There are many sensible and logical extensions to the railway network proposed on these boards and bu other organisations. Lumping them all together as 'hare brained' schemes dreamt up by 'crayonistas' does your argument no favours.
There are many extensions to the railway network proposed on these boards, I agree.
Some of them are sensible and/or logical, but a lot of them seem to be driven by how can we bring back some rural route closed fifty years ago, rather than how can we provide capacity to meet 21st century demand.
Hence the obsession with routes like Colne Skipton, rather than various New Towns/ out of town destinations etc.
HS2 would link lots of big cities together, but people on here arent interested in that because its a brand new railway they are much more concerned with trying to link villages in Devon/ Galloway/ Cumbria/ North Yorkshire because that was a route that some Victorians once built. Its more about a Historical Re-enactment Society for some people.
Instead of starting with a blank sheet of paper, people start with a 1960s Rail Atlas and try to justify re-opening routes through relatively empty bits of the country.
I dont mind the proper Blue Sky Thinking Crayonista stuff, since its at least original.
So what is your answer? Force people to give up their cars and join some utopia of public transport provision? You are living in cloud cuckoo land if you think that :roll:
We need infrastructure investment in this country including in the road network.
Smarter traffic management, including better real time travel information, managed freight queues at peak times, and measures as simple as enforcing speed limits could all make a real difference instead of blithely expanding road capacity
Smarter traffic management sounds a bit like the smart timetables solution to the WCML, whereby well apparently magic up lots of new capacity (and therefore not need HS2).
Im similarly unconvinced.
People are suggesting fanciful ideas to reopen new railways and yet as a nation we are struggling to fund the electrification of major Intercity routes.
This needs repeating.
If we dont have the resources to electrify the lines to cities like Bristol, Oxford, Swansea or Sheffield any time soon then I think we should stop the suggestions of rebuilding the quaint little branchline from Dibley to Ambridge.
If we cant even find the resources to wire the MML before the end of the decade (when, AIUI, itd be cheaper to electrify it than not to, given the great business case), theres no point worrying about little branches that will take a long time to recover costs.
Focus resources on where they are best needed.
That probably wouldn't suit pax going to/from Durham - Belmont is really too far out for the city. However, in 2000, there was a plan to reopen the Leamside for these Middlesbrough-Newcastle services, with a station at Belmont
I could see a station at Belmont working, as a kind of County Durham Park And Ride convenient for the A1 and A690 (spread across places like Peterlee, Sedgefield, Spennymoor, possibly parts of suburban Sunderland).
Youve got the car park there already, the regular P&R buses into central Durham but car parking at Durham station isnt great (nor is driving into Durham generally, or walking up the hill from the Bus Station to the Train Station) so
there may be a market there for people in the wider County Durham area to use Belmont as a P&R.
Whether thats a Metro service into Newcastle or a heavy rail one, I have no opinion about. I just think that theres a market for something that would take motorists off the A1. Plus you get to serve Washington, which is a large place not to have any heavy rail/ light rail. Compare the obsession with places like Okehampton on here to decent sized places like Washington...
Presumably the "Woodhead" route between Sheffield and Manchester has dropped off the radar, despite having the expensive work already in being, ie the modern Woodhead tunnel, apparently only requires National Grid to move their cables into the old tunnel, and a route that would provide welcome additional capacity trans-Pennine, given that the Hope Valley route is near to capacity
There are easier ways to get more capacity from the two/ three/ four coach DMUs on the Hope Valley, without needing a whole new line.
The Hope Valley line just needs the passing loop it was promised in the Manchester Hub (somewhere between Grindleford and Bamford IIRC). Allowing freight to be overtaken would make a big difference (given the speed that the cement wagons trundle along at).
Woodhead services would be tediously slow west of Hadfield (it takes 323s over half an hour to do under fifteen miles to Piccadilly), and would require a whole new station at the Sheffield end (Victoria being unconnected to any other services).
Even if you could re-open the tunnel(s) for peanuts, Im not convinced.
I guess Matlock-Bakewell and onward towards Manchester is not up for consideration
What would it solve though?
Itd be a slow alignment for any long distance journeys (given the shape of the hills).
Well have HS2 and the WCML for the London to Manchester market (which will be built before a Bakewell route gets beyond feasibility studies, if anyone has ideas about an alternative route through Matlock).
We could find some spare 158s to increase Nottingham Sheffield Manchester Liverpool to six coach operation.
Or electrify Derby to Stoke, to permit EMUs to get from the East Midlands to the North West that way. Certainly a lot of ways to improve capacity without needing a whole new line through the Peak District.