Often when I visit Manchester Victoria, I wonder what the services will be like in the future, when it becomes a through station in 2019(?) with all services from the west running through to the east if only as far as Stalybridge (EMUs) or Rochdale (DMUs). With the new franchise awards, we now have a better idea, it looks like a massive increase in the number of departures from the current 10-12 per hour to something like 30. 15 through trains per hour - 4 TPE, 3 Northern Connect and 8 Northern. This begs a few questions. Will the station cope with an increase in passenger numbers, facilities are somewhat sparse? Will the east facing bays under the expensive new roof really be empty? What happens if Stalybridge electrification is delayed?
Here's a possible service pattern, based on new services announced and current services being maintained. Any corrections/comments/thoughts welcome.
A. FROM ORDSALL CHORD.
2 TPE services from Manchester Airport to Newcastle and Middlesborough
1 Northern Connect service from Manchester Airport to Calder Valley line
B. FROM CHAT MOSS
2 TPE services from Liverpool to Scarborough and Edinburgh
2 Northern Connect services from Liverpool and Chester to Calder Valley line
1 Northern stopper from Liverpool to Stalybridge
C. FROM WIGAN
The franchise spec says there will be 7tph from Wigan to central Manchester, so the Victoria service could look something like:
1 Southport via Atherton to Calder Valley line (Brighouse)
1 Southport via Atherton to Rochdale
1 Kirby via Atherton to Rochdale
1 Wigan via Lostock to Stalybridge
D. FROM BOLTON
1 Blackpool North to Stalybridge
1 Clitheroe to Calder Valley Line (Burnley/Blackburn)
1 Blackburn to Rochdale
Here's a possible service pattern, based on new services announced and current services being maintained. Any corrections/comments/thoughts welcome.
A. FROM ORDSALL CHORD.
2 TPE services from Manchester Airport to Newcastle and Middlesborough
1 Northern Connect service from Manchester Airport to Calder Valley line
B. FROM CHAT MOSS
2 TPE services from Liverpool to Scarborough and Edinburgh
2 Northern Connect services from Liverpool and Chester to Calder Valley line
1 Northern stopper from Liverpool to Stalybridge
C. FROM WIGAN
The franchise spec says there will be 7tph from Wigan to central Manchester, so the Victoria service could look something like:
1 Southport via Atherton to Calder Valley line (Brighouse)
1 Southport via Atherton to Rochdale
1 Kirby via Atherton to Rochdale
1 Wigan via Lostock to Stalybridge
D. FROM BOLTON
1 Blackpool North to Stalybridge
1 Clitheroe to Calder Valley Line (Burnley/Blackburn)
1 Blackburn to Rochdale
Last edited: