Many thanks for all of this information. Indeed its this kind of information which makes this forum so compelling. I've often thought that walking across Ribblehead viaduct must have been almost impossible on a stormy night unless you were prepared to crawl!
I've got a book on Settle and Carlisle structures which I'm pretty certain contains the mileage figures for Mallerstang but unfortunately I'm away from home tonight.
I'm pretty certain (without checking) that Dent Head signal box had closed by 1966 as that would have been another signal box involving a bit of a walk from the road and an isolated one at that.
Dent signal box is another one that fascinates me, mainly because of the characters that worked there. By all accounts a long standing signal man there cut hair and repaired radio's in his spare time, not to mention catching fish as he walked up beside the beck on his way to work.
Thanks for the comments Richmondcommu. I have now found my Mallerstang box mileage, 263m 21ch, 1 mile 2 chains walk along the cess from Birkett tunnel. I never knew Dent Head to be open, closure shown as 1966.
I understood that if it had to be opened, then the S & T would require to be in attendance. I cannot recall their location, but it could have been Hellifield, - covering up to Ais Gill? Some forum member may know their location and area. As time passed, any opening became less likely, although in theory it could have reduced delays when I was Pilotman working SLW from Dent to Blea Moor. I must agree that it was a very poor location for access
Dent, like many boxes had some characters, usually those with many years service. I can agree with you on the hair cutting, as for repairing radios, I'm not sure, -but catching fish? I can't say it didn't happen, but I don't recall anyone walking to work at Dent. Those familiar with the location will know that there are hardly any dwellings in walking distance and there is a very steep hill up from the valley. (Coal Road) I could only ever drive the A95 up the hill in second gear at best.
Weather on the S&C always had to be taken into account. One day at Dent a strong wind blew up and thick fog formed bringing visibility down to a few yards. Fog working was put into operation. Conventional wisdom has it that the wind will blow the fog away. But on this day, the wind swirled the fog around and did not clear. I was not able to drive away for about two hours.
I never walked over Ribblehead viaduct in windy weather. The station was a weather reporting point and gave weather reports hourly to an RAF station, can't recall which one, but they collated all reports for the area and passed them on to The Met Office. Reports were given under headings such as type of clouds, area of sky obscured, distance visible, cloud base, rain/snow in past hour, wind speed direction etc. All were given a number 0 to 9 for the report, which took less 30 seconds to give. Weather balloons had ceased to be used and the anemometer dial was in the Booking Offce recording up to 90 knots. The station phone was xdirectory and paid for by the Met Office. The SM was paid for giving every reading, hourly on weekdays and two hourly on Sundays. This put the SM in what was called at the time, "the super tax bracket." Perhaps somebody can say at what level that started in 1966?