The Planner
Veteran Member
- Joined
- 15 Apr 2008
- Messages
- 19,704
GRIP 1-4 on a project that large in 2 years with all the stuff like funding, TWAO and public inquiries that go with it? April 1st is a while yet....
The rail option required changes at Swansea, Carmarthen, Aberystwyth and Dover Junction: too challenging for my grandmother!
Here we go again...
I think the timescale and budgets quoted are somewhat optimistic.
http://m.southwales-eveningpost.co....vice-by-2022/story-30149630-detail/story.html
Plans for a new £1.1bn M4 relief road should not go ahead, Wales' well-being commissioner has said.
The project's public inquiry starts next week but Future Generations Commissioner Sophie Howe believes the plan is "ill-conceived".
The Welsh Government wants to build the new motorway south of Newport to ease congestion via the Brynglas tunnels.
The scheme has prompted objections from opposition parties, environmental groups and some Labour AMs.
A large part of the cost will be met using the Welsh Government's new powers to borrow money
Under a law passed two years ago, Ms Howe has a legal duty to advise Welsh ministers on whether policies or government projects offer the best deal for future generations.
In her submission to the public inquiry, she said: "I believe that using the Welsh Government's borrowing powers to finance one scheme that will, at best, result in geographically, economically and socially disproportionate benefits to one part of Wales is ill-conceived."
She added: "Building roads is what we have been doing for the last 50 years and is not the solution we should be seeking in 2017 and beyond.
"The rationale for a new road was conceived over 25 years ago with the main purpose of addressing congestion in the area.
"I do not agree with the basic premise that this is the 'most sustainable, long-term solution to current social, environmental and economic problems associated with this route'."
The legal duty to consider the impact on future generations - unique to Wales - means the Welsh Government should "explore other ways to address the problem", she added.
Pigs might fly!!
The buying back of the sold-off elements of the route, and the Public Enquiry that would doubtless result with the crossing of the SSSI at Tregaron Bog would take longer than that.
I believe the Tregaron bog is home to genuine Black Adders.......
If that be the case, I can see a "cunning plan" being quickly formulated...![]()
The river running through the town centre leads to Cors Caron, a national nature reserve of peat bog which is one of the most impressive wildlife areas in Wales; home to rare marsh grasses, black adders, buzzards and even the occasional red kite.
Presumably not the lesser spotted 175 or 158.
The river running through the town centre leads to Cors Caron, a national nature reserve of peat bog which is one of the most impressive wildlife areas in Wales; home to rare marsh grasses, black adders, buzzards and even the occasional red kite.
Ah, Baldrick, these misspellings will win the case for us and they didn't even mention the black alders.
It is the darn spell checker that keeps changing our correct wording.
Has anybody figured out how they would get such a rail line into Aberystwyth? Looking on Google Earth/Streetview, I see new houses have been built on the bed of the old railway. Perhaps they will build an expensive tunnel through the hill?
A tunnel through the hill is the only way I think it could be done, BUT even if you went through that you would need a level crossing to reach the station. As Portishead and the Scottish Borders railway have found, you're not allowed to build new level crossings these days, so unless that can be overcome getting into Aberystwyth is a big problem. The only suggestion for avoiding a level crossing would seem to require much longer tunnels. I also think a lengthy tunnel would be needed near the Carmarthen end, to avoid a very slow and twisty section of the old line. Getting this line built would be a very expensive job to do properly, but if you didn't do it properly I don't think it'd be worthwhile.Has anybody figured out how they would get such a rail line into Aberystwyth? Looking on Google Earth/Streetview, I see new houses have been built on the bed of the old railway. Perhaps they will build an expensive tunnel through the hill?
By the time the railway is built, if it ever happens, only heritage trains will have dump toilets. Presumably therefore, you could have a footpath alongside the railway (as long as the formation is wide enough of course, I've only walked a small amount of the route at the Aberystwyth end so I don't know the section in question).I can just see the RSPB closing the footpath on the railway so they can rebuild it.
I've always thought the future generations act needs to put a stop to all this road building to be worth the paper it is written on; now this "Building roads ... is not the solution we should be seeking in 2017 and beyond." is music to my ears, do I dare hope? Before worrying about Carmarthen-Aberystwyth though, I think quite a bit of money needs to be allocated to the GWML between Cardiff and Bridgend / Port Talbot, to allow fast trains from Carmarthen and Milford Haven (perhaps even Aberystwyth in Network Rail's CP8) to overtake the intensive service of stopping 'Cardiff Metro' services. The best way of doing that might be a shorter, faster, new route for fast services between Cardiff and Bridgend, rather than 4-tracking the existing route.More relevant is this
http://www.bbc.co.uk/news/uk-wales-politics-39052153
Under a law passed two years ago, Ms Howe has a legal duty to advise Welsh ministers on whether policies or government projects offer the best deal for future generations.
In her submission to the public inquiry, she said: "I believe that using the Welsh Government's borrowing powers to finance one scheme that will, at best, result in geographically, economically and socially disproportionate benefits to one part of Wales is ill-conceived."
She added: "Building roads is what we have been doing for the last 50 years and is not the solution we should be seeking in 2017 and beyond.
"The rationale for a new road was conceived over 25 years ago with the main purpose of addressing congestion in the area.
"I do not agree with the basic premise that this is the 'most sustainable, long-term solution to current social, environmental and economic problems associated with this route'."
The legal duty to consider the impact on future generations - unique to Wales - means the Welsh Government should "explore other ways to address the problem", she added.
As I've said for ages M4 Relief Road Green Light would be bad news for public transport in Wales as it would hog the funding for years. Without it maybe things can happen even in West Wales........
A tunnel through the hill is the only way I think it could be done, BUT even if you went through that you would need a level crossing to reach the station. As Portishead and the Scottish Borders railway have found, you're not allowed to build new level crossings these days, so unless that can be overcome getting into Aberystwyth is a big problem. The only suggestion for avoiding a level crossing would seem to require much longer tunnels. I also think a lengthy tunnel would be needed near the Carmarthen end, to avoid a very slow and twisty section of the old line. Getting this line built would be a very expensive job to do properly, but if you didn't do it properly I don't think it'd be worthwhile.
By the time the railway is built, if it ever happens, only heritage trains will have dump toilets. Presumably therefore, you could have a footpath alongside the railway (as long as the formation is wide enough of course, I've only walked a small amount of the route at the Aberystwyth end so I don't know the section in question).
I've always thought the future generations act needs to put a stop to all this road building to be worth the paper it is written on; now this "Building roads ... is not the solution we should be seeking in 2017 and beyond." is music to my ears, do I dare hope? Before worrying about Carmarthen-Aberystwyth though, I think quite a bit of money needs to be allocated to the GWML between Cardiff and Bridgend / Port Talbot, to allow fast trains from Carmarthen and Milford Haven (perhaps even Aberystwyth in Network Rail's CP8) to overtake the intensive service of stopping 'Cardiff Metro' services. The best way of doing that might be a shorter, faster, new route for fast services between Cardiff and Bridgend, rather than 4-tracking the existing route.
I am all for rail travel but the fact is that the Newport tunnel (2 lanes each way) on the M4 creates massive traffic jams every day. This effectively cuts off the whole of south Wales from southern England. Accidents are frequent and when the motorway is blocked completely, Newport & environs become completely grid locked. Sophie Howe, the so called Future Generations Commissioner, in advocating no new M4 south of Newport, is threatening the economic viability of southern Wales.
People who use this stretch of M4 would be absolutely appalled to think that money could be spent on a new railway linking Carmarthen and Aberystwyth whilst no new black route M4 was to be built south of Newport.
I hope that the railways can get their act together and have electrification and modern trains which have the capacity to shift large numbers of people in comfort and at reasonable prices. (I would like to see an end to book ahead for specific trains at lower prices. Surely, what is needed is pricing depending on demand according to time of day. This would be a more user friendly system).
The metro is surely a load of hype about nothing? What is needed is the electrification of the valleys along with new trains. Bus routes can be linked to train schedules to provide the links needed - preferably with through pricing. (They could be doing that now, but nothing has been done).
Sorry there's nothing unique about the Brynglas Tunnels - its just a mirror image of many other places in the UK - a symptom of failed Transport policies pursued for the last 60 years. The argument about alternatives because of traffic accidents is nonsense - the implication being you need a duplicate M4 the length of it in case accidents happen in Bridgend or Swansea....we hear the same bleating about the A55 in North Wales.
Congestion is an inevitable consequence of mass road use which the only solution to is fewer vehicles. No one has ever built there way out of road congestion.
Since the 1960s, it has been absolutely wonderful to have our motorways and other major expressways built. I can remember, as a kid, going through the old walled town of Conway, jammed with traffic and hence fumes. How much better, both for locals and those making longer distance journeys, to be able to travel at relatively high speeds on safer divided highways. Many towns and villages no longer have the noise, pollution and danger posed by through traffic. Would you honestly have preferred not to have seen the M4 built around Newport back in the mid 60s and all the traffic crawling through the middle on the A48?
Yes, the M4 tunnel congestion is a special case. This section of motorway is especially overloaded because it carries not only traffic between south Wales and southern England, but, also that to/from the Midlands as well as some local stuff making short hops. The Government made a big mistake in widening it from 2 lanes to three and installing all the electronic management equipment. They should have seen the way things were going back in the 1980s and started work on a new southern route instead. (The Conservatives had this all planned out in the early 1990s but Labours Rhodri Morgan came to power and cancelled it saying it was not needed)!
Now the Welsh Government are making another major mistake in permitting the building of a Park & Ride plus Business Park coming off the north side of M4 J33 (Cardiff West). This is a major strategic regional interchange that links the A4232 expressway an hence the western half of Cardiff, the Bay, Penarth & the whole of the Vale of Glam. - including Cardiff Airport - with the M4. Another entry/exit on an interchange that is not already fit for purpose is absolutely bonkers. They want Cardiff Airport to prosper. This is not the way to do it when journeys by road will face extra delays because of problems getting onto the M4.
In the early 1960's there were 3 million road vehicles in the UK now theirs 30 million plus which have saturated the road systems ability to cope. Can you name a country in the world that has built more road space that has solved the fundamental Achilles heel of mass car ownership? New roads just encourage more driving and the problem rears its head elsewhere worse than before.
We have to seriously consider limiting road use for the greater good of the economy/environment/ etc
I'd like to think that rather than imposing limits on road use, Gareth Marston meant to say 'encouraging modal shift' or 'providing alternative journey options' both of which I wholeheartedly support.Limiting freedom of movement is good for the economy?
Yes, the M4 tunnel congestion is a special case. This section of motorway is especially overloaded because it carries not only traffic between south Wales and southern England, but, also that to/from the Midlands as well as some local stuff making short hops.
)Limiting freedom of movement is good for the economy?
Because London has a lot of journey options so the congestion charge encouraged modal shift.Interestingly no one suggests the congestion charge in London has held back its economy.
I'd like to think that rather than imposing limits on road use, Gareth Marston meant to say 'encouraging modal shift' or 'providing alternative journey options' both of which I wholeheartedly support.
I will conceed that when a mishap ocours in one of the Brynglas tunnels it seems to take longer to reopen the road than in other places. I thus think that there may be a case for making the surrounding road network better able to cope with diverted traffic off the M4 (Prof. Cole's Blue route perhaps?), but actually re-routing the M4 is overkill and, importantly:Accidents are frequent and when the motorway is blocked completely, Newport & environs become completely grid locked.
Mass road transit is unsustainable
Isn't that what phase 2 of the metro (phase 1 being a couple of bus stations I think) was supposed to be when first annouced? Valleys electrification plus new bus services; although of course it has now been clouded by the 'should we go for trams, EMUs or bi-modes' argument.The metro is surely a load of hype about nothing? What is needed is the electrification of the valleys along with new trains. Bus routes can be linked to train schedules to provide the links needed
So; implement the metro to provide the journey options and introduce congestion charging on the M4 to encourage modal shift. And, in an effort to bring us back on-topic, also provide journey options for traffic sources that feed into the M4, eg. faster trains from Carmarthen to Cardiff with much improved buses, on a more-direct route, onto Aberystwyth. Then later, much later, when you've paid for the metro and Carmarthen-Cardiff expresses, extend the latter to Aberystwyth over a brand new railway.Because London has a lot of journey options so the congestion charge encouraged modal shift.
None of this has anything to do with the Aberystwyth Carmarthen line!
Hasn't there been a warning previously about taking this off-topic and into a non-railway area?
However much we don't like it the so called M4 Relief Road is the crux of the matter for transport in Wales - it will hog the budget for over a decade crowding out anything else. Aber to Carm wil be a pipe dream if the M4 road goes ahead.
BTW I think the South Wales Metro and Improvements on the current franchise should be the top priority's for Wales Transport.
If we look to the numbers who would benefit transportation-wise between the reopening of the Carmarthen to Aberystwyth railway line and the M4 Relief Road, which of these two schemes would carry more people?