Whilst the county council shows no enthusiasm for the reopening, a number of district councils and the national park authority have shown support for the reopening including blocking development plans that
The problem with re-openings in England and Wales is there's often not the capacity to make full (or indeed much) use of re-opened lines. The Penrith to Keswick proposal for example could really use some of the precious capacity on the WCML to make proper sense, otherwise it becomes a slightly pointless rural backwater service with a Class 153 merrily pottering about at 30mph and being of interest mainly to Michael Portillo types.
I checked a couple of the underbridges In Keswick. The steel superstructure has had it - hardly surprising given half a century of no maintenance. The masonry supports need some work but could probably be reused. They would need detailed examination of course. This indicates that the line is in the state you would expect, and will need some major work to rebuild.
In the case of Keswick to Penrith the signalling headways from Penrith to Carlisle are, correct if I am wrong, no more than about 2.5 miles. At the moment the route has 3 passenger trains per hour.
The WCML capacity problem is not to do with number of trains, but with the mix of fast passenger and slower freight trains. The freight needs to get as far as it can before getting into a loop, and then (especially if diesel hauled and on an uphill section) takes ages to get up to speed again.
This does actually mean that there might be "windows" of time for an extra train to sneak out onto part of the route in the gaps that open up between longer-distance trains, but it would be very difficult to timetable in practice.
I suspected that would be the answer.
Perhaps a system similar to Oxenholme to Windermere could prevail were a DMU shuttled up and down the branch with a few workings through to Carlisle.
If the through trains to from Carlisle could be at suitable times for commuting, we might be nearer to meeting criteria for reopening.
I would be extremely satisfied with an hourly Keswick-Penrith shuttle with morning peak extension to Carlisle and evening peak from Carlisle. Bring it on.
I can't understand that £45m is spent at Market Harborough and £100 on adding track to the MML, which is in effect a reinstatement, yet reinstating routes to say Keswick and Ripon for similar cost is ignored.
A) it's not ignored
B) it's not similar cost (or anything remotely like it)
C) the projects are all assessed on the same criteria; the MML works have a positive business case when compared to alternatives, Penrith - Keswick doesn't.
Is that *really* the only output?£45m at MH to save 30 seconds.
A)
C) the projects are all assessed on the same criteria; the MML works have a positive business case when compared to alternatives, Penrith - Keswick doesn't.
The C may have increased significantly since 2007 due to the damage caused by Storm Desmond as noted above.Benefit to cost ratio of around of 1.32:1 as a base case, up to 2.59:1 with optimistic passenger numbers, and could rise to 3.29:1 under certain circumstances" (2007)
Taken from the CKP railways website
"Benefit to cost ratio of around of 1.32:1 as a base case, up to 2.59:1 with optimistic passenger numbers, and could rise to 3.29:1 under certain circumstances" (2007)
Not sure how you can say they don't have a positive business case, whilst I appreciate that these figures could be affected over time by various factors, such as new housing / business developments etc they at least give an indication, imo, that there is potential to reopen this line.
Obviously the other major factor, besides tourism, is how many passengers would use this service on regular basis ie commuters, I appreciate that there is currently a decent bus service operating and obviously because of a lack of any public alternative, they effectively have a monopoly.
As you say in a previous post, the line needs a USP, it obviously needs to be quicker than a bus, have decent timed connections to Penrith, competitive fares and have a bloody good PR and marketing plan, to name but a few things !
Is that positive insofar as it's not very negative?The summary seems to suggest that if there was no contribution from government that the BCR falls to 0.8:1 or less...
Yes still positive but I think it clearly indicates that some fudging of figures, aka creative accounting, is going on.
Is that positive insofar as it's not very negative?
I can't understand that £45m is spent at Market Harborough and £100m on adding track to the MML, which is in effect a reinstatement, yet reinstating routes to say Keswick and Ripon for similar cost is ignored.
By some. Last I heard the official figure was approximately £55B.HS2 now estimated at £80billion...
The point I was making is that anything below 1 is negative.HS2 now estimated at £80billion with BCR down to 0.4 should be cancelled by comparison, but can't see that happening, so why shouldn't Penrith-Keswick costing £80m and minimum BCR of twice HS2 at 0.8 and Ripon-Harrogate costing £55m with BCR of 3.6 be reinstated?
By some. Last I heard the official figure was approximately £55B.
By the way, you didn't answer my question as to if a 30 second saving was the only output of the money being spent at Market Harborough?
HS2 now estimated at £80billion with BCR down to 0.4 should be cancelled by comparison, but can't see that happening, so why shouldn't Penrith-Keswick costing £80m and minimum BCR of twice HS2 at 0.8 and Ripon-Harrogate costing £55m with BCR of 3.6 be reinstated?
By whom?
The Tax payers Alliance
Also, how many trains are saving the 30 seconds each?
The point I was making is that anything below 1 is negative.
So about 55 services a day, give or take.Only the ones not stopping at MH.
Yes to all of the above. Along with a new station building and, I believe, a new car park....I presume that the new/re-aligned platforms at Market Harborough will be full length, less curved, higher and be provided with better cover.
Although I accept that it might not make much difference to the BCR I presume that the new/re-aligned platforms at Market Harborough will be full length, less curved, higher and be provided with better cover. This will be a major benefit to passenger comfort and safety as well as reducing delays (whilst passengers walk through or are helped on and off trains as in the current unsatisfactory arrangements).
Yes to all of the above. Along with a new station building and, I believe, a new car park.
Only the ones not stopping at MH.
How many trains between Ripon and Harrogate will reduce present journey times by 20 minutes? Only 3 trains would save more in time per day than all the trains not stopping at MH.
And lower costs for the electrification (seperate project)
--- old post above --- --- new post below ---
Benefits for time saving are based on passengers, not trains. It is known how many passengers will benefit from the Market Harborough improvement. And it's quite a lot. It isn't known how many will benefit from Ripon - Harrogate (although you can take an educated guess).
Let us all remember that the title of this thread covers the area of Penrith to Keswick which seems somewhat distant from the areas of both Market Harborough (which is rail connected) and Ripon (which is no longer rail connected)
Yes, but my point is that HS2 is down to 0.4 but the Government is still going ahead with it.