems causing delays there are really about signal section lengths rather than stock limitations. A uniform 100mph fleet would be most welcome, and it's a shame that the Chiltern service is held back by both things really.
 
Last edited:
Status
Not open for further replies.

Top