Yes track realignment and junction alteration is being done alongside electrification, by the end of the year it will be in majority a 100mph line (with of course some much slower sections).
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

andyb2706

Member
Joined
21 Jan 2013
Messages
747
Location
Manchester
Very interesting.

Is this the first formal confirmation that Bolton electrification will be 2018, rather than 2017? (Page 8: "May 18 – electrification of the Bolton corridor, capacity improvements between Manchester Victoria and Stalybridge together with the arrival of more rolling stock will enable the introduction of significant, further enhancements.")

Hi there sorry if someone has already answered to this but I have just stumbled over this thread.

Could mean what you say, however, I do know that the Ordsall Chord is due for completion this December but planned TPE services are not expected to commence until May 2018 allowing for any issues in slight overrun and commissioning. The TOC's and Network Rail don't want to get caught with their trousers down! This could be the same for the Bolton corridor.

Having said all that there still seems a lot of work to be done on the Bolton corridor.
 
Last edited:

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
You don't see them in Bolton very often (if at all) these days.

But 185s, 319s and 350s will be able to take advantage, as well as future Northern/TPE stock. 75mph stock will eventually be in the minority on the corridor.

I wonder if Northern will be allowed to continue sub-leasing 185s until May 2018, for the Manchester Airport to Barrow/Windermere services?

No doubt TPE's rolling stock plan assumed that these units would be available to strengthen its own services from December 2017.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
I wonder if Northern will be allowed to continue sub-leasing 185s until May 2018, for the Manchester Airport to Barrow/Windermere services?

No doubt TPE's rolling stock plan assumed that these units would be available to strengthen its own services from December 2017.

TPE's rolling stock plan was based on having all 51 x 185s and 2 x loco-hauled mk3 sets for the December 2017 timetable change which would then allow the 6th Leeds-Manchester service and an hourly Newcastle to Manchester Airport service. However, it seems TPE, like Northern, are only proposing doing some of their planned December 17 enhancements at the December 17 timetable change date.
 

jbg

Member
Joined
29 Mar 2017
Messages
105
TPE's rolling stock plan was based on having all 51 x 185s and 2 x loco-hauled mk3 sets for the December 2017 timetable change which would then allow the 6th Leeds-Manchester service and an hourly Newcastle to Manchester Airport service. However, it seems TPE, like Northern, are only proposing doing some of their planned December 17 enhancements at the December 17 timetable change date.

Hopefully because they've realised the timetable doesn't work now, let alone when they try and squeeze yet another service into it.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Hopefully because they've realised the timetable doesn't work now, let alone when they try and squeeze yet another service into it.

The 6th service will replace the two Northern stopping services and it and the Hull service will become 'semi-fasts' so it might actually improve reliability on the route.

The 6th service is a franchise commitment and one that DfT included in the minimum service level requirements, unlike the North TPE service to Edinburgh which was an option First chose to include in their franchise bid.

The changes that don't happen in December 2017 will happen in May 2018 instead but it doesn't seem the TPE changes going ahead have been synced with the Northern changes going ahead e.g. Northern don't mention taking over a Liverpool-Warrington-Manchester semi-fast but TPE do mention diverting Scarborough services via Chat Moss.
 

jbg

Member
Joined
29 Mar 2017
Messages
105
The 6th service will replace the two Northern stopping services and it and the Hull service will become 'semi-fasts' so it might actually improve reliability on the route.

The 6th service is a franchise commitment and one that DfT included in the minimum service level requirements, unlike the North TPE service to Edinburgh which was an option First chose to include in their franchise bid.

The changes that don't happen in December 2017 will happen in May 2018 instead but it doesn't seem the TPE changes going ahead have been synced with the Northern changes going ahead e.g. Northern don't mention taking over a Liverpool-Warrington-Manchester semi-fast but TPE do mention diverting Scarborough services via Chat Moss.

Northern really needs to come clean about the reduction in services locally.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Northern really needs to come clean about the reduction in services locally.

No stations will see a service reduction. However, some towns/villages will no longer have direct services to other towns/villages on the same line. Network Rail undertook consultation on the changes and said their findings indicated generally people who used the Huddersfield-Victoria stopper didn't mind having a service to Piccadilly instead of Victoria. They also found a number of people said they preferred the idea of their town/village getting a new direct service to Leeds/Manchester over retaining a service to every town and village on the line.
 

Rail Bus

Member
Joined
10 Mar 2012
Messages
92
No stations will see a service reduction. However, some towns/villages will no longer have direct services to other towns/villages on the same line. Network Rail undertook consultation on the changes and said their findings indicated generally people who used the Huddersfield-Victoria stopper didn't mind having a service to Piccadilly instead of Victoria. They also found a number of people said they preferred the idea of their town/village getting a new direct service to Leeds/Manchester over retaining a service to every town and village on the line.

What will the stopping pattern be?
 

jbg

Member
Joined
29 Mar 2017
Messages
105
What will the stopping pattern be?

Skip-stop, so fewer trains stopping at local stations. Some journeys between stations adjacent no longer possible. When TPX is running late, they'll run fast and miss out smaller stations.

Simple solution: Make the trains longer, and leave the stopping pattern as it is.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
What will the stopping pattern be?

Service A: Stalybridge, Greenfield, Marsden, Huddersfield, Dewsbury and Batley (plus two out of Deighton, Mirfield, Ravensthorpe, Morley)

Service B: Stalybridge, Mossley, Slaithwaite Huddersfield, Dewsbury and Batley (plus two out of Deighton, Mirfield, Ravensthorpe, Morley)

Cottingley will be served by a call on the Southport-Leeds via Dewsbury (Northern) service and by TPE services at peak times only.
 

50032

Member
Joined
3 Mar 2016
Messages
163
Network Rail undertook consultation on the changes and said their findings indicated generally people who used the Huddersfield-Victoria stopper didn't mind having a service to Piccadilly instead of Victoria.
Will there be regular Northern services from Huddersfield to Piccadilly? My memory of the franchise spec is hazy now, but I thought Piccadilly was only to be served by the odd service during the morning and evening peaks.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Skip-stop, so fewer trains stopping at local stations. Some journeys between stations adjacent no longer possible. When TPX is running late, they'll run fast and miss out smaller stations.

Are you sure? TPE currently prefer to turn around services early rather than skip stations when they run late.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Will there be regular Northern services from Huddersfield to Piccadilly? My memory of the franchise spec is hazy now, but I thought Piccadilly was only to be served by the odd service during the morning and evening peaks.

Not regular. Network Rail said they'll be an option for an electric Piccadilly-Huddersfield stopper alongside 6tph on North TPE once electrification is completed but that also depends on whether demand is sufficient. However, a limited peak time Northern service has been allowed for in the franchise specs.

The 'semi-fasts' will go to Piccadilly via Guide Bridge, the Airport services will eventually go to the Airport via Victoria and the Ordsall Chord, while the Liverpool services will end up going via Victoria and Chat Moss and not serving Piccadilly at all.
 

jbg

Member
Joined
29 Mar 2017
Messages
105
Are you sure? TPE currently prefer to turn around services early rather than skip stations when they run late.

We'll be loosing the Huddersfield - Leeds stopper.

Some stations will be served by Huddersfield to Castleford, so no direct link to Wakefield Westgate anymore. Then the local will be from Victoria - Leeds via Dewsbury. Some peak TPX will call at some stations, but why serve Cottingley, when even Northern only serves it 1tph.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Some stations will be served by Huddersfield to Castleford, so no direct link to Wakefield Westgate anymore.

I would imagine that'll be down to the extra VTEC services running through Westgate rather than related to 6tph on North TPE.

Some peak TPX will call at some stations, but why serve Cottingley, when even Northern only serves it 1tph.

TPE will be providing a half-hourly service at Batley and an hourly service at Deighton, Mirfield, Ravensthorpe and Morley. Northern's Leeds-Dewsbury-Victoria service pattern will remain the same except for the additional Cottingley call. With an odd number of stations getting an hourly service (after Batley's enhancement) they wouldn't split evenly between the two TPE services, so Cottingley will get the 'short straw' of refreshed 170s calling at it instead of Pacers, rather than refurbished 185s.
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
The changes that don't happen in December 2017 will happen in May 2018 instead but it doesn't seem the TPE changes going ahead have been synced with the Northern changes going ahead e.g. Northern don't mention taking over a Liverpool-Warrington-Manchester semi-fast but TPE do mention diverting Scarborough services via Chat Moss.
Previously posted on the Scarborough TPE thread:
The timetable change will now take place in May 2018....

The Liverpool to Scarborough service will call at Newton Le Willows
The Liverpool to Newcastle (Edinburgh) service will call at St Helens Jn

The Newcastle train currently stands at Man Vic for 5-6 mins eastbound anyway if it has a clear run.
 

Shaw S Hunter

Established Member
Joined
21 Apr 2016
Messages
3,497
Location
Over The Hill
Skip-stop, so fewer trains stopping at local stations. Some journeys between stations adjacent no longer possible.

How many people actually make such journeys? And how many people are instead using parallel bus services which run closer to where they want to go and run at better frequencies than the rail service? The skip-stop pattern allows a greater number of through services to run and also imposes less of a journey time penalty. This will benefit more people than the number who may lose out through the loss of the purely local service element.

When TPX is running late, they'll run fast and miss out smaller stations.

And would require them to run replacement buses or taxis at short notice and additional expense as well as risk delay-repay penalties. Far simpler (as jcollins has pointed out) to turn the train short further along where alternative onward connections exist. Or if late-running is endemic re-draw the unit diagrams.

Simple solution: Make the trains longer, and leave the stopping pattern as it is.

As I suggested in another thread, and you denied, you are resistant to change. The changes have not just been dreamed up at the last minute but have been carefully considered and consulted on. The outcome will provide the best overall outcome to the greatest number of people while providing acceptable value for money. Making the trains longer needs more (expensive) rolling stock and would also require (expensive) platform lengthening at relatively lightly used stations.
 

Rail Bus

Member
Joined
10 Mar 2012
Messages
92
Service A: Stalybridge, Greenfield, Marsden, Huddersfield, Dewsbury and Batley (plus two out of Deighton, Mirfield, Ravensthorpe, Morley)

Service B: Stalybridge, Mossley, Slaithwaite Huddersfield, Dewsbury and Batley (plus two out of Deighton, Mirfield, Ravensthorpe, Morley)

Cottingley will be served by a call on the Southport-Leeds via Dewsbury (Northern) service and by TPE services at peak times only.
So Stalybridge lose its fast services to Yorkshire, and Hull lose its fast service to Manchester?

Also will the semi-fasts cope with local passengers and those going to Leeds/Hull from Piccadilly? I thought the local stations, particularly east of Huddersfield had seen massive patronage growth that the current Northern services were struggling to cope with already

Have to say 4 longer fasts with 2 still calling at Stalybridge and Dewsbury would seem to work better. With 2 stoppers turning at Huddersfield from both east and west (or through and looped at Huddersfield). I would add the Hull as a portion working to one of the fasts as well
 

Bevan Price

Established Member
Joined
22 Apr 2010
Messages
8,341
I don't know about midweek, but on Saturday afternoon and early evening, many of the Manchester - Huddersfield stoppers can be heavily loaded. Do they really think that all these passengers are going to fit into 3 coach 185s that will also be carrying longer-distance passengers ?

(And Ashton seems to suffer, losing all through trains east of Stalybridge unless I have missed something. )
 

jbg

Member
Joined
29 Mar 2017
Messages
105
I don't know about midweek, but on Saturday afternoon and early evening, many of the Manchester - Huddersfield stoppers can be heavily loaded. Do they really think that all these passengers are going to fit into 3 coach 185s that will also be carrying longer-distance passengers ?

(And Ashton seems to suffer, losing all through trains east of Stalybridge unless I have missed something. )

We'll just have passengers left on the platforms.

How many people actually make such journeys? And how many people are instead using parallel bus services which run closer to where they want to go and run at better frequencies than the rail service? The skip-stop pattern allows a greater number of through services to run and also imposes less of a journey time penalty. This will benefit more people than the number who may lose out through the loss of the purely local service element.



And would require them to run replacement buses or taxis at short notice and additional expense as well as risk delay-repay penalties. Far simpler (as jcollins has pointed out) to turn the train short further along where alternative onward connections exist. Or if late-running is endemic re-draw the unit diagrams.



As I suggested in another thread, and you denied, you are resistant to change. The changes have not just been dreamed up at the last minute but have been carefully considered and consulted on. The outcome will provide the best overall outcome to the greatest number of people while providing acceptable value for money. Making the trains longer needs more (expensive) rolling stock and would also require (expensive) platform lengthening at relatively lightly used stations.

I'm not resistant to improvements, but these changes don't improve anything.

The TPX services are already over-full, and you seem to think it's a good idea to ram more passengers from the also over-full local services onto them.

Lots of people go between Dewsbury and Batley for instance, and between Batley and Morley. There are more trains between the Station area in Batley and Dewsbury than Busses. (If you'd ever actually been here, you'd know that Batley Rail Station is a good distance from the Town centre, but, is close to Collage and other educational areas. The Train takes a matter of 2-3 min's, and the Bus can take well over twenty with the uphill walk at the end.

If a TOC cancels a train, it doesn't "run replacement buses or taxis at short notice" it makes people wait for the next service.

If they've a spare unit to run a 6th service, then they have a spare unit to double up an existing service.

There are no platforms where TPX currently calls that cannot accommodate a six car 185.

The current service does not work because of too many TPX delays, not because of local services. If there were fewer TPX, but longer, there may be chance of a more robust timetable.

Delays are caused at the Victoria - Liverpool end, as the so called non-stop between those two places regularly gets stuck behind the stopping service.

On the other hand, I've known the Huddersfield to Leeds stopper get left waiting for over 20 min's at Dewsbury for a cavalcade of TPXs to lumber past.

We could have a far better service with the current infrastructure and units. In fact, fewer longer TPXs would save money, as you'd need fewer expensive drivers.

What is currently being suggested is making TPX journeys longer, what's the sense in that?

But it'll be stations west of Huddersfield who get disadvantaged. ;)

Oh, and you think that's okay then?

It's ALL local stations that get "disadvantaged".

So Stalybridge lose its fast services to Yorkshire, and Hull lose its fast service to Manchester?

Also will the semi-fasts cope with local passengers and those going to Leeds/Hull from Piccadilly? I thought the local stations, particularly east of Huddersfield had seen massive patronage growth that the current Northern services were struggling to cope with already

Have to say 4 longer fasts with 2 still calling at Stalybridge and Dewsbury would seem to work better. With 2 stoppers turning at Huddersfield from both east and west (or through and looped at Huddersfield). I would add the Hull as a portion working to one of the fasts as well

Couldn't agree more.

I would imagine that'll be down to the extra VTEC services running through Westgate rather than related to 6tph on North TPE.

In fact that's not why, it's because there will be 2 tph from Knottingley to Leeds, and one of these will be taking the path "up-hill" to Westgate.

A very (at lest by Railway standards) cheap way to solve this, is to put a bay facing Kirkgate in. Just extend the platform towards the middle line (a line that I only ever seen used once) Just like they did at Huddersfield to make the current P2.

Again, a very well used train being diverted to the detriment of local users. I've asked some of those in the know, and Huddersfield / Mirfield to Castleford, is a journey nobody has ever sold a ticket for. (Maybe there are plans to continue onto York direct).

Why we need another train taking a very convoluted route between Knottingley and Leeds, I've no idea.

At Kirkgate on an evening we had (and may still do) a Knottingley train extended up to Westgate, at exactly the same departure time as the Train to Huddersfield, meaning the two off 2 and 3 were timetabled to use the same crossover at the same time.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Oh, and you think that's okay then?

It's ALL local stations that get "disadvantaged".

No but there's 0% proof it will actually happen but turning around a late running service at Stalybridge is far less worse than the 'worst case scenario' you keep describing which you seem to think is automatically guaranteed by TPE taking over services.

It's just as likely in the event of a cancellation TPE will make additional calls on another service so that stations don't go two hours without a service - when was the last time TPE made a call at Mirfield following a Northern cancellation?
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
I don't know about midweek, but on Saturday afternoon and early evening, many of the Manchester - Huddersfield stoppers can be heavily loaded. Do they really think that all these passengers are going to fit into 3 coach 185s that will also be carrying longer-distance passengers ?

(And Ashton seems to suffer, losing all through trains east of Stalybridge unless I have missed something. )

The 185s are being fitted with SDO.

Also worth remembering currently it's the following hourly service pattern:
Liverpool-Newcastle - 3 car 185
Liverpool-Scarborough - 3 car 185
Manchester Airport- Middlesbrough - 3 car 185
Manchester Airport - York - 3 car 185
Manchester-Hull - 3 car 185
Local stoppers between Manchester and Leeds (2 separate services) - 2 car 142/150

17 carriages per hour.

By December 2019 it'll be:
Liverpool-Edinburgh - 5 car 802
Liverpool-Scarborough - 5 car mk5 set
Manchester Airport- Middlesbrough - 5 car mk5 set
Manchester Airport - Newcastle - 5 car 802
Manchester-Hull - 3 car 185
Manchester-Leeds - 3 car 185

26 carriages per hour even presuming they'll be no doubling up on Hull/Leeds services.
 

jbg

Member
Joined
29 Mar 2017
Messages
105
No but there's 0% proof it will actually happen but turning around a late running service at Stalybridge is far less worse than the 'worst case scenario' you keep describing which you seem to think is automatically guaranteed by TPE taking over services.

And you've 0% proof that it won't.

It's just as likely in the event of a cancellation TPE will make additional calls on another service so that stations don't go two hours without a service - when was the last time TPE made a call at Mirfield following a Northern cancellation?

Never as far as I'm aware.

However, you've just said that the service would be hourly instead of half hourly as now.
 

glbotu

Member
Joined
8 Apr 2012
Messages
644
Location
Oxford
The 185s are being fitted with SDO.

Also worth remembering currently it's the following hourly service pattern:
Liverpool-Newcastle - 3 car 185
Liverpool-Scarborough - 3 car 185
Manchester Airport- Middlesbrough - 3 car 185
Manchester Airport - York - 3 car 185
Manchester-Hull - 3 car 185
Local stoppers between Manchester and Leeds (2 separate services) - 2 car 142/150

17 carriages per hour.

By December 2019 it'll be:
Liverpool-Edinburgh - 5 car 802
Liverpool-Scarborough - 5 car mk5 set
Manchester Airport- Middlesbrough - 5 car mk5 set
Manchester Airport - Newcastle - 5 car 802
Manchester-Hull - 3 car 185
Manchester-Leeds - 3 car 185

26 carriages per hour even presuming they'll be no doubling up on Hull/Leeds services.

I thought it was going to be

Manchester-Hull - 6 car 185
Manchester-Leeds - 6 car 185
 

notlob.divad

Established Member
Joined
19 Jan 2016
Messages
1,609
The issues and solutions to the Manchester-Leeds corridor have to be looked at as part of the bigger picture of changes. They are clearly a massive compromise. Someone has decided to put on 4 fast services per hour between Manchester and Leeds in an attempt to balance passenger loads and make it an almost turn up and go service. All of these will leave Manchester Victoria and be the fastest way to get between the two city centres and beyond. This will therefore be the go to station for people making intercity journeys.

Those going to intermediate stations will go to Piccadilly onto what should be quieter services than they currently are. Sadly in order to avoid blocking the intercity trains, the local trains have to average a higher speed than is possible stopping everywhere. Hence the skip stopping pattern (whatever that may end up being). Yes local services are probably taking a hit to benefit intercity services, but that is a compromise being made across the network.

It may take a while for passenger behaviour / commutes to change, but in the end it does seem like a better service for the vast majority of people is what will be provided, at least as a stop gap until major infrastructure enhancements on the corridor are completed.
 

jbg

Member
Joined
29 Mar 2017
Messages
105
The issues and solutions to the Manchester-Leeds corridor have to be looked at as part of the bigger picture of changes. They are clearly a massive compromise. Someone has decided to put on 4 fast services per hour between Manchester and Leeds in an attempt to balance passenger loads and make it an almost turn up and go service. All of these will leave Manchester Victoria and be the fastest way to get between the two city centres and beyond. This will therefore be the go to station for people making intercity journeys.

Those going to intermediate stations will go to Piccadilly onto what should be quieter services than they currently are. Sadly in order to avoid blocking the intercity trains, the local trains have to average a higher speed than is possible stopping everywhere. Hence the skip stopping pattern (whatever that may end up being). Yes local services are probably taking a hit to benefit intercity services, but that is a compromise being made across the network.

It may take a while for passenger behaviour / commutes to change, but in the end it does seem like a better service for the vast majority of people is what will be provided, at least as a stop gap until major infrastructure enhancements on the corridor are completed.

I don't know where you get that from, as there are already 5 fast tph, now. And TPX want a 6th.

If the TPX were reduced to 4 tph, then we'd have a far more reliable service.
 