Quite a lot of houses and gardens in the way.TBH, the ideal would be to reinstate the link to High Wycombe properly, then you would have traffic going both ways, rather than just feeding down to Maidenhead and the GWML for Reading and London.
Quite a lot of houses and gardens in the way.
If the average loading is around 19 passengers per trip then maybe the closure of Marlow-Boure End should be considered and that bit being done by bus, then the rest of the time could get electrified
That might be an option, but presumably an even cheaper option would be just to buy a couple of bogied Parry People Movers and have them shuttle back and forth.
How much is a bogied Parry People Mover?
I doubt it. Rather than being evenly spread out during the day, the passenger numbers will come mostly from the peak period. The train would carry the most people at exactly the same time as the road network would be busiest, so bus replacement wouldn't work unless the line were ripped up and replaced with a busway. That might be an option, but presumably an even cheaper option would be just to buy a couple of bogied Parry People Movers and have them shuttle back and forth.
The space from the reversing point to the platform end will accommodate a 3-car train, measured on a GIS map.
Very doubtful, take a look at https://en.wikipedia.org/wiki/Bourne_End_railway_station the picture in the info box shows how little room there is when a 2 car train is in, a 3 car would very likely foul the points.
Well I do not understand how the early morning train, which I saw for myself just yesterday at morning, from Bourne End to Paddington is 5 coaches long and that comes straight off the Marlow Line, am I missing something here? This must be proof that 3 car trains are possible...
Platform 2 however is longer but trains that use it can only go back to Maidenhead.
How far clear of the switch blades of the points does the unit have to be for the signal interlocking to allow the points to operate?
The opening of a railway line connecting Maidenhead with High Wycombe has been under discussion more than 40 years after it was closed.
Proposals to reopen the link were raised at a meeting of Wycombe District Councils cabinet on Monday, June 6, as councillors debated how best to provide for the needs of a growing population.
Although the Marlow Branch Line allows travel from Maidenhead to Marlow and Bourne End, commuters have no dedicated rail link onwards to High Wycombe.
If the shorter platform was abandoned, could the points be moved a little further away from the buffer stops to allow a 3x20 emu to be used? It would probably need a slight re-alignment of the curve towards Marlow
If the shorter platform was abandoned, could the points be moved a little further away from the buffer stops to allow a 3x20 emu to be used? It would probably need a slight re-alignment of the curve towards Marlow
I think it makes sense to electrify Maidenhead - Bourne End. The problem is what to do with the last section to Marlow. If the service was split permanently at Bourne End (as it is at peak times now) you could lengthen platforms so that a 4x20 EMU could use the branch. Bourne End is complicated by the junction and limited space between the river and the buffer stops.
One option then could be a PPM shuttle (like Stourbridge) just for Marlow - Bourne End. A nicer solution would be to reopen the line between Bourne End and Wycombe, possibly as light rail or tram-train to give connectivity between Marlow and Wycombe. But the track bed is partially obstructed plus you would need to create a level crossing at Bourne End so it wouldn't be straightforward.
While Platform 2 at Bourne End was never long enough for 3/16x, the moving of the buffer stop reduced it to a tight fit for 2/16x which remains today. I suspect modern safety standards would prevent moving the buffer stop back to increase available room.
Abandoning platform 2 won't gain any length - the curve round towards Marlow is already close to the minimum radii passenger stock can negotiate so the best that can be hoped for is a new set of points in platform 1 level with the existing platform 2 points. This would still only allow 2x 23m coaches.
By providing Marlow with all day half hourly Elizabeth Line connections to central London at Maidenhead, the project could remove the need for the daily peak through workings between Bourne End and Paddington...
A little tweaking of the alignment under renewal/enhancement of the whole junction might allow a small increase in standage, which with signal sighting measures and a few metres at the buffer end could suffice to accommodate 3 car again.