HarleyDavidson
Established Member
- Joined
- 23 Aug 2014
- Messages
- 2,544
The jolt of attaching trains is no worse, unless it's being done by someone who's heavy handed, than the general movement of a train travelling at speed over pointwork etc. The idea of needing a safety announcement just invents a theoretical 'hazard' where one clearly doesn't exist. It's nonsense.
--- old post above --- --- new post below ---
Surely continuity can only be checked by releasing the brakes? Or are we talking stock with traction interlock rather than brake interlock?
On Sprinter stock the procedure with our lot is attach & pull, brake test then undertaken by by releasing down through the steps, ideally with somebody on the other set to confirm the same is happening next door.
Still do it as far as I'm aware.
