• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Class 373 Eurostar withdrawals

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,183
Some of the spares might also be useable on SNCFs older TGVs

To be more specific, I meant that the only reasons for stripping components would be for reuse, melting down separately or to keep some as 'souveniers'.
 

antharro

Member
Joined
20 Dec 2006
Messages
710
It could be recycling to a "higher" standard. Consider car recycling - the Japanese strip down their cars pretty far before baling the remaining body/chassis. Fluids out, air con gas out, wiring out, plastics out, electronics out, engine and box out, etc, etc. Compare with the USA which still, in 2017, allows some states to rip engines out letting fluids drain into the ground, release air con gases into the atmosphere, etc, then bail the remains, preferring to try to sort out the post-shred mess. The Japanese end up with a cleaner, purer stream of recyclable material, whereas the Americans end up with a higher percentage of post-shred waste. (We're somewhere in between them - not quite as good as the Japanese but not as bad as some places in the USA!)

So it could be something like this where the end product is of higher quality (and therefore worth more) than if it had been ripped apart by a grab.
 
Last edited:

33Hz

Member
Joined
2 Dec 2010
Messages
513
True, but given that large numbers of the original TGVs have been withdrawn is it not likely that SNCF already have sufficient spare parts for their own needs?

The withdrawn PSE sets are more than ten years older than the Eurostar TMSTs and a whole generation of technology different.

There will shortly be a whole load of TGV Atlantique sets getting replaced too, but those too are older than the TMST although have more in common with it. For example, the PSE sets have DC traction motors whereas the Atlantique and TMST ones are AC, like the later Réseau which is still going to be in service for a while.

The signalling system on the TMST is the same as the later generation of Réseau and Thalys TGVs too, so that might find a new home with them.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,861
Location
Beeston (Notts)
For example, the PSE sets have DC traction motors whereas the Atlantique and TMST ones are AC, like the later Réseau which is still going to be in service for a while.

The signalling system on the TMST is the same as the later generation of Réseau and Thalys TGVs too, so that might find a new home with them.

Almost correct regarding the traction motors; while both are AC, the Atlantique's motors are synchronous, as opposed to the asychronous ones on the 373s. Some of the Réseau sets are being withdrawn as well (the single-deck ones; AFAIK no Réseau-Duplex sets have been withdrawn yet).

Good point on the signalling system though.
 

TimboM

Established Member
Joined
12 Apr 2016
Messages
3,734
It could be recycling to a "higher" standard. Consider car recycling - the Japanese strip down their cars pretty far before baling the remaining body/chassis. Fluids out, air con gas out, wiring out, plastics out, electronics out, engine and box out, etc, etc. Compare with the USA which still, in 2017, allows some states to rip engines out letting fluids drain into the ground, release air con gases into the atmosphere, etc, then bail the remains, preferring to try to sort out the post-shred mess. The Japanese end up with a cleaner, purer stream of recyclable material, whereas the Americans end up with a higher percentage of post-shred waste. (We're somewhere in between them - not quite as good as the Japanese but not as bad as some places in the USA!)

So it could be something like this where the end product is of higher quality (and therefore worth more) than if it had been ripped apart by a grab.

This was my thinking - with also an element of it being a (comparatively) modern machine with more components/materials involved - so a more careful dismantling to maximise recycling/scrap value of the constituent parts, rather than just trashing it into a heap and hoping it'd be mostly steel...
 

AlanFry1

Member
Joined
17 Nov 2011
Messages
662
How about moving some of the 373s to ease congestion on the Enfield Town, Cheshunt to Liverpool Street lines? 317s are failing all across, sometimes feel they are going to fall apart. 373s will help ease congestion. Not as daft as it sounds!
 

SpacePhoenix

Established Member
Joined
18 Mar 2014
Messages
5,491
How about moving some of the 373s to ease congestion on the Enfield Town, Cheshunt to Liverpool Street lines? 317s are failing all across, sometimes feel they are going to fall apart. 373s will help ease congestion. Not as daft as it sounds!

That would probably need a fairly major upgrade to the OLE and the power feeds to the OLE to avoid overloading the OLE. They might also be too long , taking up too many signalling sections, possibly reducing overall capacity
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,183
Not as daft as it sounds!

Err... yes it is.


That would probably need a fairly major upgrade to the OLE and the power feeds to the OLE to avoid overloading the OLE. They might also be too long , taking up too many signalling sections, possibly reducing overall capacity

We've been through it many times, infrastructure is the least of the problems.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,861
Location
Beeston (Notts)
How about moving some of the 373s to ease congestion on the Enfield Town, Cheshunt to Liverpool Street lines? 317s are failing all across, sometimes feel they are going to fall apart. 373s will help ease congestion. Not as daft as it sounds!

Nope. Just no. 317s are fairly light, 4-coach trains with distributed traction motors, very quick off the mark.
373s meanwhile, heavy, 18-coach trains with 2 powercars (where the traction motors are concentrated), and as has been said many times, need a huge amount of tractive effort to get the thing moving. They are also very sluggish. Sure, the 373 may beat a 317 in a race to Paris, but from Liverpool Street to Hackney Downs, the 317 will win, hands down.

Case. Closed.

Now, moving 365s to replace the 317s may not seem like such a bad idea, but that is a discussion for another thread.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,183
Nope. Just no. 317s are fairly light, 4-coach trains with distributed traction motors fitted only to the one motor coach, very quick fairly slow by any standard off the mark.

Now, moving 365s to replace the 317s may not seem like such a bad idea, but that is a discussion for another thread.

The Class 317s are being fully replaced by the Class 720 Aventras, so I'm not sure why it even needs discussion.
 

ChilternTurbo

Member
Joined
15 Jun 2016
Messages
323
Err... yes it is.
We've been through it many times, infrastructure is the least of the problems.

This. They are bespoke and highly complex trains that were built for the purpose of operating through the Channel Tunnel and travelling at sustained high speeds. The use of these by GNER inter-city services in the early noughties wasn't exactly a glittering success so the use of using them on outer-suburban routes is positively ludicrous…
 
Last edited:

sk688

Member
Joined
11 Sep 2016
Messages
847
Location
Dublin
How about moving some of the 373s to ease congestion on the Enfield Town, Cheshunt to Liverpool Street lines? 317s are failing all across, sometimes feel they are going to fall apart. 373s will help ease congestion. Not as daft as it sounds!

Absolutely . Just line all the 373's up nose to nose: , make them walk through and add travelators so the passengers can make their journey :D
 

Southern Dvr

Member
Joined
13 Oct 2010
Messages
991
The only place that you could use them really would be South Eastern High Speed in the rush hours as 75% of the route is what they do already. But refitting shoe gear and traction training etc.. really makes that unfeasible as well.
 

AlanFry1

Member
Joined
17 Nov 2011
Messages
662
Nope. Just no. 317s are fairly light, 4-coach trains with distributed traction motors, very quick off the mark.
373s meanwhile, heavy, 18-coach trains with 2 powercars (where the traction motors are concentrated), and as has been said many times, need a huge amount of tractive effort to get the thing moving. They are also very sluggish. Sure, the 373 may beat a 317 in a race to Paris, but from Liverpool Street to Hackney Downs, the 317 will win, hands down.

Case. Closed.

Now, moving 365s to replace the 317s may not seem like such a bad idea, but that is a discussion for another thread.

Well I heard that 365s are not allowed on that route?
 

physics34

Established Member
Joined
1 Dec 2013
Messages
4,089
How about moving some of the 373s to ease congestion on the Enfield Town, Cheshunt to Liverpool Street lines? 317s are failing all across, sometimes feel they are going to fall apart. 373s will help ease congestion. Not as daft as it sounds!

why suggest this when there are 365s and will be spare 319s around...
 

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,839
Location
Epsom
The only place that you could use them really would be South Eastern High Speed in the rush hours as 75% of the route is what they do already. But refitting shoe gear and traction training etc.. really makes that unfeasible as well.

Except that they won't fit into the platforms on the SouthEastern side of St Pancras.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Except that they won't fit into the platforms on the SouthEastern side of St Pancras.

the same goes for the domestic platforms at Stratford International, Ebbsfleet and Ashford, not to mention all the other stations on the classic network in Kent.
 

33Hz

Member
Joined
2 Dec 2010
Messages
513
And the reason they couldn't have been shortened? Surely a power car could be coupled to the split section of coach 9? Or even have less coaches in the rake like the NoL sets.

What would stop them using the GWML when that project is finished?
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,871
What would stop them using the GWML when that project is finished?

The fact that several of the sets are now little pieces littering the area around Tamworth might be a slight issue...
 
Joined
19 Aug 2015
Messages
18
Not my picture.... :( ... sad to see them in this state...

160q64j.jpg
 

Ash Bridge

Established Member
Joined
17 Mar 2014
Messages
4,221
Location
Stockport
Excellent shot, thanks for posting, I'm curious about the pair of 08s on the front of the 2 pairs of back to back powercars, wonder are they used to position the PCs for final scrapping, then when released bring in the next ones or are they scrappers themselves? Obviously a different technique used for the articulated trailer cars as the body shells appear to have been lifted of their running gear before commencing the breaking up.
 
Status
Not open for further replies.

Top