Just a thought. Should the Midland Mainline follow the West coast mainline by upgrading the whole line to tilt capability be a good idea or a bad idea?
Tilt is only feasible where the reason for the linespeed limit is comfort, not where the speed round curves is more to do with safe operation. Tilt has little impact on the centre of gravity.
TASS is a mature technology, and it could be deployed elsewhere if NR and the TOCs have the will.
But I don't think they have.
That is totally incorrect. TASS has no connection to signaling.TASS is ETCS though
That is totally incorrect. TASS has no connection to signaling.
TASS is ETCS though
I don't disagree with that conclusion but saying that TASS is ECTS is the same as "Cows have four legs, dogs have four legs therefore dogs are cows."Although TASS balises are "dumb" with no connection to the signalling, they are ETCS balises and TASS is defined in standards as a UK-specific extension to the basic ETCS spec. So it should be possible to obtain ETCS equipment which also incorporates the TASS functionality.
There are few places where tilt would make a significant difference however.
One that might be would be to deploy TASS in Cornwall (which would be useful with Voyagers only) or somewhere in Scotland.
BUt most other places have hard limits on linespeed that are not dependent on curvature.
Just a thought. Should the Midland Mainline follow the West coast mainline by upgrading the whole line to tilt capability be a good idea or a bad idea?
Bad idea. End of.
Says user with a Pendolino as an avatar!!!!!
Bad idea. End of.
It [APT-E] then set the route record from Leicester to London St. Pancras in 58 minutes 30 seconds on 30 October 1975, at an average speed of just over 101 miles per hour (163 km/h) through this twisty route.[
From https://en.wikipedia.org/wiki/Advanced_Passenger_Train
Today the 222 on the fast Sheffield does London to Leicester in 62min. That's a public time inclusive of timing margins, so if a 222 was to do the run under test conditions as APT-E did, it would achieve within a minute or two of the same time. The route north of Leicester is generally better aligned so there would be proportionately less benefit from tilt.
Though there have been very significant changes to the speed-profile of the line since that APT run. (Slightly OT: does anyone else remember the kilometre markers that were put in between London and Leicester for those APT tests, with many of them lingering on in position for years afterwards?)From https://en.wikipedia.org/wiki/Advanced_Passenger_Train
Today the 222 on the fast Sheffield does London to Leicester in 62min. That's a public time inclusive of timing margins, so if a 222 was to do the run under test conditions as APT-E did, it would achieve within a minute or two of the same time. The route north of Leicester is generally better aligned so there would be proportionately less benefit from tilt.
An interesting question is how much time saving would make tilting trains on such a journey (Leicester to London) worthwhile, bearing in mind the drawbacks (complication, narrower profile etc)?
Yes, but that time is, in the main, due to infrastructure improvements since APT's time. If a run was allowed today by a tilting train that was allowed to exceed the current line speed limits, as APT did, I wonder what the time would be?
ROB
Loss of tilt on the WCML post HS2 is a pretty bad idea IMO. Has anyone calculated how much the journey time will extend between Crewe and Glasgow/Edinburgh, without it?
I think the forum member was referring to tilt on the MML and not tilt in general.