Kite159
Veteran Member
Is the new rolling stock going to be for 2-car units or will Nexus see some sort of sense and order it as fixed formation 4-car units (to increase available space)?
But they are already running 4 car trains all day long aren't they? Or are they pretending that two cars are one car like the DLR do?
They trialled single Metrocar operation on Sundays on the Sunderland extension for a while a little over a decade ago (circa 2005, I think), though clearly it wasn't adopted long term.It would make an awful lot of sense to run the lot as one long unit, given they haven't run anything as a single metrocar since the 90s (outside the depot).
Very few station platforms are long enough for 3 or 4 car operation, and those that are need DOO equipment improvements to make it safe to work.
I've read elsewhere that we should expect a service cut from January in preparation for the Nexus takeover. Let's hope it's not a drastic change as this could cause major branding issues. Strategically, a 20 minute service in the evening could be disastrous. As the MetroCars have the top spot for most unreliable EMUs in the country, how can they risk having 40 minute gaps in the service in the evening due to stock failures?
Metrocar4058 said:Let's hope they are just cutting some of the short works which clog up the lines delaying full services. In my view there are a few too many peak trains which carry too much fresh air, instead there should be an aim to strategically plan these extra services to fit with the demand. Maybe a few Monkseaton - Jarrod trains as this seems to be a busy route at peak.
I've read elsewhere that we should expect a service cut from January in preparation for the Nexus takeover.
--- old post above --- --- new post below ---Nexus_comms said:We don't normally comment directly on posts in forums, but we would like to point out the above claims are completely untrue. There are no discussions about reducing service frequency and Nexus can afford the service we specify - passenger numbers have risen sharply in the last two years and Metro now operates without local council subsidy, on a combination of fares and Government rail grant.
I'm not arguing the fact that the majority of stations have room for platform expansion, however if say 95% of stations need some sort of work to cater for longer trains then the cost will be significant.
There is also the fact that Nexus have specified they are looking to procure less than the current 90 car fleet, not more.
I'm not arguing the fact that the majority of stations have room for platform expansion, however if say 95% of stations need some sort of work to cater for longer trains then the cost will be significant.
There is also the fact that Nexus have specified they are looking to procure less than the current 90 car fleet, not more.
The bidirectional NR lines are probably left over from when the Leamside line was in use. A train can go onto the Leamside line using only the down line though Heworth in the up direction, which would leave the up line (normal Heworth to Sunderland line) free for use. I've only seen both lines used in bidirectional working once when there was a possession.
The signal approaching Jesmond is 609. Normal single yellow aspect gives the route to Jesmond platform 1. A single yellow and junction indicator no.1 gives the route to 613 signal on the Manors curve via 611 ground position light. This is used where trains are going to Manors in the morning. A single yellow and junction indicator no. 2 used to give the route to Jesmond platform 2, but this is no longer a route as the points were removed a while back. The subsidiary signal on 609 gives route to 611 signal which is alongside the Carriage pub, and is used when turning trains back out of service towards West Jesmond without using Jesmond platform 1.
I had a feeling that the RHS junction indicator was historical!In my own experience of South Shields - Jesmond, even in rush hour, it is rare that people cannot fit onto the train - is this different in other areas of the system? Of course people may struggle to board a full service train in the central belt, however they have shorts for this purpose.
I think it's not unreasonable to not get a seat during rush hour - happens on most light rail systems. With regards to experiencing difficulty getting onto the peak coast trains at haymarket - could you get a monkseston short then change? Not ideal but would get you home.![]()
Agree with you that having one long unit would be more beneficial in terms of space than having 4 cabs.
Also, I noticed both yourself and 142094 have suggested better diagramming of the shorts - how do you guys think they should be diagrammed? I was thinking about it earlier and it seems to me that you can either diagram it to be:
A) Full - Short - Full - Short
or
B) Yellow line - Green line - Yellow line - Green line
but not both A and B at the same time.
Taking example A, it would be:
Full yellow - Short yellow - Full green - Short green - Full yellow...
And example B would be:
Full yellow - Full green - Short yellow - Short green - Full yellow...
Finally, I happened to come across a photo of that National rail line under bidirectional working!
Edit: in hindsight that could just be from when the Jarrow - Pelaw freight line was still in use and it needed to cross lines.
![]()
Something ideal would be a walkthrough train similar in style to the S Stock but with a smaller cab (possibly half width like currently). I have a feeling this will be the way Nexus go (or at least should). Trams simply couldn't cope with demand, they have limited capacity and don't have as long a shelf life.
The ideal diagram for the short services would be where the shorts are then followed by the full services. So something like:
Short Yellow - Full Yellow - Short Green - Full Green - Short Yellow - Full Yellow etc. that would mean that the first train would be the short service meaning passengers for stations served outside of the short services are able to get on.
How does that compare to current timetabling? The Jarrow tanks have started to run again iirc and that line is now back in use. The Jarrow tanks on occasion have been pathed to go further on the bi-di so that another service can pass - on one occasion a freight to Tyne Dock was looped, and a Northern service passed towards Newcastle with the tanks in between going along slowly before following behind the Northern unit. This also meant the Tyne Dock freight got moving quicker.

The talk from Nexus appears to lie with trains, thankfully.I think this is a defining moment where Nexus decide whether they see the system as light rail or tramway. I agree that something like the S stock is preferable to a tram.
How does that compare to current timetabling?
could the new fleet be ordered to have both electrical and diesel capabilities
Also, I noticed both yourself and 142094 have suggested better diagramming of the shorts - how do you guys think they should be diagrammed?
4077 out this morning on a peak service.
4077 out this morning on a peak service.
I read on My_Metro that there were plans to refurbish Monument but it was cancelled due to budget restraints and that South Shields is the only planned works. Does anyone know if the works at Heworth and Tyne Dock will go ahead as per the NECA report?
Also, will Monument see a facelift within the coming years? Surely it will need to be done for safety and access reasons?