This is a money's no object world, but you'd be surprised how many people would be put off by the tram but love the idea of a personal pod whisking them to the terminal.
Surely it's close enough for a zip line. Much more fun
This is a money's no object world, but you'd be surprised how many people would be put off by the tram but love the idea of a personal pod whisking them to the terminal.
Can't. The wire would be in the approach for runway 30.Surely it's close enough for a zip line. Much more fun

Can't. The wire would be in the approach for runway 30.![]()
Surely it's close enough for a zip line. Much more fun

Probably not as much fun on the return journey![]()
The return journey will be powered by a bungee chord stretched out by the outward trip. It really can't fail
Probably not as much fun on the return journey![]()
http://www.networkrailmediacentre.c...-gbp-49m-shotts-line-electrification-contractWork will also see new station footbridges at Addiewell and West Calder, platform extensions at three intermediate stations (Carfin, Shotts and West Calder) and the complete redevelopment of Livingston South station.
So it suggests they are at least wanting the option of the semi fasts to run as 2 x 3 car services with all stations able to take at least a 4 car service. However extending Shotts platforms from 148m suggests wanting to allow for some really quite long trains to call in future.
Perhaps a standard 8 x 23m train length should be what any newly extended platforms should be based on - probably 190m or so. Interesting to see what length they are going for at Shotts.
The Down platform at Shotts is being extended from the current 137 metres (top of ramp to top of ramp) to 147 metres. The Up Platform remains at 152 metres.
Interesting announcement from NR on platform extensions for the Shotts line:
http://www.networkrailmediacentre.c...-gbp-49m-shotts-line-electrification-contract
Given 23m long 385s are to operate the line we are looking at approximately the following lengths:
3 car 69m
4 car 92m
6 car 138m
7 car 161m
8 car 184m
Current Shotts Line platforms are:
Slateford Up 153m Down 183m
Kingsknowe Up 93m Down 94m
Wester Hailes 120m
Curriehill 121m
Kirknewton Up 99m Down 169m
Livingston South 120m
West Calder Up 129m Down 131m
Addiewell Up 151m Down 149m
Breich 128m
Fauldhouse Up 137m Down 128m
Shotts Up 152m Down 148m
Hartwood Up 128m Down 134m
Cleland 125m
Carfin Up 92m Down 97m
Bellshill Up 134m Down 138m
Uddingston Up 134m Down 133m
Cambuslang 138m
So it suggests they are at least wanting the option of the semi fasts to run as 2 x 3 car services with all stations able to take at least a 4 car service. However extending Shotts platforms from 148m suggests wanting to allow for some really quite long trains to call in future.
Perhaps a standard 8 x 23m train length should be what any newly extended platforms should be based on - probably 190m or so. Interesting to see what length they are going for at Shotts.
I've never understood how Slateford has survived as an Edinburgh station. Moving it along to Shandon/Gorgie would seem more sensible.
Population served at Shandon/Gorgie doesn't seem much different in size, and you are competing with a significantly quicker bus service and an easy 15 minute walk to Haymarket.
It's been mentioned in the HML improvement studies but IIRC that has been pushed back to CP8/CP9.* any redoubling plans for Culloden to Moy.
Does anyone have any information on the following?
* redoubling of the line from Milngavie to Hillfoot and then Bearsden to Westerton.
* any redoubling plans for Culloden to Moy.
Thanks.
Milngavie branch redoubling isn't planned because the bottleneck is down at Partick. The current infrastructure handles the 4tph service well enough that the money spent on redoubling would be far better spent on some other thing, such as electrifying the Maryhill line.
It could be down to the cost of junction renewals.BR must have been really starved of funds to remove such short sections.
This intervention proposes construction of a new section of railway, running close to the M90 for approximately five miles. New junctions will be required, one between Inverkeithing and Dalgety Bay, and another in the vicinity of Halbeath.
Related works are likely to be required in the Cowdenbeath area for higher linespeeds and an upgrade of Thornton North Junction to accommodate the revised routing of the interurban traffic.
I think the old alignment was abandoned due to mining subsidence so would require extensive remidial works before it could support a high speed alignment.
From the sectional appendix it looks like that curve imposes a 35mph speed restriction and you're past Lochgelly before the line speed gets back up to 60mph so it would probably save a few minutes.How much time could actually be saved?
You can see the old line going straight through Cowdenbeath on this map, and compare it to what's currently there: http://maps.nls.uk/geo/explore/#zoom=15&lat=56.1132&lon=-3.3415&layers=168&b=1
How much time could actually be saved? It would be a lot of work, given the proximity of housing, old mining sites, reinstating the tunnel at Lumphinnans - and the golfers wouldn't be happy!
Regarding the bypass, I'm assuming it will shadow the M90 to Halbeath? How do they plan on crossing the M90 link and A92 - tunnelling under them to emerge beside the park & ride?
From the sectional appendix it looks like that curve imposes a 35mph speed restriction and you're past Lochgelly before the line speed gets back up to 60mph so it would probably save a few minutes.
Agree with Carntyne. I remember when it was double all the way to Milngavie and the operational flexibility was good.
BR must have been really starved of funds to remove such short sections.
Looking at the Route Study again, when discussing the Fife Bypass Line (which appears to be extremely likely to be built), it mentions the need for related works around Cowdenbeath: