I can only speak for my side but we are learning the route as it changes. Briefings and videos mostly. It is an incremental change.
I think Thameslink will need a total resign as they currently do not go through London Bridge so no-one is driving it so it will drop off their route cards. For our side we many also need to re sign London Bridge to Blackfriars IF we keep it on our route card (which I doubt)
[on topic] It will no doubt be covered by RDW when they re sign the route. [/on topic]
I think Thameslink will need a total resign as they currently do not go through London Bridge so no-one is driving it so it will drop off their route cards. For our side we many also need to re sign London Bridge to Blackfriars IF we keep it on our route card (which I doubt)
[on topic] It will no doubt be covered by RDW when they re sign the route. [/on topic]
Last edited: