Bertie the bus
Established Member
- Joined
- 15 Aug 2014
- Messages
- 3,216
Wanting increased capacity isn't the same thing as wanting a withdrawn tube train just as wanting more family time isn't the same thing as wanting redundancy.
That's possibly the worst analogy I've seen posted in any thread.Wanting increased capacity isn't the same thing as wanting a withdrawn tube train just as wanting more family time isn't the same thing as wanting redundancy.
That's possibly the worst analogy I've seen posted in any thread.
While 230s aren't brand spanking new, 99.9% of the travelling public would take and be grateful for a seat on one over standing on (or not being able to get on) their TOC's existing fleet of DMUs.
Nicely made up statistic there, just like your constant made up comments about VWC peak services being 'rammed'.
How many Coventry - Nuneaton services, excluding when there are events on at the arena, leave people behind? I've been on that line quite a bit and the daytime services especially are very quiet.
I wasn't aware that the 230 design limited its use to the Coventry - Nuneaton line.How many Coventry - Nuneaton services, excluding when there are events on at the arena, leave people behind? I've been on that line quite a bit and the daytime services especially are very quiet.
I imagine so
D319s, anybody?
Sent from my iPad using Tapatalk
Well I think thats a risk that needs to be ironed out before any 319s are modified as so.
Re: http://www.railforums.co.uk/showthread.php?p=2826554#post2826554
I don't think it kills Class 230 any more than an early fatal fire on the launch pad killed the Apollo Moon Landings.
Clearly there will be teething problems for a project of this type and they can be rectified. Any safety concerns will have to be laid to rest.
According to Rail issue 817 that has just landed on my doorstep Adrian Shooter says on page 35 that Vivarail have confirmed orders for the 230's although confidentiality clauses forbid him for disclosing who from. Sorry I can't link to the page as its a hard copy magazine.
Vivarail said:To reassure that there was no fire in the train, it occurred in one of the exterior, detachable engine modules. I will keep you updated.
I was shocked to see the Coventry Telegraph article.
Such a blow for Vivarail, but the staff need commending for dealing with it so well. Hopefully they'll rebuild from the ashes and turn the class 230 into a success story.
What would be the ordinary timescale for returning a fire damaged unit to service?
How I wonder if the same reaction was had when the two Class 139 units were introduced on the Stourbridge Town line.
Adverse comment has been made on the top speed of 60mph. The trains could be of value however on rural routes where the ruling limit is only 60mph That would include, for example, the Cumbrian coast. Moreover if they have enough installed power they could improve journey times with greater acceleration.
According to Rail issue 817 that has just landed on my doorstep Adrian Shooter says on page 35 that Vivarail have confirmed orders for the 230's although confidentiality clauses forbid him for disclosing who from.
At least there were two of them, which is not the case with the solitary Class 230 unit.
What, you're saying that they would rather keep the inadequate Class 153?
Nicely made up statistic there, just like your constant made up comments about VWC peak services being 'rammed'.
How many Coventry - Nuneaton services, excluding when there are events on at the arena, leave people behind? I've been on that line quite a bit and the daytime services especially are very quiet.
According to Rail issue 817 that has just landed on my doorstep Adrian Shooter says on page 35 that Vivarail have confirmed orders for the 230's although confidentiality clauses forbid him for disclosing who from. Sorry I can't link to the page as its a hard copy magazine.
So, a fire in one of the detachable engine rafts... Also suggestions that the trial unit has already previously experienced engine problems of some kind... And now the suggestion that 'confirmed orders' are in place...
It must be hoped by all concerned, that whatever is causing whichever component(s) it is that is causing the problems, can be isolated and determined quickly, and that there is sufficient scope for a re-engineered/modified solution at this stage of the project..
No suggestion at all!
Exact wording from RAIL magazine as a interview with A Shooter
He adds We do have firm orders but they are subject to confidentiality clauses. But I can say that we will start manufacturing in January I would hope that initially we can tun out a two or three car unit each month but production can be shortened if we get large orders that allow us to achieve efficiencies and economies of scale we have the four track former MoD shed at Long Marston and we are acquiring another shed in which we can fit another four or five cars. This is where they will be stripped out and cleaned up, and structural work done
Those are production units, during the trial period over the mid-2000s there was only the one "PPM50" unit.
Ultimately this is a disappointment for the programme, but certainly won't stop it. There's always some sort of setback in programmes and engine fires can happen. The two LM 172s caught fire underneath, and that was in service. Forgotten now what the reasons were those fires?
Orders in the pipeline sounds interesting if true - First Great Western perhaps? I hope the project succeeds, as it is innovative, and certainly on routes such as COV - NUN, could be very useful!
Various Fire & Rescue services for use in training exercises...It also states that production is going to start in January.
Big Question is who has ordered them and how many have they ordered?