This change is one of the few I'm really not looking forward to, if only for personal reasons. As a regular Leeds (starting from Baildon) to Warrington user, the loss of the TPE service means that I will probably have to choose from the Northern Connect service via Bradford & the Calder Valley for Warrington BQ, or look to change at either Piccadilly or Oxford Road to get to Warrington Central.
The former will doubtless mean at least 20-30 mins longer travel time allowing for the journey to Bradford & the reversal out & not having 1st class (which is nicer when we have luggage, plus with a Two Together card only costs about the same as a Standard without). The latter will mean facing the regular ruck on P13/14 to make the changes, or an almost equally big ruck at Oxford Road. We could travel to Newton LW, but usually relying either on a pick up or using a taxi at the Warrington end means it's going to be a bit more difficult / expensive to do, with our final destination being 10+ miles to the south of Warrington. Going to Northwich is another option, but let's not go there.....
One thing does occur to me, even with the delay of the move until May 18 there is likely to be a gap in Leeds-Warrington services until the new 195s land and get into traffic. Not a massive market I'll admit, but with such major changes taking place around Manchester with Ordsall Chord opening and TPEs being re-routed, it is going to cause some extra congestion and confusion.
Anyway, thats my grumble over with, well until May next year .
The former will doubtless mean at least 20-30 mins longer travel time allowing for the journey to Bradford & the reversal out & not having 1st class (which is nicer when we have luggage, plus with a Two Together card only costs about the same as a Standard without). The latter will mean facing the regular ruck on P13/14 to make the changes, or an almost equally big ruck at Oxford Road. We could travel to Newton LW, but usually relying either on a pick up or using a taxi at the Warrington end means it's going to be a bit more difficult / expensive to do, with our final destination being 10+ miles to the south of Warrington. Going to Northwich is another option, but let's not go there.....
One thing does occur to me, even with the delay of the move until May 18 there is likely to be a gap in Leeds-Warrington services until the new 195s land and get into traffic. Not a massive market I'll admit, but with such major changes taking place around Manchester with Ordsall Chord opening and TPEs being re-routed, it is going to cause some extra congestion and confusion.
Anyway, thats my grumble over with, well until May next year .
