yep it is quite a bit of a climb!

I guess expectations are different from a few years ago. But pre Jubilee line, the old Underground ticket office can't have been much higher than the current one, and from there it was stairs/ inclines/ramps all the way to platform level.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

BingBong50

Member
Joined
17 Jan 2014
Messages
136
Location
Coulsdon
What happens to the area in Tooley Street previously occupied by The London Dungeon? Does this area eventually become part of the redevelopment?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,282
What happens to the area in Tooley Street previously occupied by The London Dungeon? Does this area eventually become part of the redevelopment?

I don't think it gets rebuilt to anything like the main concourse area. I believe Network Rail are using the area where the Dungeon was for retail 'back of house' purposes.

I've seen it argued somewhere that the Dungeon moved voluntarily, mainly because their owners wanted to consolidate at County Hall, and the station rebuild was just an opportune moment to leave. It may be that their entrance would have been temporarily hidden behind the Tooley St worksite hoardings that will divide the whole street lengthways, from August sometime, but I can't see any evidence that the interior area gets altered.

One of the planning drawings I have downloaded still shows an area labelled as London Dungeon in the final arrangement, with 'retail' in all the arches alongside Tooley St to the east of the Dungeon entrance.
 
Last edited:

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,828
I've seen it argued somewhere that the Dungeon moved voluntarily, mainly because their owners wanted to consolidate at County Hall, and the station rebuild was just an opportune moment to leave.

voluntarily adv., to be paid a shedload of cash to be released from a lease and compensated for a move to a location that is significantly better for the tourist trade compared to where they were.
 
Last edited:

ScotGG

Established Member
Joined
3 Apr 2013
Messages
1,585
Is the old 'flat iron' like building coming down yet? The one with an imitation v2 rocket on the side?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,282
Is the old 'flat iron' like building coming down yet? The one with an imitation v2 rocket on the side?

Yes it is, I noticed in an photo taken from the Leadenhall Building a few days ago that the north end of the old footbridge was visible because the SER offices had shrunk. May not be down to ground level yet though.
 
Last edited:

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,828
Not down yet. Demolition underway. A load of scaffolding came out today, I'd say it's around halfway done.
 

theageofthetra

Established Member
Joined
27 May 2012
Messages
3,565
Location
Beckenham
The old SER office is about halfway down now. There were some nice pre-grouping features on the outside of that building- I wonder if any were saved or have been sold to architectural salvage firms?
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,452
I was passing through London Bridge the other evening and I found the signage to be less than helpful. I was trying to find the loos. In the area towards the tube entrance there was floor signage but as I started upstairs I'd never see that. I was told to take the escalator and almost went down the one to the Shard, until someone stopped me to ask where I was going. Good job they did.

Then after that I was looking for a cash machine. Again no helpful signage.

They also put up the Horsham train platform quite late, which I guess isn't helpful for you don't know which group of platforms it goes from. It actually left late but I assume they couldn't be certain of it doing that.

Sent from my SM-G925F using Tapatalk
 

FOH

Member
Joined
17 Oct 2013
Messages
768
I don't know what they did today but the whole concourse stank like a sewer this evening
 

Blindtraveler

Established Member
Joined
28 Feb 2011
Messages
10,544
Have they been disconnecting and/or moving drainage etc in the area now more buildings are being demolished and areas stripped out?
 

ijmad

Established Member
Joined
7 Jan 2016
Messages
1,856
Location
UK
Why does the lift on Platform 11/12 (glimpsed through the window in the hoardings) have buttons for floors 0, 1 and 2? I thought they only went between street level and platform level... What's the third destination?!
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,282
I think there's a two storey building below the terminating platforms and within the south end of the concourse which contains the main ticket office on the ground level. There may be something upstairs including I think the station control room, which would be on a sort of middle level, but it might not necessarily be available to the public, it could be inhibited without a key.
 
Last edited:

ijmad

Established Member
Joined
7 Jan 2016
Messages
1,856
Location
UK
I think there's a two storey building below the terminating platforms and within the south end of the concourse which contains the main ticket office on the ground level. There may be something upstairs including I think the station control room, which would be on a sort of middle level, but it might not necessarily be available to the public, it could be inhibited without a key.

Yeah, I kinda figured that would be the answer after thinking about it a little bit. Surprised to see a big orange button for the floor rather than something more hidden away.
 

JB1601

Member
Joined
4 Aug 2011
Messages
64
What are the plans for the bus station at the front once all is finished at the station? I read somewhere that it will be "expanded", hopefully that means bringing in more of the buses that terminate on London Bridge itself currently?
 

transmanche

Established Member
Joined
27 Feb 2011
Messages
6,021
What are the plans for the bus station at the front once all is finished at the station? I read somewhere that it will be "expanded", hopefully that means bringing in more of the buses that terminate on London Bridge itself currently?
I thought the bus station was completely redeveloped just a few years ago, in time for the Olympics?
 

JB1601

Member
Joined
4 Aug 2011
Messages
64
I thought the bus station was completely redeveloped just a few years ago, in time for the Olympics?

It was but a number of routes were moved onto the bridge whilst all the various construction work was going on. I was wondering if it was stuck in the formation it is now or if some of them might make it back into the bus station again once 2018 arrives.
 

JamesRowden

Established Member
Joined
31 Aug 2011
Messages
1,762
Location
Ilfracombe
I have noticed that Hastings Line services diverted via Redhill will continue to terminate at London Bridge after Charing Cross services begin to call at London Bridge again. Is this because the connections between the Brighton Mainline and Charing Cross are not there anymore or is it a change of policy?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,282
The final layout does not provide for timetabled services through New Cross Gate to Charing Cross, although there are various crossovers for use during emergency recovery and engineering works etc.

But I thought ex Southern route services to Charing Cross had been permanently binned from the Dec 2009 timetable for capacity reasons anyway?
 

JamesRowden

Established Member
Joined
31 Aug 2011
Messages
1,762
Location
Ilfracombe
The final layout does not provide for timetabled services through New Cross Gate to Charing Cross, although there are various crossovers for use during emergency recovery and engineering works etc.

But I thought ex Southern route services to Charing Cross had been permanently binned from the Dec 2009 timetable for capacity reasons anyway?

Charing Cross to Hastings via Redhill and Tonbridge would run when there were railworks or disruption at Sevenoaks. A Southeastern service.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,282
Then I expect they'll be possible as engineering diversions, but not until the final layout is finished. There are big gaps between the terminating and Southeastern lines at the moment, until the Charing Cross lines are slewed back to their final positions.
 

JamesRowden

Established Member
Joined
31 Aug 2011
Messages
1,762
Location
Ilfracombe
Then I expect they'll be possible as engineering diversions, but not until the final layout is finished. There are big gaps between the terminating and Southeastern lines at the moment, until the Charing Cross lines are slewed back to their final positions.

Not having the Charing Cross to Brighton Main Line connection must make it complicated, in the event of major disruption at Sevenoaks, to switch quickly from operating Charing Cross to Hastings via Sevenoaks services to operating London Bridge to Hastings via Redhill services.
 

FOH

Member
Joined
17 Oct 2013
Messages
768
So the hoardings on the platforms have been replaced by metal barriers that have reduced the width of the already dangerously narrow platforms by another foot. Beggars belief.
 

ijmad

Established Member
Joined
7 Jan 2016
Messages
1,856
Location
UK
Is the staff staircase in front of the lift between P13/14 staying, or is that temporary while they actually installed the real lifts/escalators/stairs?
 

ijmad

Established Member
Joined
7 Jan 2016
Messages
1,856
Location
UK
So Thameslink Programme publish this walking routes diagram for how the station will be arranged after the bank holiday. Interesting details I noticed are:

  • Western Concourse open - but in peak only
  • Pedestrianised Stainer Street open with exit to Tooley St - but AM peak only
  • Hoarding line for next phases by escalators for P6/7
 

Attachments

  • LBWalkingRoutesConcourseMap_for_web.jpg
    LBWalkingRoutesConcourseMap_for_web.jpg
    128.2 KB · Views: 165