On a historical note, the Ryde Pier Tramway did actually serve St. John's Station, via Simeon Street, prior to the opening of the railway tunnel in 1880. Famously it ran *through* a large detached villa en-route! The railway tunnel was constructed by the 'cut and cover' method and is very shallow - could the same method be used for its reconstruction? - it seems to be free of buildings directly overhead. This would secure the future of the line, enabling any standard *legacy* stock, electric or diesel to be used, and also enable the Steam Rly to reach the Pier Head.
Christopher Garnett's report is very lightweight, with no costs and heroic assumptions about the suitability of the (unsatisfactory) T69 trams. It is reminiscent of his (failed) GNER francise renewal bid. The Blackpool Tramway upgrade (11 miles), completed in 2012, came in at £100 million, including £40 million for 16 new Flexity 2 trams. It is very difficult to see how this sort of expenditure for the IOW (8.5 miles) could be justified when the ridership figures are very much less than Blackpool. One thought that did occur to me is that Manchester Metrolink are considering ordering more M5000 trams before the production line is closed - maybe the IOW could piggyback on to that order? They also have the advantage of being high-floor (unlike the T69s), so avoiding the cost of station platform reconstruction.