Your first thoughts are correct. Platform 3 will be used solely for the Cross-City services, where they will start and terminate. The facing crossover is just to the north of the station to allow departing trains from P3 to cross onto the Up Main. Platform 2 will be the preserve of non-stopping and Hereford services.Another question (unfortunately) - I appreciate that P3 will be where the electric trains from Birmingham terminate, but will it also be the platform from which the electric trains to Birmingham start (i.e. P3 for both getting off and getting on) ? I've not had a chance to look closely at where the cross-over from P3 back to the Birmingham-bound/up-Lickey is actually located at Bromsgrove, so has it been decided whether it will be P2 (for the Herefords to Birmingham) and P3 (for the electrics to Birmingham) or P2 for both ? As a user, it would be very useful and helpful to know when rushing across the car park.....
I noticed last weekend whilst travelling through the station that there was a service due to terminate using platform 3. I have done a quick bit of looking and noticed that the following services operate on a Saturday only:
1114 BMV-BHM (arr. 1138)
1619 BHM-BMV (arr. 1640)
Are these new services? Is their purpose mainly for some form of testing, given that they are non-stop (no University call) and ECS runs provide the stock for these lone services?
BHM - Birmingham New Street; BMV - Bromsgrove
On my latest journey this week though the station, it was a rare occasion where I manged to obtain a seat, affording me views outside of the train! Travelling towards Birmingham I was looking at the new signalling that had been put in place on the other track; once past Bromsgrove I noticed two new signals that I've never seen anywhere before. These simply displayed an arrow on them - at first I thought this was a new type of repeater for the junction signal on the approach to the station, but then I saw the same for a standard signal near Blackwell. Can anyone enlighten me as to the purpose of these extra signals (I have provided a diagram illustrating what I saw)?
The answer to your question can be found in the Western Region Sectional Appendix - pages 359-60 should cover everything you need.Hi, posted this and was directed to this thread:
Does anybody have a 'track plan' of the formation at the south end of the new station? What arrangements are there for banking freight trains up the incline? I understand that platforms 2 and 3 will be electrified and 1 and 4 will be for through traffic, if so what will be the speed restriction over the north end turnouts? Is the track quadrupled to Stoke Works junction?
Thank you for any comments.
The answer to your question can be found in the Western Region Sectional Appendix - pages 359-60 should cover everything you need.
And it's worth mentioning that the NR Route boundary between LNW and Western Routes has shifted southwards 26 miles from Blackwell Summit to MP 78.40, 2 miles north of Ashchurch station.
The Cotswold line and Worcester loop with their manual boxes remain under Western control (for now).
Actually south of Bromsgrove it hasn't changed much. The former down goods line now starts a bit further south and has become a passenger line redesignated as the down Bromsgrove Loop, and the Up Goods Loop has been realigned round the new station and has been similarly redesignated the Up Bromsgrove Loop, with crossovers both ways immediately south of the station.Hi, posted this and was directed to this thread:
Does anybody have a 'track plan' of the formation at the south end of the new station? What arrangements are there for banking freight trains up the incline? I understand that platforms 2 and 3 will be electrified and 1 and 4 will be for through traffic, if so what will be the speed restriction over the north end turnouts? Is the track quadrupled to Stoke Works junction?
Thank you for any comments.
This very informative thread answered most of my questions. However it is not clear what the track plan is south of Bromsgrove station to Stoke Works junction. Had a look on Google Earth but shows this to be a mixture of double- triple and quadruple lines! I feel sure somebody on here in the know can give a sketch of the final track plan south.
The last time I visited Bromsgrove station - 21C had Beyer-garratt 69999 inside and 58100 did most of the banking. So please forgive me for being out of the loop!!
Mike.
And that slight oddity means that the new Worcestershire Parkway station will now be built straddling two different Routes, Western (high level) and LNW (low level), while any trains using the Norton Jn-Abbotswood Jn chord now pass out of Western into LNW and then back into Western again. Who comes up with these ideas!
And it's worth mentioning that the NR Route boundary between LNW and Western Routes has shifted southwards 26 miles from Blackwell Summit to MP 78.40, 2 miles north of Ashchurch station.
The Cotswold line and Worcester loop with their manual boxes remain under Western control (for now).
What will take over Gloucester Box eventually as Cardiff has taken over most of Gloucester-Severn Tunnel Junction and now West Midlands has taken over a chunk of Gloucester-Birmingham?
Bristol will take over the remainder of the Gloucester control area I believe.
On the other hand it might be Didcot or Cardiff ROC.
It probably depends on wider electrification plans, currently in limbo.
Anyway it will eventually disappear as a signalling centre.
Gloucester (or what's left of it) will end up in TVSC at Didcot.
That sounds like another Preston where a few miles of the remote Calder Valley route was controlled from a signal box on another major corridor.
Is bromsgrove still getting electric services at the end of the year or has this been pushed back?
What about walsall to rugeley line, is that still get electrified by end of the year or again being pushed back?
Is bromsgrove still getting electric services at the end of the year or has this been pushed back?
What about walsall to rugeley line, is that still get electrified by end of the year or again being pushed back?
Never mind the issue of where the extra 323s will live, lots of out stabling I suspect which the track maintainer will love....