Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
When are the gantries due to go up? This thread will be fun round about then.

There was work at Didcot over Christmas, the route itself should have been wired during the Christmas/New Year closure. It's down in the EAS for OHL HOPS Install Wire between 41m 54ch and 51m 64ch (Pangbourne to Didcot) but that didn't happen, though it can't be too far away now, given there's a feeder at Didcot (though feeding from Stockley Junction westwards is fine).
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

steverailer

Member
Joined
15 Feb 2013
Messages
169
When are the gantries due to go up? This thread will be fun round about then.

Between Pangbourne and Goring they are pretty much all up and the vast majority now have the sps installed. There are some small gaps between Goring and Didcot but expect alot of those to be filled in the next month or so. The viaduct east of Waterloo bridge was due to have its gantries last night, but believe that they had some plant issues.
 
Joined
5 Aug 2011
Messages
791
You can always tell how well an article has been researched when the first sentence is completely wrong! :lol:

Quiet news day?

A sad reflection on the standard of today's journalism getting such basic facts wrong, don't journalist prof read their articles anymore?
 

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,860
Location
Oakham
I made the point about the visual effects of an electrified railway on Twitter last night in response to someone posting the link to the Telegraph report:

https://twitter.com/Peter_Mugridge/status/683436819560677376

For the benefit of those who don't do links, I responded with a link to an aerial photograph of the Lune Valley where the WCML and the M6 run in parallel and pointed out that the electrified railway is in the picture as well.

In the picture you can barely see the WCML whereas the ghastly scar of the M6 can truly be said to disfigure the landscape.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,585
Location
Preston Lancs
I made the point about the visual effects of an electrified railway on Twitter last night in response to someone posting the link to the Telegraph report:

https://twitter.com/Peter_Mugridge/status/683436819560677376

For the benefit of those who don't do links, I responded with a link to an aerial photograph of the Lune Valley where the WCML and the M6 run in parallel and pointed out that the electrified railway is in the picture as well.

In the picture you can barely see the WCML whereas the ghastly scar of the M6 can truly be said to disfigure the landscape.

Well done Sir! :)
 

Lurpi

Member
Joined
13 Jul 2015
Messages
77
That article is the first time I've ever heard anyone accuse Network Rail of having "rushed through" the GWML electrification! :lol: (see just below the picture of the gantries) Perhaps someone should show Patrick Hallgate, it might cheer him up.
 

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,860
Location
Oakham
Thank you; so far that tweet has had:

Impressions 286
Total engagements 106
Link clicks 78
Detail expands 18
Profile clicks 4
Likes 3
Retweets 2


So I suspect the point is being made. :)
 

broadgage

Member
Joined
11 Aug 2012
Messages
1,094
Location
Somerset
That article is the first time I've ever heard anyone accuse Network Rail of having "rushed through" the GWML electrification! :lol: (see just below the picture of the gantries) Perhaps someone should show Patrick Hallgate, it might cheer him up.

Indeed, I would hope for a bit more "rushing through" after some years of Nimbyfests and more years of construction delays.
 

po8crg

Member
Joined
6 Feb 2014
Messages
559
Thank you; so far that tweet has had:

Impressions 286
Total engagements 106
Link clicks 78
Detail expands 18
Profile clicks 4
Likes 3
Retweets 2


So I suspect the point is being made. :)

I also tweeted about the article and picked up some RTs from a few railway people, so I got even more reach

Impressions 1,592
Total engagements 105
Link clicks 55
Detail expands 20
Retweets 15
Replies 6
Profile clicks 5
Likes 4
 

Who Cares

Member
Joined
5 Jun 2015
Messages
72
MR MUGRIDGE….and P08CRG

A lovely picture of the Lune Valley….

It might be more honest, however, when trying to compare the impact of the rail line to that of the motorway, if you and other Twitterati were to inform your followers that the Goring Gap does not ( yet ! ) have a six lane motorway running through it, and that to compare a dual track / electrified with single track cantilevers / in a cutting with what is being installed in the Goring Gap is apples and oranges….

PHILIP….

Tedious for yourself and others, perhaps, but maybe yourself and the others should just stop reading and posting on this particular thread, no ?….We all appreciate your technical knowledge, even if we don’t all understand the full technicalities, but having moaned about some of my postings on the original thread and asking for this new thread to be started so that those of us of us who want to can continue to discuss NR’s underhand tactics on this subject, coming on here and moaning yet again is being a bit greedy….

You effectively asked me not to post on the previous thread, somewhat condescendingly saying

Most of us have been most patient with you, but in the face of myths being repeatedly perpetuated, really enough is enough now.

Let’s get this clear - I have complained, here on this forum, mainly about NR’s failure to meet its Social Obligations regarding its failure to consult on mitigation….But it is the AsONB and CPRE and several lawyers who have been consulted who believe that NR is in breach of its statutory obligations regarding infrastructure developments in the two AsONB….I will back their knowledge of these statutory obligations against those of the overwhelming majority of posters on here, therefore not wholly a myth on my part....

But while you and others are here, I’ll add my own comments and clarification to your recent post….

It's getting a bit tedious now. They're not getting new portal gantries, no matter how much they keep banging on about it. There is nothing else out there designed, ready for production, which has been tested and which fits into certification. The metalwork, if it's not fitted, has already been ordered, paid for and mainly manufactured for Goring anyway, and was done long before this campaign kicked off.

They're trading a loss of some views for a railway that 24/7/365 will makes considerably less noise, which will have much less air pollution and for those people in the area using the train service, will have more capacity, be more reliable and offer better journey times and options.

Hopefully, we’ll be able to let the courts decide whether ‘they’ are not getting new portal gantries, whether already paid for, delivered, installed or whatever….The Action Group are still waiting, since late summer, on a FOI request to NR to prove that NR requested F+F to produce the least visually obtrusive design….If no request was made, then there is additional suspicion / evidence to conclude that NR did not attempt mitigation in the Goring Gap as the AsONB believe was their statutory obligation…. You are, however, correct that gantries and portals were being installed before the Campaign started as NR did not undertake the originally promised consultation on design and mitigation before the ground engineering and installation began….

And not wholly correct in your assessment of the trade-off as they are trading not some views, but a three or four mile stretch of disfigurement of a beautiful landscape for what benefit ?

There will be very little noise improvement. NR’s own Environmental Statement states that electric trains are 3db quieter than existing traffic in the Goring Gap – but I’d challenge anyone here to distinguish between, say, 97dbs and 94dbs close in, or 56dbs and 53dbs from a distance….And as it has been stated that there will be an increase in traffic, over a 24 hour period, the overall noise levels and noise disruption will almost certainly increase, no ? Those who live there will tell you that at the moment, the noise of an HS125 at 100 mph through the Goring Gap lasts about 30 seconds from silence to silence close up and less than 10 seconds from the surrounding hills….The XCountry trains are virtually silent, even close up….The DMU’s operating the local stopping services are noisy when stationary, but again virtually silent 200 > 300 meters after starting, and the noisiest trains are the freight trains which because they are long, slow and heavy and pulled by diesel units, are the worst offenders and these diesel units will be not be replaced for another 10 years at least….

Much less air pollution ? Partly agreed….Reduced air pollution will be a huge benefit, but as only about 50% of traffic will switch from diesel to electric within the next five years or so, depends whether 50% can be termed ‘ much less’….

More capacity ? Local stopping trains in the Goring Gap are never, ever, full , end of….Between 09.30 and 15.30, they run at less than 20% occupancy and in commuter rush hours tend to fill and empty at Reading for journeys to and from Paddington…So more capacity needed for Paddington <> Reading, of course….More capacity needed for Oxford <> Reading, absolutely not required….

More reliable ? Depends heavily on FGW, no, and not necessarily on the electrification of the track….However, my simple mind says diesels trains and non-electrified track equals just a single component which may be defective….Electric trains and electrified track equals two components which may be defective….

Better journey times and options ? Not too sure what you mean by options, but strange you say better journey times because NR have stated categorically that they cannot confirm the frequencies and journey times between Goring Gap and Oxford / Paddington following the Project’s completion as this is the responsibility of the TOC’s….If you have, already, or have seen a copy of FGW’s schedules and journey times for 2020, please share them with NR….
 
Last edited:

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,585
Location
Preston Lancs
Hopefully, we’ll be able to let the courts decide whether ‘they’ are not getting new portal gantries, whether already paid for, delivered, installed or whatever….

When I was doing my Masters degree 20 odd years ago, the lawyer giving the lecture opened up with "only FOOLS AND LAWYERS GO TO COURT" :D
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
Tedious for yourself and others, perhaps, but maybe yourself and the others should just stop reading and posting on this particular thread, no ?….We all appreciate your technical knowledge, even if we don’t all understand the full technicalities, but having moaned about some of my postings on the original thread and asking for this new thread to be started so that those of us of us who want to can continue to discuss NR’s underhand tactics on this subject, coming on here and moaning yet again is being a bit greedy….

You wrecked the last thread with your continual complaining and it's no better here. You're repeating a whole number of incorrect and inaccurate nonsense as if it's truthful and correct.

I don't know if some of your post is a genuine mistake, or if it's deliberately fabricated, but let's point out a number of errors

Let’s get this clear - I have complained, here on this forum, mainly about NR’s failure to meet its Social Obligations regarding its failure to consult on mitigation….But it is the AsONB and CPRE and several lawyers who have been consulted who believe that NR is in breach of its statutory obligations regarding infrastructure developments in the two AsONB….I will back their knowledge of these statutory obligations against those of the overwhelming majority of posters on here, therefore not wholly a myth on my part....

But while you and others are here, I’ll add my own comments and clarification to your recent post….

The problem you and your lawyer friends who have been consulted will have told you, is that the various legislation on AONBs comes well after the Acts of Parliament which authorised the construction, maintenance and upgrading of the GWML. It's almost always the case where no matter what subsequent AONB legislation has said, Railway Acts over-rule them.

We've got GSM-R masts sitting in National Parks up and down the country, thanks to the current and historical rights Network Rail enjoys, plenty of lawyers looked at them, both Network Rail, DfT and opponents and the case for their installation, and for the installation of OLE, is watertight.

If you want to try it in court, good luck with it, but don't forget your cheque book. And remember to apply for a protective costs order.
Government gets what government wants - whether it's a new railway line through the most historically important railway station site in the world, up in Manchester, or whether it's an electrified main line.

Hopefully, we’ll be able to let the courts decide whether ‘they’ are not getting new portal gantries, whether already paid for, delivered, installed or whatever….The Action Group are still waiting, since late summer, on a FOI request to NR to prove that NR requested F+F to produce the least visually obtrusive design….If no request was made, then there is additional suspicion / evidence to conclude that NR did not attempt mitigation in the Goring Gap as the AsONB believe was their statutory obligation…. You are, however, correct that gantries and portals were being installed before the Campaign started as NR did not undertake the originally promised consultation on design and mitigation before the ground engineering and installation began….

F+F had a design brief, part of which was deliver lower height, low impact electrification, it also had to meet many other criteria, and that is what has been delivered. It's based on electrification that SBB-CFF-FFS and RhB know and accept as having been installed across Alpine routes which, with the greatest of respect to Goring, are a damn site more natural and in my mind, more attractive.

And not wholly correct in your assessment of the trade-off as they are trading not some views, but a three or four mile stretch of disfigurement of a beautiful landscape for what benefit ?

Many structures are fully obscured by trees, and are not in line of sight, some are, but there are another three directions one can look where you will not see the railway or the OLE system.

The benefit isn't just for Goring, which as I've said gets a cleaner, quieter environement, but for the millions of people who do travel along the GWML

There will be very little noise improvement. NR’s own Environmental Statement states that electric trains are 3db quieter than existing traffic in the Goring Gap – but I’d challenge anyone here to distinguish between, say, 97dbs and 94dbs close in, or 56dbs and 53dbs from a distance….And as it has been stated that there will be an increase in traffic, over a 24 hour period, the overall noise levels and noise disruption will almost certainly increase, no ? Those who live there will tell you that at the moment, the noise of an HS125 at 100 mph through the Goring Gap lasts about 30 seconds from silence to silence close up and less than 10 seconds from the surrounding hills….The XCountry trains are virtually silent, even close up….The DMU’s operating the local stopping services are noisy when stationary, but again virtually silent 200 > 300 meters after starting, and the noisiest trains are the freight trains which because they are long, slow and heavy and pulled by diesel units, are the worst offenders and these diesel units will be not be replaced for another 10 years at least….

Much less air pollution ? Partly agreed….Reduced air pollution will be a huge benefit, but as only about 50% of traffic will switch from diesel to electric within the next five years or so, depends whether 50% can be termed ‘ much less’….

More capacity ? Local stopping trains in the Goring Gap are never, ever, full , end of….Between 09.30 and 15.30, they run at less than 20% occupancy and in commuter rush hours tend to fill and empty at Reading for journeys to and from Paddington…So more capacity needed for Paddington <> Reading, of course….More capacity needed for Oxford <> Reading, absolutely not required….

More reliable ? Depends heavily on FGW, no, and not necessarily on the electrification of the track….However, my simple mind says diesels trains and non-electrified track equals just a single component which may be defective….Electric trains and electrified track equals two components which may be defective….

We can't replace every train overnight with new electric trains.

Capacity is needed in various places, not just in and around Goring. Goring is not the centre of the universe, dismissing the capacity requirements of services elsewhere just because Goring doesn't need longer trains with more capacity is selfish and ignorant of the way in which the railway works.

Electric trains are considerably more reliable when compared to diesel trains, Modern Railways do a good comparison for reliability each December/January, well worth comparing the miles per five minute delay (MP5MD) figures produced by the various train fleets.

Better journey times and options ? Not too sure what you mean by options, but strange you say better journey times because NR have stated categorically that they cannot confirm the frequencies and journey times between Goring Gap and Oxford / Paddington following the Project’s completion as this is the responsibility of the TOC’s….If you have, already, or have seen a copy of FGW’s schedules and journey times for 2020, please share them with NR….

Can't do that just yet, but the electrification will be worth it in terms of journey options and times, as you shall soon see.
 

455driver

Veteran Member
Joined
10 May 2010
Messages
11,329
One thing they could do to improve the views over the AONB is to knock down all the houses built in them, I mean how 'natural' is it with some bloomin big houses in it!

Of course lets not get drawn into how 'natural' these areas actually are eh!
 

absolutelymilk

Established Member
Joined
18 Jul 2015
Messages
1,611
Electric trains are considerably more reliable when compared to diesel trains, Modern Railways do a good comparison for reliability each December/January, well worth comparing the miles per five minute delay (MP5MD) figures produced by the various train fleets.

Do you by any chance have a link for one of these?

Also I notice in the last Golden Spanners that the 159/0 has an extremely good Miles per Technical Incident (MTIN), better than more recent DMUs and even EMUs. Is there an operational reason for this?
http://www.modern-railways.com/view_article.asp?ID=9299
 

asylumxl

Established Member
Joined
12 Feb 2009
Messages
4,260
Location
Hiding in your shadow
One thing they could do to improve the views over the AONB is to knock down all the houses built in them, I mean how 'natural' is it with some bloomin big houses in it!

Of course lets not get drawn into how 'natural' these areas actually are eh!

I'm inclined to agree for once! One rule for the geese and one for the gander 'eh?

I'm also inclined to question how 'beautiful' some of these AONB actually are. For example, some areas in the 'Chiltern Hills' that will be impactee by HS2 are about as Chiltern as Inverness and as hilly as Lincolnshire.
 

Who Cares

Member
Joined
5 Jun 2015
Messages
72
PHILIP

Hang on....

You chased me off the other thread, and now you're trying to chase me off this one as well ??

I know you work in the industry, probably within NR, and have access to day-to-day and strategic management of this Project - however, that doesn't mean that you're always right and that I'm always wrong....

I was merely pointing out some of the flaws in your arguments about how LOCAL RESIDENTS will benefit....And which you failed to fully answer in your post above as your answers are for the most part 'Project Assumptions' and not specific to this thread which is about the impact on the AsONB and the residents of the Goring Gap....

I don’t know if some of your post is a genuine mistake, or if it’s deliberately fabricated, but let’s point out a number of errors

I have no idea why you should say that my comments are deliberately fabricated – that's actually quite insulting !

Most portals and gantries are and will remain visible from both street level and from hills for miles around the Goring Gap - Fact….Noise levels will not drop significantly for residents in the Goring Gap, and the frequency of noise intrusion will increase with increased traffic - Fact….FOI request re F+F remains unanswered after almost six months - Fact....There will be, more or less, a 50% reduction in pollution from diesel exhausts, so glass half empty or half full depending on who is speaking - Fact….There will be an unneeded increase in capacity for residents of the Goring Gap who use the trains - Fact….I'll stand corrected about the reliability of equipment which should increase, but not necessarily that of the TOCs serving the Goring Gap – Fact….And there are no details yet of projected time savings and frequency increases for residents of the Goring Gap who use the trains – Fact.

All of which you said would benefit LOCAL RESIDENTS….Quite honestly, that’s either NR Public Relations bullsh*t or still remains to be proven….

And my comments re NR's Social and Legal Obligation - again, I was merely stating the current OPINION of the Action Group and AsONB and their advisors....I made no attempt to deceive or to deliberately post dishonest statements, whatever you may think and state here….NR have permitted Development Rights – Fact….They have, to date, done nothing which is not included in their Permitted Development Rights – Fact….However, they failed to honour their promise of consultation re mitigation in the Goring Gap before installation of OLE started – Fact….Preliminary Legal Advice and the OPINION of the Boards of the AsONB is that NR have not met their Statutory Obligations re infrastructure developments in AsONB – Fact, as in OPINION of those involved and consulted….

Mistakes and / or fabrications, please ?

I will also add that NR have now agreed to appropriate mitigation of OLE in the Goring Gap if agreement can be reached by all parties on how this can be achieved after the trials of the new trains has been completed – Fact….Action Group and AsONB prepared to compromise – Fact....NR prepared to compromise - ??????

The question then remains, of course, why this consultation couldn’t have been taking place during the past three years unless NR were hoping, for whatever reason, to avoid consultation and mitigation – Fact ( the question / answer, that is )

By the way – I have no idea who the journalist is or how and why the Daily Torygraph has only just picked up on this....Nothing to do with me, gov….


I no longer read or post in the original thread, as this thread was more or less created by the mods, at Philip P’s request, specifically to avoid mixing the different interests re this Project of the different readers and contributors to this forum….So I’ll continue to post here, when there is news, as long as the mods will allow me….
 
Last edited:

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
Fact….FOI request re F+F remains unanswered after almost six months.

Could you link me to the response on the FoI Request, or any reference details you've got for that.

The only request I can find is FoI2015/00562 which related to the business case for choosing the Series 1 design, I can't find any request, let alone one from 6 months ago, asking for confirmation that F+F produced the least visually obtrusive design.

What the person asking in request 00562 received was an extensive analysis of why the Series 1 system has been chosen, with comments on reliability, safety, tensioning, weights, access, and overall design. If they specifically asked about headspans, they'll also have been told the same thing I've told you, about why they're not suitable.

NR have permitted Development Rights – Fact….They have, to date, done nothing which is not included in their Permitted Development Rights

That's largely correct.

Network Rail don't just have permitted development rights, they have full authority to maintain and enhance their railways under the original Acts of Parliament which authorised the construction of the Great Western Railway and the other routes being electrified which are either part of the GWEp project or others, and on double checking with the legal people, there's no ambiguity about Railways and AONBs, all railways, including light railways, have been specifically excluded from AONB legislation since it was first enacted in 1949.

Railways are also specifically excluded from the legislation protecting AONBs, as per the Countryside and Rights of Way Act 2000 and as I say, they were again specifically excepted in the original Act of Parliament which established AONBs and National Parks, the National Parks and Access to the Countryside Act 1949.

From what I've been told, much of this legislation was written the way it was to specifically ensure that the planned modernisation schemes developed by British Railways in the 1950s wouldn't be impacted by legal challenges or requirements to amend existing legislation, and as far as we know, no legal challenges were forthcoming about electrification of the WCML in both of its stages.

I say this with a bit of respect, it's clutching at straws to try and suggest that because Network Rail didn't fully consult people they have absolutely no statutory obligation to consult, they can be forced in a court of law to change the design of their electrification system.

I can tell you, definitely, you're going to make a lot of lawyers very rich, cost Network Rail a little money, and achieve absolutely nothing. Westminster wants GWML electrification, Welsh Government wants GWML electrification, Network Rail and GWR need the capacity afforded by GWML electrification, Network Rail have the legal powers necessary to electrify the route. There's no way you can stop it.

I'd suggest looking at what has happened to the Anti HS2 Groups over the last year, accept it's happening, and ask Network Rail if they can do anything to screen the line with tree/hedge planting where possible, and possibly looking to see if they could paint or fit green coloured fence mesh around the masts to lessen their impact.
 

AE

Member
Joined
5 Jan 2012
Messages
57
Dear Who Cares,

Have you ever considered being a little more stoical? You know, taking one for team GB. Other people have much worse to look at. Some people have a view of a power station so you can watch television. Others have a view of an oil refinery so that you can drive your car. You'll have a view of an electrified railway rather than an unelectrified one. It's not that much of an imposition and the railway will be all the better for it.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,585
Location
Preston Lancs
Dear Who Cares,

Have you ever considered being a little more stoical? You know, taking one for team GB. Other people have much worse to look at. Some people have a view of a power station so you can watch television. Others have a view of an oil refinery so that you can drive your car. You'll have a view of an electrified railway rather than an unelectrified one. It's not that much of an imposition and the railway will be all the better for it.

I just love this post - balanced, not an ad hominem; reasonable.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,298
There will be very little noise improvement. NR’s own Environmental Statement states that electric trains are 3db quieter than existing traffic in the Goring Gap – but I’d challenge anyone here to distinguish between, say, 97dbs and 94dbs close in, or 56dbs and 53dbs from a distance….And as it has been stated that there will be an increase in traffic, over a 24 hour period, the overall noise levels and noise disruption will almost certainly increase, no ?

You are presumably aware that db is logarithmic scale so a reduction of 3db is in fact a 50% reduction and hence rather noticable?
 

nickswift99

Member
Joined
7 Apr 2013
Messages
283
As someone who lives in the area but is pro-electrification, I find this debate really interesting.

My observations are:
a) There is more resistance to the Tesco proposal to open an "Express" store next to the station than there seems to be for electrification of the railway and the visual impact on the Goring Gap.
b) The resistance that does exist has, I think, not been helped by the time that's been taken in the ground works. This has caused a lot of disruption over a very extended period and not helped local relations. This isn't just limited to line-side works. The replacement of the footbridge at Goring station is another example.
c) It's not clear to local rail users what the benefit will be or when it will be delivered. This hasn't, IMHO, been well communicated.

I'd like to see more engagement by Network Rail and GWR but, I'm afraid, there will always be some people who do not like change or see certain aspects as unacceptable. I respect their point of view but like other posters, feel it is a lost cause. I would much rather NR spend their effort working out how to sort out electrification into Oxford than fight off legal challenges.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,585
Location
Preston Lancs
As someone who lives in the area but is pro-electrification, I find this debate really interesting.

I would much rather NR spend their effort working out how to sort out electrification into Oxford than fight off legal challenges.

Hear, hear, another well balanced reply.
 