Whilst not the correspondent from Three Bridges (well, very rarely!), from recent practical experience I can confirm that it is by no means significantly quicker to use that crossover, as per the above. In addition, to do so adds more conflict with the Slow Reversible Line through South Croydon Platform 4 - you have to cross between lines both to the North of the station and again at South Croydon Junction, rather than just the single all-encompassing conflicting move at the latter junction.
The Slow Reversible route can also be used in both peaks to queue up slow-moving passenger trains alongside the Up Slow on approach to East Croydon. To use the crossover North of South Croydon would reduce the effectiveness of this, as it would reduce the number of signal sections able to be occupied (or needed for overlap) due to slow moving (not necessarily stopped) trains moving towards London.
To eliminate using either crossover, a number of passenger services during the day, in addition to freight trains, do head South from East Croydon Platform 5, down the Slow Reversible and straight onto the Down Slow. This particularly includes many trains via Redhill between the peaks, such as Horsham stoppers.
I suspect there may also be a small legacy here from the times when South Croydon - Milton Keynes Ctl services reversed at South Croydon Platform 4, which would have led to Platform 5 being used on a regular basis to avoid this manoeuvre. Obviously this is no longer a consideration at most times of the day, but I seem to remember in the very back of my mind that timings were slightly adjusted for services maintaining a route on the Down Slow via the slower crossover to the South of South Croydon station, in recognition of the reduced speed. It may be that these timings are simply now taken advantage of.
The crossover is used primarily for movements such as the following:
- Preparing for the turning back of stock which would be unable to do so at East Croydon because they had used Platform 6; ECR Platform 6 is permitted for detraining and locking out services, but all stock must in any case proceed to South Croydon Platform 4, or Purley, to turn back anyway.
- Allowing trains to be brought into South Croydon side by side for transferring passengers or crew between them for routes via Oxted, where trains were not sequenced correctly to do so at East Croydon.
- As has been stated above, for fast services to overtake slow ones if insufficient platform lines were available at East Croydon (as an example, sometimes done by GX services on Sundays when the Fast Lines are closed, either as a service recovery or timetabled measure).