5 minute job; tops. Line block, litter picking stick.
An old shunting or hook switch pole might had been man enough for the trolley if one was available nearby
Last edited:
5 minute job; tops. Line block, litter picking stick.
5 minute job; tops. Line block, litter picking stick.
You would think.
Line block,
Current off
Wait for MOM
Canx trains
Brighton in chaos.
Did not help that the blue trolley was nice and metally.
Except none of the metally trolley was in contact with the juice rail and could have been retrieved from the platform and the rest looks like cardboard and general trash that could also have been recovered from the platform.
Waiting for a mom.....The railway really has gone mad.
Most of that stuff, especially the crucial metal trolley could have been recovered FROM the platform.
It is crap though, station staff should have some form of training that allows them to access the line in specific situations. That could have been dealt with in less than five minutes. Staff phone signaller for a line block, signaller grants blockage, staff remove things, give up line block, job done. Granted it may be slightly trickier with the third rail as you may have get the ECRO involved, however, when I was having my PTS training in 1993, we were shown how to operate hook switches. Senior platform staff used to be able to flag signals and wind/clip points.
You aren't going to recover a probably very weighty metal trolley from the platform, except with the aid of some sort of small industrial crane. Very unlikely. The practical solution is for it to be manhandled back up onto the platform.
May be a silly question, but: Don't both the up and the down lines split at Haywards Heath into two tracks in each direction? Wouldn't it have been possible to keep trains running, but route all the ones scheduled to go over the affected track into the other platform for that direction instead, until people were ready to safely pick up the trolley? Could the timetable have (roughly) coped with that without too much disruption?
This is indeed what happened, but it's not helped by two up attachments and two down detachments every hour that have train overtaking while they take place. Also as it not a planned or temporary current switch off of the electrical sections but an emergency switch off including the abutting sections which would of closed most of the railway from Hassocks to Balocombe Jcn. So a way was found just to switch off from Copyhold Jcn to Haywards Heath for the Up + Dn main lines instead as it wasn't a true life or death type of emergency switch off.
An old shunting or hook switch pole might had been man enough for the trolley if one was available nearby
Yep, it was basically negotiated down to a switch off for Platforms 2 and 3 and the short adjacent stretch. Initially it appears to have been treated as a "worst case scenario" of a large metal industrial bin on the track, rather than the small waste trolley it turned out to be.
I believe you and I probably sit on opposite sides of the BML, so we might of seen events unfold from out respective desks.