Thames Valley Branch Lines Electrification
Details
Project reference code: W003a
HLOS driver: Other electrification projects
Operating route: Western, Wessex
Last updated: March 2016
CP5 output driver
Following approval for the electrification of the Great Western Main Line (GWML), there is an opportunity to also electrify the two Thames Valley branch lines (listed below) enabling a significant switch to electrified services for commuting in the Thames Valley from the Berkshire and Oxfordshire catchments. The projects will facilitate replacement of diesel trains for cascade to the West, providing additional capacity for both the Thames Valley and the West of England.
Network Rail’s Obligation
- Deliver a 25kv AC electrification solution for the Twyford to Henley-on Thames, Slough to Windsor and Eton Central to enable electric traction to
operate.
- For the avoidance of doubt, electrification of Maidenhead to Bourne End and Marlow branch lines is not included, but Network Rail will support Great Western Railway and other stakeholders to develop their capacity improvements proposals for this section
Scope of works
Develop 25kv AC electrification solution (including gauging and structures
clearance) for:
̶ Twyford to Henley-on-Thames
̶ Slough to Windsor & Eton Central.
This project does not include associated ancillary works necessary to enable the introduction and operation of electric trains and other electric traction (e.g. rolling stock clearance, depots / stabling works or platform lengthening as a result of the operation of electric trains).