Final layout is 3 for Cannon St, 2 for Thameslink, 4 for Charing Cross. 9 in total.
Out of interest, what's the rationale for only 3 platforms for CST compared to 4 for CHX? Is Cannon Street anticipated to have fewer services or something?
Out of interest, what's the rationale for only 3 platforms for CST compared to 4 for CHX? Is Cannon Street anticipated to have fewer services or something?
It's four platforms for Charing Cross eventually though. What's just opened is not finished, because the P6 track and structure is not there yet. Then when it is, in August, it will be needed temporarily for the up Cannon St route.
Which way are the escalators facing, London or country?
I would imagine it stays in the down direction to clear the platforms as soon as possible. Then possibly in the evening peak it changes into the up direction.On terminating platforms wouldn't platform staff reverse the escalator down for a few minutes after a service has arrived before switching to the up direction again as the queues clear. Presumably there'll be a lift too that can be used for each,platform.
Incidentally does anyone know what the lump between P9 and P10 is going to be? You can see it in my second attachment. I've heard it's the 'services spine' - what is a services spine?
There is a video from Network Rail showing the arrangement of platform escalators and the new concourse on YouTube, watch from 1:45 to 1:50.
Terminating platforms get one staircase and one escalator per pair, presumably up only or peak direction, P15 and P10 obviously get their own.
Through platforms get two staircases and four escalators, two up and two down, on either side of the staircases. P1 gets its own set (but only two escalators).
There will be an additional double escalator in the triangular void between P10 and P9, from the current upper concourse down to the new lower concourse, which presumably replaces some of the lost capacity from the quad escalators down to the current vaults on the way to the tube.
Nice video. But on escalator capacity - eek! Isn't only one escalator plus one staircase going to cause massive bottlenecks on the terminating platforms at rush hour? If trains arrive on both sides of a platform at about the same time, then presumably two packed trainloads will both be trying to get to onto that single escalator+stair at the same time. And won't that be a nightmare for anyone trying to travel in the contra-peak direction (eg. trying to get up the stairs and onto the platform at the moment that all the crowds are trying to get off it)?
Nice video. But on escalator capacity - eek! Isn't only one escalator plus one staircase going to cause massive bottlenecks on the terminating platforms at rush hour? If trains arrive on both sides of a platform at about the same time, then presumably two packed trainloads will both be trying to get to onto that single escalator+stair at the same time. And won't that be a nightmare for anyone trying to travel in the contra-peak direction (eg. trying to get up the stairs and onto the platform at the moment that all the crowds are trying to get off it)?
When does the change over for vaults happen? What I mean is the current escalators on the southern concourse are removed so the passage goes to the new concourse? Is that august this year or in 2018?
I wonder if they considered stopping a few Cannon St ups on P6 between August and when they slew the lines back to the new P1/2/3 in 2017. Even if they could only manage off peak services, it does seem useful, and given they're passing through what will (by then) be a fully operational platform for CHX down, it seems a bit of a waste!
Highly unlikely. Didn't the down line from Charing Cross run through a closed platform for quite a significant period, and stopping was never considered. If an opportunity to call becomes off-peak only and one way only, the down side will be passengers coming to the station for nonexistent services at the wrong times, or in the wrong direction. Much easier to have a clean break, I would have thought.
On terminating platforms wouldn't platform staff reverse the escalator down for a few minutes after a service has arrived before switching to the up direction again as the queues clear. Presumably there'll be a lift too that can be used for each,platform.
I suppose one of the features of the design (once they decided to have a common circulation area under all the platforms), is that the rising gradient of the through platforms would have always led to them having longer escalators and stairs than the terminating platforms.From the video, there seems to be 52 stairs up to the platforms (13x4), so it's going to be quite a climb if the escalator is set to 'down'.
My thinking was it would only go down for 2-3 mins before being reversed. There would need to be lifts for the foot traffic the other way.
I do wonder how many passengers will actually want to use the lower concourse. If we think generally of commuters presumably only tube passengers and those that work in More London. I work in the City and can't see why I'd ever use it.
Yes my thoughts were overly Southern centric - I plain forgot about Southeastern! Thinking about now, Southeastern passengers share my route to the City with segregated high level footways but in the new layout they'll have to descend all the way down, cross a road and then climb back up the hill to cross London Bridge.
There'll also be all the people off newly 'converted' Thameslink through services (that were previously Southern terminating services), and I guess many of them may still wish to leave the station on foot and cross London Bridge.
But the transfer of some 'Southern' routes to 'Thameslink' will also slightly alter the number of services terminating in P10-15?
FOH:2421040 said:Yes my thoughts were overly Southern centric - I plain forgot about Southeastern! Thinking about now, Southeastern passengers share my route to the City with segregated high level footways but in the new layout they'll have to descend all the way down, cross a road and then climb back up the hill to cross London Bridge.
How many of the people who walk across London Bridge are Southeastern passengers out of interest? I'd have thought many of them would board CST services and terminate in the City itself, as I do.
Yes my thoughts were overly Southern centric - I plain forgot about Southeastern! Thinking about now, Southeastern passengers share my route to the City with segregated high level footways but in the new layout they'll have to descend all the way down, cross a road and then climb back up the hill to cross London Bridge.