New Metrolink routes after second city crossing.

Status
Not open for further replies.

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,776
Location
Nottingham
Some US systems have distinct 'streetcar' and 'LRV' lines; the former running slower services with shorter vehicles with a higher proportion of the route in mixed traffic.

Cologne also has low and high floor routes, running the "prototypes" for the Croydon and the Manchester trams respectively.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Chester1

Established Member
Joined
25 Aug 2014
Messages
4,446
They will still be terminating the airport route at Deansgate-Castlefield, which suggests to me that they don't want to feed any more into the centre.

It will be extended to Victoria, probably by the end of the year. The Trafford Park line will run through the 2CC and terminate at Crumpsall (to avoid needing more trams that can use the old and new signall systems). That means 4 from St Peters square to Piccadilly Gardens, 4 from St Peters Square to Victoria and Victoria to Piccadilly service. Deansgate to St Peters Square will be at absoute maximium capacity and the rest of the city centre wont be far off it. A low level tram segregated from the main network and passing underneath the metrolink near Deansgate through a road archway would be possible but would limit were it could run to.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,406
Which might be what what is being proposed along Oxford Road; but frankly, I cannot see what such a system might offer that could not be done cheaper and with less disruption by high-capacity articulated battery buses.

Short of annihilating half of the Curry Mile to make the road through it wider - you will never get articulated buses through there in a million years.
There are just too many obstacles and it is too congested.

There is just not enough manouevring room.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,406
All the more reason to have articulated buses in my opinion...

As someone who lives half the year a hundred metres from it... where would I get my cheap pizza :cry:
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
It will be extended to Victoria, probably by the end of the year. The Trafford Park line will run through the 2CC and terminate at Crumpsall (to avoid needing more trams that can use the old and new signall systems). That means 4 from St Peters square to Piccadilly Gardens, 4 from St Peters Square to Victoria and Victoria to Piccadilly service. Deansgate to St Peters Square will be at absoute maximium capacity and the rest of the city centre wont be far off it. A low level tram segregated from the main network and passing underneath the metrolink near Deansgate through a road archway would be possible but would limit were it could run to.

Does anyone know the reason why Airport trams won't be extended to Victoria via 2CC straightaway?

The only other service the south-west leg of Metrolink may have to accommodate in future would be an extra 5 trams per hour via the Airport Western loop (giving 5 trams each way round). This really would be pushing the capacity of the traffic lights at St Peters Square where the line crosses the very top of Oxford St (whatever it's called at that point)
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,807
Location
Somewhere, not in London
As someone who lives half the year a hundred metres from it... where would I get my cheap pizza :cry:

Any of the other 'fantatic' take aways, just not the ones on the North end of Wilmslow Road...

Alternatively, Morrisons on Hathersage Road and cook it yourself.
 

Chester1

Established Member
Joined
25 Aug 2014
Messages
4,446
Does anyone know the reason why Airport trams won't be extended to Victoria via 2CC straightaway?

The only other service the south-west leg of Metrolink may have to accommodate in future would be an extra 5 trams per hour via the Airport Western loop (giving 5 trams each way round). This really would be pushing the capacity of the traffic lights at St Peters Square where the line crosses the very top of Oxford St (whatever it's called at that point)

I can't remember the reason, I think its something about new signalling. Airport loop service will be a necessity by 2033 to make sure terminal 3 and HS2 station are connected to Metrolink. The road traffic would have to be rerouted and some more work done to improve tram capacity, perhaps 4 tracking the on street section from GMEX to St Peters Square. Its fair to say that aside from the airport loop and trafford park that side of Metrolink can't be expanded further. The only room for future growth without a new city centre line would be extending services that terminate at Victoria/Piccadilly/Etihad onto new lines.
 

Altfish

Member
Joined
16 Oct 2014
Messages
1,065
Location
Altrincham
Does anyone know the reason why Airport trams won't be extended to Victoria via 2CC straightaway?
IIRC, it is something to do with the signalling on the centre line at Victoria.

The only other service the south-west leg of Metrolink may have to accommodate in future would be an extra 5 trams per hour via the Airport Western loop (giving 5 trams each way round). This really would be pushing the capacity of the traffic lights at St Peters Square where the line crosses the very top of Oxford St (whatever it's called at that point)
Airport Western loop is likely to happen to coincide with HS2 when (if?) that gets to Manchester.
I think by then the car will have been further banned from the city centre and the traffic lights will be less of an issue.
 

nerd

Member
Joined
4 May 2011
Messages
524
IIRC, it is something to do with the signalling on the centre line at Victoria.


Airport Western loop is likely to happen to coincide with HS2 when (if?) that gets to Manchester.
I think by then the car will have been further banned from the city centre and the traffic lights will be less of an issue.

Indeed; though increasing the frequency of the Airport line from 5 tph to 10 tph is likely to happen in the next year or so; and certainly well before any construction of the Western Loop.

there are currently 25 trams per hour through the Peter Street traffic lights.

- that will increase to 30, with the connection of East Didsbury to Rochdale.
- increase to 35 when the Airport services run through to Victoria
- increase to 40 when the Airport line frequency goes to 10 per hour
- increase to 45 when the Trafford Park line opens.
 

PermitToTravel

Established Member
Joined
21 Dec 2011
Messages
3,042
Location
Groningen
You could get an articulated bus down the curry mile without much trouble (though I still favour any proposals including its demolition)
 

TC60054

Member
Joined
3 Mar 2016
Messages
595
Location
Doncaster
I can't see how passing platforms at 10mph would help much over just calling there. Unless an avoiding line is to be built for non-stopping trams of course.

You'd be surprised how much time can be saved by non-stopping tram stops, even with a low speed through the stop itself - see Supertram.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,499
Location
A typical commuter-belt part of north-west England
You'd be surprised how much time can be saved by non-stopping tram stops, even with a low speed through the stop itself - see Supertram.

There are times when I wonder if operational niceties are seen as far more important in the eyes of certain people then the reason why a modern British tram service was originally envisaged, viz. the provision of a mode of transport to paying customers.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,807
Location
Somewhere, not in London
There are times when I wonder if operational niceties are seen as far more important in the eyes of certain people then the reason why a modern British tram service was originally envisaged, viz. the provision of a mode of transport to paying customers.

Don't be silly, the railways have never been intended to carry passengers...
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,499
Location
A typical commuter-belt part of north-west England
Don't be silly, the railways have never been intended to carry passengers...

My posting, written as carefully as my current medical setback would allow, only made reference to a modern British tram service.

It was you made the railways as a comparative answer to my posting and in terms of the raison d'etre of the reasons why some of the very earliest railway systems such as the Stockton and Darlington Railway and the Liverpool and Manchester Railway indeed were established as a means of a faster transportation of goods traffic than the modes previously available, you are indeed most correct.
 

nerd

Member
Joined
4 May 2011
Messages
524
http://www.tfgm.com/2040/Pages/strategy/assets/2017/2-17-0078-GM-2040-Full-Strategy-Document.pdf

We have identified a phased approach to enhancing our Regional Centre rapid transit networks to meet the long-term needs of our rapidly growing economy as follows:

• Short-term (to early 2020s): Completion of Metrolink Second City Centre Crossing; completion of Northern Hub works and introduction of enhanced, higher-capacity heavy rail services; delivery of Trafford Park Line; and increased capacity on the busiest Metrolink lines by running more double-unit vehicles;

• Medium-term (to 2030): Develop and deliver tram-train to improve rapid transit connectivity into and across the Regional Centre and develop potential cross-city metro proposals; develop proposals for our suburban rail network to complement the Northern Powerhouse Rail network; and

• Long-term (from mid-2030s): Implement cross-city rapid transit capacity enhancements, potentially through tunnelled metro services, and deliver suburban rail enhancements to complement Northern Powerhouse Rail.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,365
Location
Bolton
In Sheffield the tram will only pass the stop if there's nobody getting off and nobody waiting. That's very rare for Metrolink but semi-regular on Supertram.
 

Altfish

Member
Joined
16 Oct 2014
Messages
1,065
Location
Altrincham
In Sheffield the tram will only pass the stop if there's nobody getting off and nobody waiting. That's very rare for Metrolink but semi-regular on Supertram.

Yes, but the Supertram has a 'stop request' button that the passenger activates if they want to alight, like on a bus.
Metrolink has no such system.
 

CC 72100

Established Member
Joined
23 Jan 2012
Messages
3,852
In Sheffield the tram will only pass the stop if there's nobody getting off and nobody waiting. That's very rare for Metrolink but semi-regular on Supertram.

Unless the stop we're talking about is Pomona of course :lol:
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,365
Location
Bolton
Yes, but the Supertram has a 'stop request' button that the passenger activates if they want to alight, like on a bus.
Metrolink has no such system.

What would the benefit be? Apart from at Pomona. And even there it would be tiny because there's such a sharp curve.
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,887
Location
West of Andover
In Sheffield the tram will only pass the stop if there's nobody getting off and nobody waiting. That's very rare for Metrolink but semi-regular on Supertram.

Similar to Nottingham & Blackpool, they only stop if requested on board or the driver sees someone waiting on the platform.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,499
Location
A typical commuter-belt part of north-west England
Well, a family friend and I decided to try out the new 2CC that came into operation yesterday. We drove to the East Didsbury Metrolink car park and took the East Didsbury to Rochdale service (via Exchange Square).

All was well but at Deansgate-Castlefield, about 1300 hours, the Piccadilly tram in front of us at the platform and our tram were held up for just over 10 minutes. The driver twice made announcements to say that he did not know the reason for the delay.

Anyone here on the thread know what occurred?
 

Altfish

Member
Joined
16 Oct 2014
Messages
1,065
Location
Altrincham
Well, a family friend and I decided to try out the new 2CC that came into operation yesterday. We drove to the East Didsbury Metrolink car park and took the East Didsbury to Rochdale service (via Exchange Square).

All was well but at Deansgate-Castlefield, about 1300 hours, the Piccadilly tram in front of us at the platform and our tram were held up for just over 10 minutes. The driver twice made announcements to say that he did not know the reason for the delay.

Anyone here on the thread know what occurred?
I've not heard anything. Paul.
They were ok a couple of hours earlier. It is usually a point failure:(
 

ValleyLines142

Established Member
Joined
25 Jul 2011
Messages
7,040
Location
Gloucester
Well, a family friend and I decided to try out the new 2CC that came into operation yesterday. We drove to the East Didsbury Metrolink car park and took the East Didsbury to Rochdale service (via Exchange Square).

All was well but at Deansgate-Castlefield, about 1300 hours, the Piccadilly tram in front of us at the platform and our tram were held up for just over 10 minutes. The driver twice made announcements to say that he did not know the reason for the delay.

Anyone here on the thread know what occurred?

3109 on a Shaw service had the hazards on outside Manchester Central, so this must have been the offending unit. 3074 was before on an Ashton service and there were no problems there. As a result, on the raised section up to Deansgate, 3044 on an Etihad service, 3114 on a Rochdale service, 3012+3010 on a Bury service and 3105 on an Ashton service were all stacked up behind. 3076+3077 on a Shaw service were also behind by Cornbrook.

3109 was fine later in the day though.

I went past in the opposite direction on 3064!
 

deltic

Established Member
Joined
8 Feb 2010
Messages
3,723
How long would it now take to cover the whole Metrolink network at a reasonable pace - ie stop every now again for a bite to eat and a comfort break or two!
 