Yey. What's my prize?You win the Internet.![]()
Thursday 30th/Friday 1st July off peak revenue runs Brighton - core - Bedford
Monday 4th continues all week(m-f)
Monday 11th July 3 diagrams in use
Then two diagrams per week to be converted to 700 (primarily FLU-12 car)
Yey. What's my prize?
In which direction?The last ride on Eurostar before the tunnel is filled in!
The last ride on Eurostar before the tunnel is filled in!

If that's the case, I'll try and grab one of them once I return from Scotland.Using RTT I've managed to work out that the working from Thursday onwards will be:
5Z26 0951 Three Bridges Depot - Brighton
1W26 1105 Brighton - Bedford
2W43 1354 Bedford - Three Bridges
5Z43 1611 Three Bridges - Three Bridges Depot
Now I just need someone who knows more than me to say that I'm wrong.![]()
Has anybody got any details about tomorrows 700 service please? I can't wait to have a ride on it! I would really appreciate it if someone could post the timetable![]()

Correct me if I'm wrong the 700s will initially be used on London Bridge-Brighton turns over the weekend which kind of makes sense as it would release a Southern 377 for work elsewhere
I don't think they are running at weekends yet![]()
I see, thanks for the info.
It may have more to do with the London to Brighton bike ride thing, the 700s will cope much better with a lot of bikes.
I suppose that will suffice :P.Your very welcome
It may have more to do with the London to Brighton bike ride thing, the 700s will cope much better with a lot of bikes.
That was last weekend
700005 700003 and 700006 were stabled at Cricklewood on 23/06/2016
taken from passing 313
Using RTT I've managed to work out that the working from Thursday onwards will be:
5Z26 0951 Three Bridges Depot - Brighton
1W26 1105 Brighton - Bedford
2W43 1354 Bedford - Three Bridges
5Z43 1611 Three Bridges - Three Bridges Depot
Now I just need someone who knows more than me to say that I'm wrong.![]()
Correct me if I'm wrong the 700s will initially be used on London Bridge-Brighton turns over the weekend which kind of makes sense as it would release a Southern 377 for work elsewhere
Has anybody got any details about tomorrows 700 service please? I can't wait to have a ride on it! I would really appreciate it if someone could post the timetable![]()
May I ask by 'full diagrams' do you mean 'all introduced' or 'more than one unit'?
Er? You mean 319 right?
May I ask by 'full diagrams' do you mean 'all introduced' or 'more than one unit'?
Full diagram would mean train coming into service at about 0600 and coming out of service at about 2300 (or later), rather than the diagrams that it is on now where it works a handful of services between the peaks.
You are quite right 319, I saw 700110 and 700112 shortly after at Hornsey from a 313.
By chance I had a ride for the first time on one of these today. Was supposed to be from Three Bridges to London Bridge but the train was terminated at Gateway due to very late running. Although it was only a 5 minute run, I was really impressed. It was quiet and airy without ghastly operating theatre lights and the ride is excellent. Looking forward to them being introduced on the Sutton loop.
yeh, for all my criticism about the seating, i was impressed by the ride.
I suppose that is helped by the fact that the suspension has "gone" on most of the ELectrostars and they now sway and bounce like no bodies business.