Hope this is the right section as it's sort of infrastructure - but it's also timetabling I suppose?
A relative may be travelling from Leeds to Swansea just before Christmas (22nd/23rd Dec), and back shortly after - maybe the 27th Dec, and is hoping to go via train.
They have been told there may be some disruption between Cardiff and Swansea around Christmas - as I understand it, the implication was that he may not actually be able to do it via train on the way back.
I know that engineering work will be taking place over the Christmas period (no problem with this); can anyone explain to me how someone travelling Leeds - Swansea via Manchester and Cardiff, and back again on the dates mentioned may be affected by these and what options there are?
Many thanks
A relative may be travelling from Leeds to Swansea just before Christmas (22nd/23rd Dec), and back shortly after - maybe the 27th Dec, and is hoping to go via train.
They have been told there may be some disruption between Cardiff and Swansea around Christmas - as I understand it, the implication was that he may not actually be able to do it via train on the way back.
I know that engineering work will be taking place over the Christmas period (no problem with this); can anyone explain to me how someone travelling Leeds - Swansea via Manchester and Cardiff, and back again on the dates mentioned may be affected by these and what options there are?
Many thanks