LIVERPOOL HAS UNDERGROUND EXTENSIONS WAITING TO BE USED
Liverpool has nearly 4 miles of disused rail tunnel under its
centers and inner city. So, why is this half-baked tram idea being
pursued?
Wapping Tunnel: 1.26 miles: 2.03 km
Waterloo Tunnel: 2.07miles: 3.34 km
Dingle Tunnel: 0.5 miles: 0.8 km
Also, the disused Haymarket Tunnel running under the centre of
Birkenhead is 0.75 miles long.
Liverpool has two underground stations waiting to be re-commissioned,
Dingle and St James' at Parliament Street, and provision for another two in
underground tunnel cuttings, Byrom Street and the Cavendish Cutting.
Merseyrail has the potential to be the most comprehensive "metro"
system, underground/overground, in the UK. If all the disused lines,
trackbed, stations and tunnels are brought back into use and seamlessly
merged in. Merseyrail will cover more than London's Underground in
percentage terms of its served population.
Top class cities have underground systems. Second tier cities have
trams. Manchester wanted an underground train system, but could not afford
it, so went for makeshift 2nd rate trams. So Liverpool with a plethora of
disused underground infrastructure under its city goes for ....trams. Yes,
trams. Well Manchester has them don't they. They have no idea.
Merseyrail has in underground rail:
So, that is 11 underground stations, which would be 13 if two stations are
cut into the tunnels, and around 5 miles of underground tunnel
awaiting our use.
DfT KNOWS NOTHING OF THE TUNNELS
The Department for Transport in Westminster, regarding the re-use of the
tunnels, has stated "No such discussions with Merseytravel have taken
place".
MERSEYTRAVEL INEPT
Merseytravel need some decent people in their ranks and someone
should tell them about what we have ready and waiting under our feet.
They are unable to focus on what is essential to project the city forwards
- the South Parkway Station white elephant and needless tram scheme
proves that. They have lost the plot. They need big changes in that
organisation.
UNDERGROUND CIRCLE LINE MAINLY INTACT TO RE-USE
above a 1913 map showing the rail lines very well - the reason it is used. The
city is far bigger than this now in area. All the Liverpool area shown on the
map is now built on.
It is easy to see the great enhancement it makes to the city's underground.
And approx 80% of the Circle Line is already in place. It would create superb
seamless connectivity all over the Liverpool region, especially when Liverpool
John Lennon airport gets a station.
An underground Circle Line is Cheap
Expensive trams are just not needed. Focus should be on extending
the existing rapid transit underground system. That will project the city
forwards. This Circle Line should be the first phase.
The disused Dingle Tunnel is a half a mile long complete with an underground
station. How much would it cost these days to bore that tunnel and build
the station? £400 million? It is there for free.
There are two underground stations awaiting re-commission and one
station can be accommodated in the Waterloo Tunnel in a cutting wide
enough at Byrom St. Other stations can be cut into tunnels and others
left behind when cut & cover tunneling forming a Circle Line.
This new tunnel section would run from Dingle through Lodge Lane
regenerating two inner-city areas. Underground stations being
introduced in London have been a great catalyst for regeneration.
The city centre could have an outer city centre underground Circle
Line for a knock-down price, by constructing a section of tunnel, which
would be mainly cut & cover over parkland to complete the circle. This Circle
Line only uses one of the long disused tunnels, the Waterloo Tunnel.
The other tunnel, the Wapping - one of the oldest rail tunnels in the world -
by Stephenson - is not a part of this Circle Line. It can be brought into
commission later when funds allow. It crosses a currently used Northern
Line tunnel and can be branched into the Northern Line tunnel giving
great seamless connectivity from the Wirral Lines to the eastern lines of
Prescot and St. Helens. Work started on this this branch in the 1970s,
but was cancelled.
It is easy to see the great enhancement this Circle Line makes to the
city's underground. And approx 80% of this Circle Line idea is already in
place. It would create superb seamless connectivity all over the Liverpool
region, especially when Liverpool John Lennon airport gets a station.
AN UNDERGROUND CIRCLE LINE PROPELS THE CITY FORWARDS
An extended underground Circle Line would give:
growth.
NO MORE WHITE ELEPHANTS
We don't need another folly like South Parkway station. Trams will be a
another white elephant. The cost of them both is over £400 million.
Would bringing this Circle Line into being cost that? I doubt it, as most is
in place. And the Circle gives so much bang-for-buck.
NORTH END LOOP LINE EASY TO RE-COMMISSION
The north end Canada Dock line from Edge Hill to Kirkdale is still in
operation for freight. There is talk of reopening this line to Merseyrail
passengers to serve the new Liverpool FC stadium. Many stations are
still there and would be re-opened. The line could form a loop into the city
centre by re-using an old 1840s tunnel, the Waterloo Tunnel from Edge
Hill to Waterloo Dock. To bore such a long tunnel would cost £500
million - it is there waiting to be re-used complete with provision for a
station at Byrom St. It was last used in 1971 to take troops
to Northern Ireland.
Football fans could change at Edge Hill for Manchester and London lines
too. Or change for Lime St if need be. All seamless on Merseyrail.
Although not in this Circle Line idea, there is also the Wapping Tunnel of
similar length to the Waterloo Tunnel, also waiting to be re-used, so a
saving of £1 billion overall before you start. Either of these tunnels can
form the north end loop.
OUTER STATIONS CAN FORM LOCAL TRANSPORT HUBS
Stations on the north end Canada Dock Branch can form local transport
hubs. Hybrid/electric tram-like bendy-buses can operate from the rapid
transit Merseyrail stations and serve the local districts. There is no need
to run very expensive trams from the centre to the districts not served by
Merseyrail. The transport system can be integrated to compliment the
various transport modes with seamless computer ticketing.
A modern tram-like bendy-bus
We don't need dreaming of over expensive outdated tram systems and
other train spotter projects - having modern looking full glass fronted
trams is still trams. They were dropped 50 years ago for good
reasons and the reasons are valid today. We need to see the proper
positive impact such a rapid transit underground extension(s) can give to
the people of the Liverpool City Region. Expensive trams partially just
plug a gap that can be filled by modern hybrid/electric tram-like
bendy-buses - the other gap by an extended Merseyrail. Extending the
underground will propel the city forwards like no other transport system.
ST. HELENS AND SOUTH END LINES CAN LOOP INTO THE CENTRE
An electrified St Helens Merseyrail Line could enter Edge Hill and then drop
down the Waterloo Tunnel and continue around the Circle Line and back
up to Edge Hill and out again back to St Helens. They have access to
Liverpool Waters, Moorefields (business sector), South Docks, Central
(shopping) and all other stations along the way without changing. They
come into Liverpool centre, loop around the main points and then back
out, as the Wirral lines do. The Circle line makes this possible. A line
from St. Helens to Chester, via Liverpool centre, on Merseyrail can be
accommodated too. All is possible if this cheap Circle Line is built.
The same maybe possible with a south end city loop too. Re-use the
trackbed from Halewood to Broad Green and a loop is formed along the
Northern Line to Hunts X, Gateacre, Childwall, Broad Green, Edge Hill and
into the centre and back again.
So three loops, north end, south end and St. Helens. All using this outer
city centre Circle Line as the mechanism. This Circle Line is the core and
must be the next transport project in Liverpool.
MASSIVE POTENTIAL OF UNDERGROUND
All in all we could have a highly comprehensive underground system, that
could be extended even further using trackbed and disused stations. The
potential is enormous. This is where focus should be, not expensive
needless trams
Other cities around the world would drool at having what Liverpool has waiting
to be re-commissioned. Liverpool ignores it and goes off in a foolish
direction!!!
Doesn't Merseytravel know what disused infrastructure is here waiting for
re-use? I doubt it after putting forwards a needless expensive tram
project. It is about time the government came in and had a look at what
those people do and tel them what to do.
-----------
Liverpool has nearly 4 miles of disused rail tunnel under its
centers and inner city. So, why is this half-baked tram idea being
pursued?
Wapping Tunnel: 1.26 miles: 2.03 km
Waterloo Tunnel: 2.07miles: 3.34 km
Dingle Tunnel: 0.5 miles: 0.8 km
Also, the disused Haymarket Tunnel running under the centre of
Birkenhead is 0.75 miles long.
Liverpool has two underground stations waiting to be re-commissioned,
Dingle and St James' at Parliament Street, and provision for another two in
underground tunnel cuttings, Byrom Street and the Cavendish Cutting.
Merseyrail has the potential to be the most comprehensive "metro"
system, underground/overground, in the UK. If all the disused lines,
trackbed, stations and tunnels are brought back into use and seamlessly
merged in. Merseyrail will cover more than London's Underground in
percentage terms of its served population.
Top class cities have underground systems. Second tier cities have
trams. Manchester wanted an underground train system, but could not afford
it, so went for makeshift 2nd rate trams. So Liverpool with a plethora of
disused underground infrastructure under its city goes for ....trams. Yes,
trams. Well Manchester has them don't they. They have no idea.
Merseyrail has in underground rail:
- Six underground stations.
- Two stations at the end of tunnels (viewed as partial underground stations)
- One disused underground station
- Two disused underground stations in tunnel cuttings (viewed as underground)
- At least one station can be built into a tunnel vent cutting (viewed as
underground) - Stations can be cut into tunnels (e.g., one in the disused Haymarket
tunnel in Birkenhead, and an essential station for the Royal Liverpool
Hospital) - There are four underground tunnels awaiting re-commission.
So, that is 11 underground stations, which would be 13 if two stations are
cut into the tunnels, and around 5 miles of underground tunnel
awaiting our use.
DfT KNOWS NOTHING OF THE TUNNELS
The Department for Transport in Westminster, regarding the re-use of the
tunnels, has stated "No such discussions with Merseytravel have taken
place".
MERSEYTRAVEL INEPT
Merseytravel need some decent people in their ranks and someone
should tell them about what we have ready and waiting under our feet.
They are unable to focus on what is essential to project the city forwards
- the South Parkway Station white elephant and needless tram scheme
proves that. They have lost the plot. They need big changes in that
organisation.
UNDERGROUND CIRCLE LINE MAINLY INTACT TO RE-USE
above a 1913 map showing the rail lines very well - the reason it is used. The
city is far bigger than this now in area. All the Liverpool area shown on the
map is now built on.
- The proposed Circle Line loop line is in blue.
- The blue and pink are existing disused tunnels
- The blue and green is predominantly cut and cover not tunnelling.
- The blue only is existing used line.
- Tunneling where cut and cover meets existing tunnels.
- The red is the existing unused Wapping tunnel, which is not on the Circle
Line. This can be used to link the Wirral with Edge Hill and beyond if need be. - The new stations are marked
- The long blue/pink line is the disused Waterloo Tunnel
- The spur to the south is nice to have bringing in two districts onto the
Merserail by diverting the Northern Line, and not part of the proposed Circle
Line. Easily done by cut & cover across parkland and down a duel carriageway.
It is easy to see the great enhancement it makes to the city's underground.
And approx 80% of the Circle Line is already in place. It would create superb
seamless connectivity all over the Liverpool region, especially when Liverpool
John Lennon airport gets a station.
An underground Circle Line is Cheap
Expensive trams are just not needed. Focus should be on extending
the existing rapid transit underground system. That will project the city
forwards. This Circle Line should be the first phase.
The disused Dingle Tunnel is a half a mile long complete with an underground
station. How much would it cost these days to bore that tunnel and build
the station? £400 million? It is there for free.
There are two underground stations awaiting re-commission and one
station can be accommodated in the Waterloo Tunnel in a cutting wide
enough at Byrom St. Other stations can be cut into tunnels and others
left behind when cut & cover tunneling forming a Circle Line.
This new tunnel section would run from Dingle through Lodge Lane
regenerating two inner-city areas. Underground stations being
introduced in London have been a great catalyst for regeneration.
The city centre could have an outer city centre underground Circle
Line for a knock-down price, by constructing a section of tunnel, which
would be mainly cut & cover over parkland to complete the circle. This Circle
Line only uses one of the long disused tunnels, the Waterloo Tunnel.
The other tunnel, the Wapping - one of the oldest rail tunnels in the world -
by Stephenson - is not a part of this Circle Line. It can be brought into
commission later when funds allow. It crosses a currently used Northern
Line tunnel and can be branched into the Northern Line tunnel giving
great seamless connectivity from the Wirral Lines to the eastern lines of
Prescot and St. Helens. Work started on this this branch in the 1970s,
but was cancelled.
It is easy to see the great enhancement this Circle Line makes to the
city's underground. And approx 80% of this Circle Line idea is already in
place. It would create superb seamless connectivity all over the Liverpool
region, especially when Liverpool John Lennon airport gets a station.
AN UNDERGROUND CIRCLE LINE PROPELS THE CITY FORWARDS
An extended underground Circle Line would give:
- city regeneration
- sustainable future growth
- higher profile image
- attract tourists
- attract outside business investment
- attract outside property investment
- attract overall growth of the airport when Merseyrail
is extended to it - overall growth of the Liverpool Region
- permanent social improvements in the inner-city areas
growth.
NO MORE WHITE ELEPHANTS
We don't need another folly like South Parkway station. Trams will be a
another white elephant. The cost of them both is over £400 million.
Would bringing this Circle Line into being cost that? I doubt it, as most is
in place. And the Circle gives so much bang-for-buck.
NORTH END LOOP LINE EASY TO RE-COMMISSION
The north end Canada Dock line from Edge Hill to Kirkdale is still in
operation for freight. There is talk of reopening this line to Merseyrail
passengers to serve the new Liverpool FC stadium. Many stations are
still there and would be re-opened. The line could form a loop into the city
centre by re-using an old 1840s tunnel, the Waterloo Tunnel from Edge
Hill to Waterloo Dock. To bore such a long tunnel would cost £500
million - it is there waiting to be re-used complete with provision for a
station at Byrom St. It was last used in 1971 to take troops
to Northern Ireland.
Football fans could change at Edge Hill for Manchester and London lines
too. Or change for Lime St if need be. All seamless on Merseyrail.
Although not in this Circle Line idea, there is also the Wapping Tunnel of
similar length to the Waterloo Tunnel, also waiting to be re-used, so a
saving of £1 billion overall before you start. Either of these tunnels can
form the north end loop.
OUTER STATIONS CAN FORM LOCAL TRANSPORT HUBS
Stations on the north end Canada Dock Branch can form local transport
hubs. Hybrid/electric tram-like bendy-buses can operate from the rapid
transit Merseyrail stations and serve the local districts. There is no need
to run very expensive trams from the centre to the districts not served by
Merseyrail. The transport system can be integrated to compliment the
various transport modes with seamless computer ticketing.
A modern tram-like bendy-bus
We don't need dreaming of over expensive outdated tram systems and
other train spotter projects - having modern looking full glass fronted
trams is still trams. They were dropped 50 years ago for good
reasons and the reasons are valid today. We need to see the proper
positive impact such a rapid transit underground extension(s) can give to
the people of the Liverpool City Region. Expensive trams partially just
plug a gap that can be filled by modern hybrid/electric tram-like
bendy-buses - the other gap by an extended Merseyrail. Extending the
underground will propel the city forwards like no other transport system.
ST. HELENS AND SOUTH END LINES CAN LOOP INTO THE CENTRE
An electrified St Helens Merseyrail Line could enter Edge Hill and then drop
down the Waterloo Tunnel and continue around the Circle Line and back
up to Edge Hill and out again back to St Helens. They have access to
Liverpool Waters, Moorefields (business sector), South Docks, Central
(shopping) and all other stations along the way without changing. They
come into Liverpool centre, loop around the main points and then back
out, as the Wirral lines do. The Circle line makes this possible. A line
from St. Helens to Chester, via Liverpool centre, on Merseyrail can be
accommodated too. All is possible if this cheap Circle Line is built.
The same maybe possible with a south end city loop too. Re-use the
trackbed from Halewood to Broad Green and a loop is formed along the
Northern Line to Hunts X, Gateacre, Childwall, Broad Green, Edge Hill and
into the centre and back again.
So three loops, north end, south end and St. Helens. All using this outer
city centre Circle Line as the mechanism. This Circle Line is the core and
must be the next transport project in Liverpool.
MASSIVE POTENTIAL OF UNDERGROUND
All in all we could have a highly comprehensive underground system, that
could be extended even further using trackbed and disused stations. The
potential is enormous. This is where focus should be, not expensive
needless trams
Other cities around the world would drool at having what Liverpool has waiting
to be re-commissioned. Liverpool ignores it and goes off in a foolish
direction!!!
Doesn't Merseytravel know what disused infrastructure is here waiting for
re-use? I doubt it after putting forwards a needless expensive tram
project. It is about time the government came in and had a look at what
those people do and tel them what to do.
-----------