bradders1983
Member
Does Rotherham Central get any improvement in services from either new franchisee? Higher frequency? New destinations etc?
Doesnt look like it. It is getting the tram/train thing, though.
Does Rotherham Central get any improvement in services from either new franchisee? Higher frequency? New destinations etc?
Someone put the following post on another forum:
Gates to be installed at 8 Northern stations - I wonder if that's all new ones or it includes Manchester Pic / Crewe / Stoke on Trent etc.
There's no more litter on Northern trains than there was on the London Midland and FCC trains I used to take to work. The difference was they had cleaners tidying it up throughout the day but Northern don't or didn't, meaning it just piled up. Other than empty coffee cups and discarded Metros there's not been much damage. But the issue of litter has been rehashed on here by anti-pacer about a billion times.
There's also the issue that people will take less care over things that are neglected, and the 142s and 155s are in a pretty sorry state internally these days.
Much as I do approve (and at the same time am surprised) - why are they making such a huge thing of the Ormskirk-Preston improvements? It's hardly as if it is an important line to the franchise. Does someone important in Government live along it, perhaps?
Id say not, Man Pic is Network Rail , Crewe and Stoke are Virgin and all three are having gates fitted by Virgin.
Isnt the one in bold Bradford to Nottingham rather than Leeds to Nottingham?
Does anyone know the Timescale on any of this or has any other info worth adding?
Are the parlys mentioned?
The existing ones have to remain except for the Ellesmere Port ones which are replaced by peak time only services between Ellesmere Port and Leeds via Bradford.
Gates are only being fitted on platforms 4 to 7 at Manchester Piccadilly by Virgin. I have heard that barriering the other platforms will be the responsibility of the new Northern franchisee.
Apparently Liverpool Lime Street, Bradford Forster Sq, Bolton and Blackburn are also to be done. Don't know how they will barrier Blackburn though. Presumably there will be 3 others.
Does Rotherham Central get any improvement in services from either new franchisee? Higher frequency? New destinations etc?
Stopping service Sheffield-Moorthorpe-Leeds will be hourly (currently two-hourly).
There's nothing about Ellesmere Port in the announcements.
Looks to me like they all go to Chester.
Apologies if this has been posted elsewhere, but the transformation of the Calder Valley services seems amazing. I expected significant improvements over that described in the ITT document, but this seems incredible. The improvements are dispersed over different maps, but it seem to me that:
1. There will be 3tph Bradford to Manchester services (for most of the day), it is implied that the new service being an extra semi fast service calling at Halifax, Hebden Bridge and Todmorden (not Rochdale?)(Bradford map)
With regards to new EMU's on the Airedale/Wharfedale lines, do you think this will be a uniformed fleet or a mix of these and 333's?
If it's going to be all new units, what's likely to happen to the 333's?
Does Rotherham Central get any improvements in services? New destinations etc? (Either with TPE or northern)
The short answer is it's unclear at the moment. It's also unclear what will happen with Leeds-Doncaster other than the 321/2s will be replaced and it's also unclear whether new or cascaded stock will replace the 323s except on Hadfield services where new stock is mentioned.
Would be ridiculous if it didnt call at Rochdale having called at Hebden Bridge and Tod!
Does Rotherham Central get any improvement in services from either new franchisee? Higher frequency? New destinations etc?
You asked this about an hour ago and got an answer to it.
So does this mean all new trains, or just six car (presumably made up of 2 x3 car units) at the peaks, then a mixture at other times. And if 3 cars units are part of the order, will they ever run in single formation off-peak (reducing the current capacity)? I guess we'll just have to wait for the ink to dry in 10 days or so.
The only thing I saw was an improvement in Sunday Sheffield-Leeds stoppers to 1 per hour.
From http://maps.dft.gov.uk/northern/index.html :
Would be nice to get the new fast Nottingham service stopping at Rotherham, but that might do away with the time gains between Leeds-Sheff versus the Barnsley routing.
That is an improvement on Sundays. Two hourly is hopeless as at present.
I too wondered if (hoped that) Leeds to Nottingham services may stop at Rotherham.
If it's to replace all the 333s I wouldn't be surprised if it means something like 16 x 4 car EMUs, replaced by something like 24 x 3 car EMUs resulting in more carriages on the busiest services and less on the quieter services.
The route via the Holmes chord is quite slow, isn't it? It's also single in places and will have 3 tram-train services per hour so I'd have thought the Nottingham services will run fast via Masborough. Some peak calls might be possible though.
With regards to new EMU's on the Airedale/Wharfedale lines, do you think this will be a uniformed fleet or a mix of these and 333's?
If it's going to be all new units, what's likely to happen to the 333's?
There was something in the Rotherham Advertiser the other about a study for rail in Rotherham. It acknowledged the town's poor connectivity and gave some options. One was to build a new station on the main line near Parkgate, another to double Holmes chord.
Neither of the new franchises seem to acknowledge this.
I have a ground-breaking plan for Network Rail. Why not have a station at Masbrough........