Just drafting my Last Will, and I want to leave £20,000 to the railway, but I would like people to see some benefit from it...

Preferably something in Merseyside & Cheshire. It needs to be something that would still be viable in 30 years time or so, when I expect to die...

Any ideas who to leave this money to, i.e. organisations/TOCs etc...?????

I am confused because I have always loved the railways, and I feel they have provided me with a lot in life, so I would like to give something meaningful back...

I would love to hear any ideas you might have...

Thanks :)
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

TheSlash

Established Member
Joined
7 Jun 2005
Messages
2,336
Location
Marwell Zoo
Well i have to do my bit and first of all say your money would go along way on a Preserved railway.

However if you want to leave it to the mainline railway, how about a waiting shelter or similar?
 

First class

Established Member
Joined
9 Aug 2008
Messages
2,731
Well i have to do my bit and first of all say your money would go along way on a Preserved railway.

However if you want to leave it to the mainline railway, how about a waiting shelter or similar?

A preserved railway would be great. Do you know of any with Liverpool connections? I know £20,000 is a reasonable amount, but in terms of the a preserved line, would it actually do that much anyway?

I was also wondering about whether to leave the money to the local PTE, Merseytravel to put towards rail projects...
 

TheSlash

Established Member
Joined
7 Jun 2005
Messages
2,336
Location
Marwell Zoo
With respect, your £20,000 would be wittled away in red tape and consultancies.
£20,000 for a preserved railway?
You could give a Mk1 coach a really good overhaul.
You could overhaul the moving bits on a diesel loco.
You could go along way to overhauling a steam loco.
Relay/Upgrade a decent length of track
Renovate a station building

I am sure the list goes on.
I will have to get back to you on Preserved railways in the Merseyside area
 

theblackwatch

Established Member
Joined
15 Feb 2006
Messages
10,889
I agree with a preserved railway, or preservation group. In my will, I have left a sum to 2 preservation groups. Alternatively, if you want it to benefit the 'big railway', a local Rail Users Group (which are voluntary organisations) would be a better bet than a commercial outfit such as a TOC.
 

Z12XE

Member
Joined
30 Sep 2005
Messages
876
Or even better than an RUG - a Community Rail Partnership Actiongroup if there is one, the money would then directly go to providing additional facilites to passengers on stations etc.
 

Mojo

Forum Staff
Staff Member
Administrator
Joined
7 Aug 2005
Messages
21,175
Location
0035
The average station platform shelter costs on average about £30,000.
 

bluenoxid

Established Member
Joined
9 Feb 2008
Messages
2,659
Hm. It is a good one. Who would benefit and who do you want to benefit?

Once you have sorted that out, it will help.

Do you want to help preserve history or do you want to improve the current railway system?

£20,000 will make it much easier to get the other 10K to pay for the shelter. Many small projects are achieved through partnership between a host of organisations
 

Metroland

Established Member
Joined
20 Jul 2005
Messages
3,212
Location
Midlands
Cost of passing loop on Network rail, Falmouth Branch: £8 million

http://news.bbc.co.uk/1/hi/england/cornwall/7489554.stm

Cost of passing loop on a Mid-Norfolk preserved railway: £50,000

Conclusion: Money to preserved railways goes a lot further.

To complete this project:

* 1 signal box
* 9 signals
* 20 panels of track
* 1000 tonnes of track ballast
* 3 sets of points metals
* 3 sets of point timbers
* 3 point motors

The estimated cost of the project is £50,000, consisting of the following items:

* £13,000 for pointwork;
* £12,000 for ballast;
* £10,000 for building the signal box;
* £10,000 for modifications to platforms and the level crossing;
* £3,000 for signage, plant hire and fencing; and
* £2,000 for the signalling system.

http://www.mnr.org.uk/help/passingloop/
 
Last edited:

bluenoxid

Established Member
Joined
9 Feb 2008
Messages
2,659
He isn't dead yet, sheeessshhhh. You'll be dividing his organs up next :D
 

First class

Established Member
Joined
9 Aug 2008
Messages
2,731
You've certainly gave me things to think about... thanks :)

Why does the cost differ so greatly between engineering on the mainline versus a preserved one? Surely the materials are going to be roughly the same?

I think I'm going to put a preserved railway down, and I will review it in 10/15 years and check if it is still going and what it's up to... assuming I'm still around...
 

TheSlash

Established Member
Joined
7 Jun 2005
Messages
2,336
Location
Marwell Zoo
You've certainly gave me things to think about... thanks :)

Why does the cost differ so greatly between engineering on the mainline versus a preserved one? Surely the materials are going to be roughly the same?

Volunteer labour
Volunteers doing the paperwork
Recovered compoments rather than new
No service disruption compensation
A more common sense approach to safety legislation
 

class 313

Established Member
Joined
10 Dec 2005
Messages
6,475
Location
St Albans
All I can say mate is take everything into account and then do what you think is best. Don't let anyone pressure you...
 

thelem

Member
Joined
17 Mar 2008
Messages
550
Volunteer labour
Volunteers doing the paperwork
Recovered compoments rather than new
No service disruption compensation
A more common sense approach to safety legislation

I've not seen the figures, but I'd have though the last two of these, plus site set up / return and general red tape would be the vast majority of the additional cost.

If it was just the first three factors then I think we'd be talking about 10 times the cost, rather than 1,600 times the cost (yes, 1,600 times, not 1,600%)
 

O L Leigh

Established Member
Joined
20 Jan 2006
Messages
5,609
Location
In the cab with the paper
Please make your cheque payable to driver O L Leigh at Bishops Stortford depot. ;)

In all seriousness, many charitable organisations rely on bequests from people when they die to the extent that legacies have now become a major part of the charitable fundraising industry. Therefore it is not unlikely that a preserved railway or a local rail-users group would be able to make use of your generosity. I certainly wouldn't consider leaving any money to a TOC or Nitwit Rail.

Then again, I'm not sure what you could do with your money that would make a lasting impact. Station furniture gets swept away and replaced on a fairly basis and any rolling stock that your money could go to restore would still need ongoing restoration work to ensure it's continued viability. Perhaps your legacy would be best served by paying for something less physically tangible but longer lasting, such as underwriting a local transport campaign to restore rail services on a long-closed line or improvements to an existing line. Your money may not buy much in the way of infrastructure, but it would go a good way to meeting the legal and other associated costs of running a campaign and would be a long-lasting legacy in your memory.

O L Leigh
 

TheSlash

Established Member
Joined
7 Jun 2005
Messages
2,336
Location
Marwell Zoo
When i say volunteers doing the paperwork, i should include that they deal with alot of the red tape.
Don't forget that in the real world, everyone has to add in alittle bit of job creation, where as volunteers are more interested in achieving the end goal
stethomson90, why not contact the railway of your choice? It might seem morbid, but in this day and age, alot of places have aleast one person assigned to deal with legacies and post humous donations
 
Status
Not open for further replies.

Top