bramling
Veteran Member
I can't see those platforms being extended into Moorgate, so the only solution I can think of is a higher service frequency.
I know in the peak you can have a train every five minutes or so, but whether you could increase that frequency further I have no idea.
With the open nature of the trains, no intermediate cabs and wider doors/aisles I do think many of the problems will be eradicated in the short term though. The total number of people that could fit on a 6 car 70n will be far greater than a 6 car 313 - even if most won't be seated.
That's all well and good, except that some journeys from the extremeties of the Hertford line can be quite lengthy. For a journey like Cuffley to Moorgate ideally you would want a seat.
Moorgate will never see Victoria Line frequencies simply because of the track layout and lack of overrun tunnels. Perhaps you could squeeze in a couple of extra tph with stepping back of drivers, but only if you can unload/load the trains (and platforms) quickly. Whatever frequency you achieve into Moorgate has to be shared between Hertford and Welwyn. If Thameslink took over all the Welwyn services Hertford could get a metro-style service, and could be completely segregated from the rest using the additional tracks in the FP to AP area. Welwyn would benefit from an all 8-car service, with only a handful of platforms needing extension, the only difficult one being Brookmans Park and (perhaps) Hornsey. Would only work if the Thameslink destinations provided an alternative to Moorgate however, of if interchange at Finsbury Park could be made to work efficiently.
