North Yorkshire County Council has published its long-term strategic transport prospectus: see https://www.google.fr/url?sa=t&rct=j&q=&esrc=s&source=web&cd=1&ved=0CCEQFjAAahUKEwi29LfIx-nIAhUKHxoKHUMNAb0&url=http%3A%2F%2Fdemocracy.northyorks.gov.uk%2FFunctionsPage.aspx%3Fdsid%3D75833%26action%3DGetFileFromDB&usg=AFQjCNG4b18JMdy5x28P5rWqwmgCiF7vAQ&sig2=W0k7FZRYTZEuJo_zcCGwSA&cad=rja. It is surprisingly aspirational, although it has to be seen very much as part of an effort to get some of the Northern Powerhouse funding spread beyond the Liverpool to Hull axis and into North Yorkshire.
Long-term campaigners (you know who you are…) for the reopening of a Leeds to Harrogate to Newcastle via Ripon railway will be pleased to see its inclusion as a sought-for long-term development as part of a number of proposed railway improvements.
--- old post above --- --- new post below ---
I have now had time to summarise the findings of this document.
The report puts a surprisingly strong emphasis on rail. It also – I think for the first time – gives some costed estimates of the cost of two major interventions.
Firstly, the report recommends what it describes as transformational change on the York – Harrogate - Leeds line. It holds that there is a strong business case for electrification of the line, transformation and modernisation of Harrogate station, and double tracking all of the remaining single-track sections to improve performance and resilience. It provides an estimated cost for this intervention of £170 million, although it does not provide any justification for how this figure has been arrived at. It states that the first parts of these works, funded by the county council, should be completed by 2018. It is concerned about congestion at Leeds station. It makes mention of plans by the city of York to provide an alternative north of the city approach to a new platform 12 at York station, avoiding crossing the East Coast mainline and thus providing greater resilience, increasing capacity and further reducing journey times.
Secondly, in a surprising move, the report recommends investment in what it calls strategic North Leeds new railway infrastructure. It justifies this by mentioning the consequences of failure on the ECML and which, it thinks, will become more severe when HS2 trains are routed over that infrastructure towards Newcastle and Edinburgh. The resilience argument, together with investment in rail links to ports, is held to be significant in the context of encouraging inward investment into the region:
“A new railway from Leeds to Harrogate, Ripon and then joining the ECML north of Northallerton will bring much needed resilience to the ECML and enable the East coast ports to expand. In the longer term (post 2030) it could also potentially help with plans and aspirations for housing and business growth in the central A1(M) / ECML corridor and it will help to enable the North East, Tees Valley and Yorkshire & Humber economies to act as a single market. Additionally it will remove three level crossings on busy A roads in Northallerton removing a major source of congestion and a constraint on the growth of North Yorkshire’s County Town. The £210m scheme will also provide for two new stations and better connect the Leeds City Region with the North East and Scotland. Whilst delivery of this proposal in the Leeds area could potentially start in the period to 2030 later phases in North Yorkshire are likely to be delivered after 2030.” I would comment that it looks as though the North Yorkshire planners are thinking in terms of bypassing Northallerton station in some way, at least for the new line via Ripon. It is unclear where the two stations referred to would be built, although presumably one of them would serve Ripon.
The report is keen on Parkway stations and makes a slightly worrying allusion to “the potential for the rationalisation of stations to provide one good station rather than two or three poor ones”. It seeks improved East-West rail links to Whitby in the context of the rural economy and the York Potash development. It would also like to see improved “Cross Pennine links between Craven District and East Lancashire including the potential re-opening of the Skipton – Colne railway”.
This document can therefore be politely described as highly aspirational and less politely as very, some would say unduly, optimistic in its outlook.
Long-term campaigners (you know who you are…) for the reopening of a Leeds to Harrogate to Newcastle via Ripon railway will be pleased to see its inclusion as a sought-for long-term development as part of a number of proposed railway improvements.
Thanks to Yorkie for improving my original post.key extracts from 'A Strategic Transport Prospectus for North Yorkshire' said:Our Rail Plan
Much of the railway infrastructure in the North of England is largely untouched from the Victorian era and no longer meets the demands of a Northern Powerhouse. We support the aspirations for high speed connected cities set out in The Northern Powerhouse. In line with industry practice, we have set out a High Level Conditional Output Statement and this points to the following interventions to achieve those outputs
Improving east – west connectivity - Transformational change on York – Harrogate – Leeds Line.
There is a strong business case for electrification of the line....
Improving access to High Speed and conventional rail - Maintaining and improving access to HS2 Hubs and mainline stations...
Improving long distance connectivity to the north and south - Strategic North Leeds new railway infrastructure....
....A new railway from Leeds to Harrogate, Ripon and then joining the ECML north of Northallerton will bring much needed resilience to the ECML and enable the East coast ports to expand. In the longer term (post 2030) it could also potentially help with plans and aspirations for housing and business growth in the central A1(M) / ECML corridor and it will help to enable the North East, Tees Valley and Yorkshire & Humber economies to act as a single market. Additionally it will remove three level crossings on busy A roads in Northallerton removing a major source of congestion and a constraint on the growth of North Yorkshire’s County Town.
The £210m scheme will also provide for two new stations and better connect the Leeds City Region with the North East and Scotland. Whilst delivery of this proposal in the Leeds area could potentially start in the period to 2030 later phases in North Yorkshire are likely to be delivered after 2030.
--- old post above --- --- new post below ---
I have now had time to summarise the findings of this document.
The report puts a surprisingly strong emphasis on rail. It also – I think for the first time – gives some costed estimates of the cost of two major interventions.
Firstly, the report recommends what it describes as transformational change on the York – Harrogate - Leeds line. It holds that there is a strong business case for electrification of the line, transformation and modernisation of Harrogate station, and double tracking all of the remaining single-track sections to improve performance and resilience. It provides an estimated cost for this intervention of £170 million, although it does not provide any justification for how this figure has been arrived at. It states that the first parts of these works, funded by the county council, should be completed by 2018. It is concerned about congestion at Leeds station. It makes mention of plans by the city of York to provide an alternative north of the city approach to a new platform 12 at York station, avoiding crossing the East Coast mainline and thus providing greater resilience, increasing capacity and further reducing journey times.
Secondly, in a surprising move, the report recommends investment in what it calls strategic North Leeds new railway infrastructure. It justifies this by mentioning the consequences of failure on the ECML and which, it thinks, will become more severe when HS2 trains are routed over that infrastructure towards Newcastle and Edinburgh. The resilience argument, together with investment in rail links to ports, is held to be significant in the context of encouraging inward investment into the region:
“A new railway from Leeds to Harrogate, Ripon and then joining the ECML north of Northallerton will bring much needed resilience to the ECML and enable the East coast ports to expand. In the longer term (post 2030) it could also potentially help with plans and aspirations for housing and business growth in the central A1(M) / ECML corridor and it will help to enable the North East, Tees Valley and Yorkshire & Humber economies to act as a single market. Additionally it will remove three level crossings on busy A roads in Northallerton removing a major source of congestion and a constraint on the growth of North Yorkshire’s County Town. The £210m scheme will also provide for two new stations and better connect the Leeds City Region with the North East and Scotland. Whilst delivery of this proposal in the Leeds area could potentially start in the period to 2030 later phases in North Yorkshire are likely to be delivered after 2030.” I would comment that it looks as though the North Yorkshire planners are thinking in terms of bypassing Northallerton station in some way, at least for the new line via Ripon. It is unclear where the two stations referred to would be built, although presumably one of them would serve Ripon.
The report is keen on Parkway stations and makes a slightly worrying allusion to “the potential for the rationalisation of stations to provide one good station rather than two or three poor ones”. It seeks improved East-West rail links to Whitby in the context of the rural economy and the York Potash development. It would also like to see improved “Cross Pennine links between Craven District and East Lancashire including the potential re-opening of the Skipton – Colne railway”.
This document can therefore be politely described as highly aspirational and less politely as very, some would say unduly, optimistic in its outlook.
Last edited:
. I do know that you are both well informed contributors. But I also know that we should not be arguing between ourselves, we should be looking for sensible routes (literally) forward by means of informed debate rather than invective.