Ah didn't realise the rules had changed. Speculation, but it probably makes more sense just to close the platforms under the bridge and extend them to the east, where there is plenty of room. Would be a shame to destroy this bridge.
Having read the previous comment by 55z about building a new station between Garforth and East Garforth, looks this is exactly what they're planning, whilst also tackling the access issues and consolidating stops on the line.
Not cheap of course, but sensible.
Just to repeat Joseph Locke's comments in the Blackpool electrification thread (where a similar issue is being discussed) is that the rise and fall of the contact wire height has to be undertaken within limits.
These limits are based on linespeed and in sites such as this, will also be limited by any additional height changes needed for further structures.
Do you actually work? You spend so much time posting here. But it is very informative if it is all correct. Keep up the accurate stuff.
Do you actually work? You spend so much time posting here. But it is very informative if it is all correct. Keep up the accurate stuff.
A 355 mm rise to 4700 mm above rail at the example 1 in 100 gradient mentioned in the Blackpool thread would mean platforms would need to start at least 35.5m from the bridge. You could probably retain the existing ticket office and would certainly keep the car park, but the platform would start halfway along the station building. Maybe with an access path round the edge of the station building, away from the platform edge. At least that would make room for a ramped footbridge from the existing northern pedestrian access next to the bridge.
What I can't figure out is how you'd get pedestrians to the other end of the platform from the East Garforth end - you couldn't dress it up as merging the stations, it would just be closing East Garforth. Perhaps a lineside footpath to each platform from the bridge at Bar Lane?
Anyway, this is getting a bit off topic, though it would make sense to figure all this out before electrification enabling works at Garforth. Along with deciding on the new station at Thorpe Park and / or turning Micklefield into East Leeds Parkway. Either of which might get some of the "sorry you can't have trolley buses" transport money for Leeds. And may be presented as compensation for the loss of East Garforth.
Last year(?) there was a report by the West and North Yorkshire Chambers of Commerce advocating widening of the eastern approach to Leeds to 4 tracks, two of which would be a different route into Leeds for HS2. I seem to remember it had some fairly detailed plans in it. It was discussed on here somewhere.
It was discussed and linked in the HS2 Leeds station thread here.
So still plausible, if the budget can accommodate it. Marsh Lane to just east of the M1 should be fairly easy to four track, Garforth will be tricky but possible, not sure about Micklefield but if the station was getting rebuilt anyway it might not be too bad. Anyone have any idea of the likelihood of four tracking anywhere between Leeds and Micklefield?
The Yorkshire Hub report on Leeds HS2 station mentions 53 (non-HS2) services per hour into Leeds from the West, but doesn't say how many were projected from the East.
TfN's spring 2016 report says on page 25 that Northern Powerhouse Rail wants 4 TPH Leeds to Newcastle (in 60 mins) and 2 TPH Leeds to Hull (in 45 mins). Currently, there are 10 services westbound between 0756 and 0856 passing through Garforth, and in the evening peak 1 TPH to Hull and 2 TPH to Newcastle from Leeds. So NPR brings at least 3 more TPH each way, a Micklefield turnback... not sure what that would add. 2TPH? An extra stopping TPH to Selby is being considered, as per recent additional details on Northern franchise. We're looking at 13 to 19ish trains per hour, with very mixed performance and stopping patterns, ignoring freight.
More accurate figures may emerge in the autumn NPR report, as they look deeper into the details of what they're planning.
What's the nominal TPH capacity of two track and 4 track, for mixed traffic?
Could someone please remind me just how many trains per peak hour are proposed to make use of this four-track section?
The Micklefield turnback was included in the CP5 HLOS and initial CP5 plans to allow 2 extra Calder Valley trains to run into Leeds. This has disappeared from the post Hendy plan and seems to have been replaced by running 6 car trains.
--- old post above --- --- new post below ---
Within the next franchise period, there are 5 TPE tph, 1 Cross Country tph and 2 Northern tph, although Northern are hoping to add a third.
The problem is that the 2 Northern stoppers take 20mins to travel between Leeds and Micklefield, whereas the TPE and XC take 10min so without a passing loop in this stretch, the 6 fast services are squeezed into just over 30mins. Already alternate Northern services from York, which stop additionally at Church Fenton, have to leave York 9 minutes earlier and wait at Church Fenton for a TPE service and a XC service to pass.
Since Network Rail have said that there will be no upgrades that require purchase of land during the electrification project, I can't see any major quadrupling of the line. Sorting out a suitable passing loop would be nice.
My understanding is that there is enough land for four tracks at least as far as Micklefield, it's just an infrastructure and budget challenge.
The Chamber of Commerce report discussed above describes the issues involved in widening the route, though only between Leeds and a point short of Garforth:
http://leeds.wnychamber.co.uk/wp-content/uploads/HS2-Leeds-Station-Chamber-position-July-2015.pdf
I know Stalybridge is part of Blackpool -Manchester - but anyone seen any work at all on this project recently?
Passed through today.
Could just about be convinced that the first "scrapes" have begun to appear between Ashton and Staley, plus the odd marker peg.
There is evidently general route upgrade work going on west of the M60 (track and drainage renewal etc).
Still no sign of resignalling though (to replace Ashton Moss and Baguley Fold boxes).
All the bridges look to be finished.
The route is closed on Sundays so they must be doing something.
Yeah, although it's hard to pinpoint what is and what isn't electrification works on the stretch at the minute. The last I saw was a couple of weeks ago, drainage works around Droylsden and Littlemoss, in preparation for stanchions etc.
Passed through today.
Could just about be convinced that the first "scrapes" have begun to appear between Ashton and Staley, plus the odd marker peg.
There is evidently general route upgrade work going on west of the M60 (track and drainage renewal etc).
Still no sign of resignalling though (to replace Ashton Moss and Baguley Fold boxes).
All the bridges look to be finished.
The route is closed on Sundays so they must be doing something.
Trains have been back and up running on Manchester & Huddersfield line (on Sunday's) now for past months (I think) and closure were just for eight weeks in summer which normally do.
Is the area around Littlemoss naturally well drained or are there any possibilities of flooding? The M60 in that area seems to have flood warning notices displayed on a permanent basis.
I think it's important to remember that the section of the M60 through Ashton cut between a reservoir and a large section of body of peat bog, so some drainage issues are expected I suppose.