LDECRexile
Established Member
Interesting discussion, but does anyone know if 319s will be doing the biz soon?
Thank you for asking.
Northern Electrics Class 319s now use and pass through Liverpool South Parkway and pass through West Allerton as a direct result of the Liverpool-Manchester electrification scheme, as shown in stills and films in this set and several earlier sets focused on South Parkway.
I usually try to add colour and context to photo sets, for example by showing diesel stock, Kestrels hunting, quirky signs and so on. Never having set foot on West Allerton before I may have included too much salad and too little meat, given the striking variety passing through. If so, I hope you'll be able to grit your teeth and ignore the incidentals.
Looking over the material shared over the last couple of years I don't think I overdo the peripheral stuff, but maybe that's just a judgement call and I'm biased.
You may have seen that quite a lot of people chip in, all amateurs doing it for fun. Have you anything you'd like to contribute? Given your user name maybe you have some local angles or history which we haven't seen before.
If so, please send me a Private Message and I'll suggest easy ways to share your material.
All the best
Dave
Thank you for asking.
Northern Electrics Class 319s now use and pass through Liverpool South Parkway and pass through West Allerton as a direct result of the Liverpool-Manchester electrification scheme, as shown in stills and films in this set and several earlier sets focused on South Parkway.
I usually try to add colour and context to photo sets, for example by showing diesel stock, Kestrels hunting, quirky signs and so on. Never having set foot on West Allerton before I may have included too much salad and too little meat, given the striking variety passing through. If so, I hope you'll be able to grit your teeth and ignore the incidentals.
Looking over the material shared over the last couple of years I don't think I overdo the peripheral stuff, but maybe that's just a judgement call and I'm biased.
You may have seen that quite a lot of people chip in, all amateurs doing it for fun. Have you anything you'd like to contribute? Given your user name maybe you have some local angles or history which we haven't seen before.
If so, please send me a Private Message and I'll suggest easy ways to share your material.
All the best
Dave
The plan is to introduce 319's to the Warrington BQ service from December and also to use Electrics on the 2 additional peak LIV-MCV's in the morning and evening.
This will require a slight timetable reshuffle but essentially the idea is to have no diesal running on fully electrified routes.
The xx:14 MAN-MIA shuttle is also due to go 319 from December.
Finally due to the speed increase and problems with regulation, the LPY-PRE services will become 'class 1' from December with hopes of giving them a better chance of keeping time in and around Preston.
Thank you for your kindness and encouragement.
Does anyone know if the Lime St-Warrington Bank Quay stoppers are all set to go electric at the December timetable change? I believe that's been the plan for months, but I haven't seen owt recently.
I was sorry to see criticism of Dave (LDECRexile)'s photographic endeavours.
I wonder how many people are aware of the tremendous amount of work Dave has put in over the last, nearly 2 years creating a photographic record record of the NW electrification process, which he has made available to all?
I think our coverage of NW Electrification would be much the poorer were it not for Dave's efforts
I too was sorry to see criticism. I have met Dave and had a pie and pint with him last December when we had a great day out on the NW scheme. Outstanding work Dave - please keep up the great work. We need a "Dave" on the GW scheme.![]()
There's a lot Network Rail as an entity should be photographing, not just from a social history aspect, but to help learn lessons for the next electrification projects - silly things like fencing contractors doing one job, the vegetation clearance coming along and revealing more fences being needed. Photos stop people dying in conferences and lectures.
I thought the plan was to divert all the Warrington Bank Quay stoppers to Manchester anyway?They are busy out to Earlestown, then pretty empty on to Warrington.
But the Victoria stopper is not busy either beyond Earlestown/Newton le Willows.
The fare system will have something to do with it - Merseytravel zonal fares don't apply.
To Huyton, they are just as busy as the Wigan trains, forming part of the 4tph.
Peak services form a second train to Victoria instead of Warrington.
I thought the plan was to divert all the Warrington Bank Quay stoppers to Manchester anyway?
I have no criticism of your work for the forum. Please continue doing what you are doing.
Best wishes.
Interesting discussion, but does anyone know if 319s will be doing the biz soon?
The plan is to introduce 319's to the Warrington BQ service from December and also to use Electrics on the 2 additional peak LIV-MCV's in the morning and evening.
This will require a slight timetable reshuffle but essentially the idea is to have no diesal running on fully electrified routes.
The xx:14 MAN-MIA shuttle is also due to go 319 from December.
Finally due to the speed increase and problems with regulation, the LPY-PRE services will become 'class 1' from December with hopes of giving them a better chance of keeping time in and around Preston.
Plus delays to other services using Preston Platforms 1 & 2 can also affect Liverpool / Preston services.
With only 4 minute turnrounds at Preston, any delays to Liverpool - Preston services can mean late departures from Preston on the return service to Liverpool.
ok, I thought the Airport service was moving to via Warrington Central, to maintain 2 fast, 2 stopper on both Liverpool to Manchester routes?That's just a rumour, not confirmed by the stopping patterns in the ITT.
The ITT suggests the Victoria stopper will go to the Airport (instead of the current semi-fast).
We'll soon find out.![]()
ok, I thought the Airport service was moving to via Warrington Central, to maintain 2 fast, 2 stopper on both Liverpool to Manchester routes?
would seem to make sense to run the other CLC semi fast through to Sheffield, taking pressure off the Airport to Cleethorpes service. Always seems to be plenty of through Liverpool to Sheffield passengers on the EMT Norwich service as wellThere's some uncertainty.
To cover the swap of the TPE Scarborough to the Chat Moss line a Northern semi fast will run via the CLC to Manchester, but it's unclear where it will go (if anywhere).
The Airport service seems to be the current Victoria stopper.
Odd that they don't reverse out of the way in the infamous bay platforms 3c/4c.![]()
Delays at Balshaw Lane Jn southbound are common, too.
Also arent those bays going to be used for Manchester Vic via Bolton electric service?Using bays 3c/4c would require trains to cross the down fast line, which can also be busy.
And are the bays long enough for a Class 319 ? - I have not seen anything longer than a Class 185 use the bays in recent years.
The plan is to introduce 319's to the Warrington BQ service from December and also to use Electrics on the 2 additional peak LIV-MCV's in the morning and evening.
This will require a slight timetable reshuffle but essentially the idea is to have no diesal running on fully electrified routes.
The xx:14 MAN-MIA shuttle is also due to go 319 from December.
Finally due to the speed increase and problems with regulation, the LPY-PRE services will become 'class 1' from December with hopes of giving them a better chance of keeping time in and around Preston.
And are the bays long enough for a Class 319 ? - I have not seen anything longer than a Class 185 use the bays in recent years.
I think Farnworth is closed on the Sunday for final commissioning so don't go Monday and I wouldn't rush out of bed to see it in case of over run.
One improvement to reduce platform congestion at Preston might be for the former parcels platforms (the original platforms 1 & 2) to revert to passenger use.
Northern have publicly billed closing Farnworth tunnel Sat & Sun 12th and 13th, opening - tadaaaaa - Monday 14th. Overrunning will be mega egg on face, but thanks for the warning.
Some people are very picky.
The electrification scheme includes wiring and extending Allerton depot for 319s.
319s also work from South Parkway to Preston.
When the Lime St-Weaver Jn upgrade starts we can have a new thread for the area (which can include the Halton Curve).
The wires were apparently down at Hunts Cross yesterday, something of an achievement for a station with no overhead electrification. Could this have been some of the repairs rather than to do with the wiring of the depot?Went past Allerton Depot this afternoon on a train from Central to Hunts Cross and saw that there was a overhead line gang with a wagon connecting some of the new posts to the existing wiring. A few have previously been connected, particularly towards the end of the headshunt.