I got the Video 125 DEV Eurostar into Waterloo and it made me think of several things:

Southleet Junction to Fawkham junction: How often is it used now since the lines redundancy?

Vauxhall/Wandworth flyover: will it ever be used again?

The class 373: since the transfer of services into St Pancras Int, do the trains have the Network rail equipment and the 3rd rail stuff? also do the new trains have them?

Do you think the Eurostar will ever return to Waterloo?

Could the disused sections of track be used for Southeastern High Speed diversions?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
I got the Video 125 DEV Eurostar into Waterloo and it made me think of several things:

Southleet Junction to Fawkham junction: How often is it used now since the lines redundancy?

Vauxhall/Wandworth flyover: will it ever be used again?

The class 373: since the transfer of services into St Pancras Int, do the trains have the Network rail equipment and the 3rd rail stuff? also do the new trains have them?

Do you think the Eurostar will ever return to Waterloo?

Could the disused sections of track be used for Southeastern High Speed diversions?

Southfleet has been used by Javelins but mostly on Charters run by them. However Eurostars will not return to Waterloo as the 3rd Rail equipment has been removed. The Vauxhall flyover has been used for the occasional charter in recent months otherwise it is disused now.
 

Antman

Established Member
Joined
3 May 2013
Messages
6,840
I got the Video 125 DEV Eurostar into Waterloo and it made me think of several things:

Southleet Junction to Fawkham junction: How often is it used now since the lines redundancy?

Vauxhall/Wandworth flyover: will it ever be used again?

The class 373: since the transfer of services into St Pancras Int, do the trains have the Network rail equipment and the 3rd rail stuff? also do the new trains have them?

Do you think the Eurostar will ever return to Waterloo?

Could the disused sections of track be used for Southeastern High Speed diversions?

As far as I'm aware 3rd rail equipment has been removed from the entire fleet?

Waterloo International and the Vauxhall flyover do seem a waste of money, I think the original plan was to still run some Eurostars to Waterloo when St Pancras opened but for whatever reason it didn't happen.
 

Helvellyn

Established Member
Joined
28 Aug 2009
Messages
2,575
The plan is that the former Waterloo International will effectively become the Windsor Line platforms after a rebuild of the concourse at that end of Waterloo. I was told the plans are to effectively drop the concourse to street level, with escalators up to platforms 20-24 and the "main" concourse.

Ideally the Battersea flyover would be demolished and you could then have the Windsor lines four track all the way from International Junction to Barnes.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Demolishing the Viaduct will be hugely expensive and require full blockade of Waterloo
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,275
Ideally the Battersea flyover would be demolished and you could then have the Windsor lines four track all the way from International Junction to Barnes.

That would be quite unlikely to happen. If 8 tracks were to become available throughout between Waterloo and Clapham Junction NR's long stated preference would be for a 3+3+2 layout, to give the main fasts a reversible 'fifth track'.

The problem is that the overall capacity requirement isn't balanced neatly into 50/50 Windsors and Mains.
 

notadriver

Established Member
Joined
1 Oct 2010
Messages
3,737
How about a Javelin service to Waterloo? That would give good connections for those travelling onto SWT etc
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,275
How about a Javelin service to Waterloo? That would give good connections for those travelling onto SWT etc

Would they be any better than travelling via Waterloo East? I think not, and there'd be no capacity via the Southeastern routes anyway - that's basically why they never ended up with any diversions into Waterloo to cope with the London Bridge Thameslink works.
 

notadriver

Established Member
Joined
1 Oct 2010
Messages
3,737
At the moment those Victoria - Orpington trains run every 15 mins. If they ran instead every 20 mins that would open an hourly slot for that train via Brixton?
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
No it wouldn't because 20 minute frequency is on the wrong part of the clockface twice an hour.
 

Antman

Established Member
Joined
3 May 2013
Messages
6,840
Demolishing the Viaduct will be hugely expensive and require full blockade of Waterloo

It could probably be done gradually in overnight possessions, whether it should be demolished is another matter though
--- old post above --- --- new post below ---
At the moment those Victoria - Orpington trains run every 15 mins. If they ran instead every 20 mins that would open an hourly slot for that train via Brixton?

A 20min service wouldn't fit in with other services, the service shouldn't be reduced anyway;)
 

NSEFAN

Established Member
Joined
17 Jun 2007
Messages
3,518
Location
Southampton
Antman said:
It could probably be done gradually in overnight possessions, whether it should be demolished is another matter though
There's no real prospects of it being used again for regular services, however 8 tracks aren't needed between Waterloo and Clapham Junction just yet (I believe such a decision is somewhat dependent upon the final details of Crossrail 2). Hence there's no need to demolish Linford Street - Nine Elms flyover just yet.
 

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,839
Location
Epsom
I can guarantee that as soon as they demolish that flyover, they will find a real and ongoing need for it less than a week later.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,257
The flyover was (part?) paid for with a European grant so can't be demolished before a certain date without having to repay the grant...

Only the ramp part would need to be demolished to get the extra track through so would only need Windsor side blockades.
 