For LM
319s to be kept purely for the Abbey Line
ATW, 2tph Crewe to Shrewsbury stopping at Nantwich + Whitchurch, 1tph stopping at the other stations on the route, including Sundays (where there's a 3 hour gap in the middle of the day for stopping trains)
That would be the ultimate microfleet.
Can't we fix whatever prevents 350s being used?
That would probably make more sense. That or operate it as a microfranchise going back to the tram idea, a bit like Stourbridge, though as you have the OHLE actual trams would probably make more sense.
Are further improvements likelt in the winning bid for the South West franchise or are a lot of the changes already happening or agreed to happen? They are already introducing new rolling stock, 707 and got the second hand 456s, not to mention refurbishing the 458s. Then there is the work at Waterloo station to bring in extra platforms.
For Southeastern:
1. Ldn Victoria - Orpington additionally calls at Clapham High Street
5. Consider introducing an hourly direct Kent to Gatwick service
6. Stone Crossing, Greenhithe and down to Sevenoaks in the travelcard zones
More trains for them to cancel during disruption.For LM
3-4 TPH Euston - Tring
Taking over MKC - Croydon from Southern
Gaining 360s ( from AGA and HEC ) as well as 350/4 from TPE
319s to be kept purely for the Abbey Line
A refurb of the 350/1 (most importantly) and then the 350/2 ( not as important)
Just a wishiist
More generally - where line capacity allows, move to pure clockface timetabling with an aim long-term for the entire network (with the exception of *really* rural lines like the Far North - but certainly anything justifying hourly or better, probably also anything justifying two-hourly) to be fully clockface within 10 years or so.
Just having to remember one or two numbers really does drive demand (getting a timetable out is a real barrier to use when the car keys are next to it in the drawer).
FWIW, Merseyrail has been using the concept well for over 30 years now. The Northern and Wirral lines are near perfect clockface - there are almost no trains that deviate (used to be none whatsoever, they've got a bit lazy under Abellio). And that makes things really, really easy for passengers, if operationally a little more challenging.
Even the Sunday service is the same as the weekday service just with half the trains lopped out.
With so many passenagers, how does one improve the dwell times? They can't run any more trains as they just isn't the space. The doors aren't exactly slower to open. At least not the 455s.There were heavy hints about replacing the 455s, as discussed many times, although it is not actually an explicit statement. The stated requirement is to improve (reduce) dwell times at Clapham Junction in the peaks.
But as I pointed out earlier, extensions to electrification and similar is not in the normal remit of franchise bids.
Lack of capacity between Wigston and Kettering mean it is more than likely that the 6th path will run to Corby, any Manchester service would probably start in Leicester, but a direct Leicester - Derby - Manchester service would be good.
Why? The Northern service by 2020 will be much faster, more sensible to extend the Sheffield semi-fast service to Leeds, a better policy would be providing faster services to Nottingham.
Outside of the things required by the DfT, an hourly BHM to Gloucester via Worcester would make sense. That might require the LO 172s if they're not accounted for already. I can't imagine anyone else wants them alone as a micro fleet other than Chiltern? You could also cover the Coventry to Leamington/Nuneaton shuttles, and enhance train lengths on the dark side with any that are left over.
But as I alluded to earlier, that destroys any Northbound connectivity from Northampton to anywhere that's not Birmingham. Take getting from here to Leicester. It's a very easy journey on the M1, but if I want to do it by rail, I have the choice of changing at Rugby to change a miles later at Nuneaton--one change being enough to turn a significant amount of people away, never mind two--or go all the way to Birmingham to then double back on myself to get to Leicester. This is true of pretty much any connection to the rest of the East Midlands and the North East.
Why? They're slower, older, much less reliable and have a worse passenger environment than either of the current two EMUs used in Birmingham... Given that there are 10 350/4 and 17 323s fairly freely available to the WM franchise, it's not like there aren't better options available! Won't the Cl.360s and Cl.333s be available soon too? The only place 319s should be going is to the scrap men.
Arguably this a failing of WCML service provision rather than an LM problem. Perhaps it would be better to extend an existing Northampton terminator to Leicester directly or via Coventry. I still believe there is demand for a second fast service from London via the Weedon to Trent Valley stations.
If we did a clockface timetabling then less trains would run in the peaks or useful station cslls that are only allowed to happen outside of the high peak, would be scraped.
Is there supposed to be four tracking proposed between Syston and Wigston via Leicester? Secondly surely the dualling of Kettering to Corby would release capacity between Kettering and Leicester by diverting trains?
But isn't LM the franchise supposed to provide short and middle distance services in the WCML? I'm certainly not expecting any Virgin trains to detour via Northampton...
And extending Northampton services to Leicester would require running them with DMUs, which makes it a non-starter.
Much of the freight between the Southern MML and the Coalville and Hinckley lines has no real choice other than to go via Market Harborough. Hence the dualling of Kettering to Corby might help divert some trains but it doesn't solve the key constraint to the timetable, which is the two track Kettering to Kilby Bridge (South of Wigston, Leicester) section. The Leicester Area remodelling primarily provides extra capacity between East and West rather than North and South, because you still have the bottleneck between Wigston and Kettering.
Virgin stopping at Rugby would definitely help with connections to the North West and Scotland. I don't think they'd like slowing their services down for it though, at least pre HS2. The problem is it wouldn't do anything for connections to the East Midlands and the North East.Perhaps Virgin stopping at Rugby would help?
Why would DMUs be needed? Bi-modes?
Virgin stopping at Rugby would definitely help with connections to the North West and Scotland. I don't think they'd like slowing their services down for it though, at least pre HS2. The problem is it wouldn't do anything for connections to the East Midlands and the North East.
I didn't consider bi-modes because I doubt LM will acquire any. Most of their DMU operations don't spend that much time under the wires IIRC. I might be wrong on this, please correct me if so, but I don't think it would be worth the extra cost of going with bi-modes compares with straight DMUs. Doing that service would also require a reversal at Nuneaton.
Indeed, however some lines could do with one just to start with - the likes of Lancaster-Barrow, Penzance-Plymouth and the North Wales Coast serve reasonable populations and have busy services, yet are an awkward mish-mash of stopping patterns (especially the latter) and service frequencies that don't particularly aid user-friendliness. Much better to have punters know that if they turn up every hour at xx45 they'll have a train all shacks to Preston, and if they turn up at xx22 they'll have a train all shacks to Barrow than a service that requires a blanket 'please consult the timetable, but be careful as trains x and y don't actually call there...'.
319s to be kept purely for the Abbey Line
That would be the ultimate microfleet.
Can't we fix whatever prevents 350s being used?
Adding a 5-car subfleet would be quite useful - it would allow lengths of 4, 5, 8, 9, 10 and 12-car to be formed, which would mean lengths could be tailored more to demand. There are quite a lot of LM services where 8 is insufficient, and 12 excessive, and similarly a lot of off-peak services where 4 isn't quite enough but 5 would be adequate.
ATW, 2tph Crewe to Shrewsbury stopping at Nantwich + Whitchurch, 1tph stopping at the other stations on the route, including Sundays (where there's a 3 hour gap in the middle of the day for stopping trains)
Class 319s are actually only around 5 years older than Class 323s. 1987 to 1992. Class 319s for London to Northampton slower services with Class 323s from Northern should be operating with their LM counterparts around Birmingham suburbs.
Plus I don't think trying to match supply to demand on the level of an additional carriage here and there really helps that much, as I don't think it's easy to asses demand that accurately.
For the Hampshire villages between Salisbury & Basingstoke to get an hourly service on Sundays (like the rest of the week and the Dorset villages). Also gives a clock face timetable for Andover departures
Will probably grow passenger numbers on Sundays
For the Hampshire villages between Salisbury & Basingstoke to get an hourly service on Sundays (like the rest of the week and the Dorset villages). Also gives a clock face timetable for Andover departures
Will probably grow passenger numbers on Sundays
What this line needs to really increase services is a half hourly service on a Sunday from 1000 -1900. Yes there are a couple of extras in the day but to really increase passenger numbers and create growth have like on Monday-Sat A Salisbury -Basingstoke stopping service calling at Grateley, Andover, Whitchurch and Overton.
No 2 priority - extra capacity for Trent Valley which could be achieved in a number of ways 1. Scrapping the existing LM fast service and replacing it 2 services which split off Birmingham services at Northampton or keep the existing direct Weedon service and supplement it by a 'splitter' off a Northampton service.
As long as it gives a good connection at Basingstoke onto a fast service towards Waterloo.
Far fetched I know but, extend the XC Manchester-Bournemouth services to Poole using 8 car 802s( or dual voltage 801s).Then take on some of the VTEC mark 4s and convert them to operate between Class 43s from GWR and VTEC and use these to run all services from Plymouth to the North. This should be able to release enough voyagers to alleviate capacity issues for other services and to run increased frequencies on other services e.g. 1tph SOU to NCL ☺
Personally, once you are into the realms of having spare 220's to run in pairs then I would start to consider creating 3 coach, standard class only units, for use as crowd busters through the core with all other units being a standard 5 coaches in length.
That would give you 19 x 3 coach units with circa 150 seats and 39 x 4 coach units with 250 seats.