Nym
Established Member
Can always change locos at York?
Ah, but do DRS have anything that is diesel AND 110 mph capable?![]()
I've probably mentioned this before but DRS were asked last year to quote for operating TPE's Newcastle - Liverpool service with LHCS. Not heard anything since though.
Because the 67's are already here whereas the 68's are under construction. Looking like more will need to be built. However, DRS is the most likely traction provider so 68's would be most logical. Dont think we will know anything for sure until the next franchise winner is announced
Would this be because the end of the currently extended First TPE franchise award is so much nearer and that matter is not now viewed as being worthy of taking forward in the time still left remaining.
... therefore any loco haulage would need to come from existing fleets rather than any additional loco hauled order.
Or perhaps it's because, aside from sub-leasing a number of Class 170 units in the interim, there is not time enough to prepare any further additional DMU stock.
--- old post above --- --- new post below ---
I'm under the impression that all the Mk3 coaching stock, that is in full working order, is in use. Is that quite true?
I thought HST's don't have to take the lower speed, for some reason I think they're an exception.
^Would be quite excited for some LHCS on TPE as is being discussed.
What's the maximum line speed on the Pennine routes?
Short stretches of 85 east of Diggle (including inside Standedge Tunnel), otherwise 65-75. 90-100 Micklefield-York.
Locos will be limited to 110 on the WCML.
I'm not sure 67s are genuinely passed for 125, there are no regular services at that speed.
Why would you want Loco's beyond 100mph capability anyway, no current North or South TPE service travels beyond 100mph, any Loco hauled solution is likely to only be a short term stopgap, while on the WCML it's not where the biggest problem is, in any case these services are meant to be 90% electric hauled.
Arriva Trains Northern used to do the Settle Carlisle with 37's, so that could work.
The Leeds-Nottingham express service would be good for LHCS IMO.
I think additional loco-hauled sets on the Cumbrian Coast would each release only a single 142 or 153. Whereas a single set on the S&C might free up two 158s. Better "bang for the buck"?How about diagrams on the Cumbrian Coast? Yes there are two sets already but two more maybe?
Well with Scotrail now claiming they are short of stock and looking for more including more loco hauled will anything be left for TPE/northern even if they want it.
Where do you get that idea from? Platform 9 at Newcastle used to be a very tight squeeze for a 5-car class 158 formation, which had to draw right up to the buffer stops. The operational platform length is listed in the sectional appendix as 112 metres, which is in fact just short of the length of 5 x 23 metre carriages, so you certainly couldn't fit a loco in on top of that.Platform 9 is also long enough at Newcastle for a loco+5 as is platform 1 so station capacity isnt an issue either
At my last count (earlier this year), there were sixteen spare buffet vehicles (mainly loco hauled RFMs) and thirty one spare loco-hauled FO/TSO vehicles available. Ownership being split between Porterbrook, Arriva Rail and Direct Rail Services.I'm under the impression that all the Mk3 coaching stock, that is in full working order, is in use. Is that quite true?
I can't see any train operator in this day and age suggesting loco changes en route, they'd rather run diesels under the wires. York doesn't seem very well set up for the sort of regular release moves (it does deal with occasional loco reversals on railtours and ad hoc run rounds of 91s quite well admittedly) that would be required, either.Can always change locos at York?
TPE will need to use P9 initially. Any change to services and through running north of Newcastle won't come in until December 2016 at the earliest. Through running to Edinburgh may require TPE services to have an extended dwell in Newcastle to allow XC or VT services to overtake and Network Rail have indicated through platform capacity at Newcastle may be an issue if this was to occur.Why is there such a big fuss about TPE not being able to fit longer trains on to platform 9? All the pre-07:30 and post-19:00 TPE services at Newcastle use through platforms and if the winning TPE bidder takes up the option of extending services to Edinburgh then I'm sure they won't be using platform 9 however long the formation is.
TPE will need to use P9 initially. Any change to services and through running north of Newcastle won't come in until December 2016 at the earliest. Through running to Edinburgh may require TPE services to have an extended dwell in Newcastle to allow XC or VT services to overtake and Network Rail have indicated through platform capacity at Newcastle may be an issue if this was to occur.
At my last count (earlier this year), there were sixteen spare buffet vehicles (mainly loco hauled RFMs) and thirty one spare loco-hauled FO/TSO vehicles available. Ownership being split between Porterbrook, Arriva Rail and Direct Rail Services.
Theres always platforms 1 and 12. Would however require some northern and scotrail services to use 9 in lieu but thats not a major issue. Its a relatively simple swap.
Except getting a train into platform 1 requires fouling the ECML twice (once to get from the down ECML to the High Level Bridge and again to get from the High Level Bridge to Platform 1). Not to mention Northern running into 9 would add an additional ECML conflict across the King Edward VII bridge.
According to the Sectional Appendix, 12 is actually shorter than 9 (108m instead of 112m).
Indeed. The platform face itself has extra length (currently behind a barrier), but without some serious rejigging of the approaches to the bays the usable length is no greater than any of the other three (out of platforms 9 - 12). Crosscountry only schedule 4-car workings out of platform 12.According to the Sectional Appendix, 12 is actually shorter than 9 (108m instead of 112m).
As far as I know, there are few terminating services at Stockport: The majority are through trains. Newcastle has a mix of through and terminating services.As Newcastle has 12 platforms and has significantly less services than Stockport with 6 platforms (even though the northbound terminus platform at Stockport is rarely used) I'm sure Newcastle will be able to sort out a solution.
I could see the Forth sidings branch coming back into use for stabling purposes, much as Virgin XC used to do some time ago.4. Just shunting units in to sidings between services, instead of leaving them idle at a platform for so long.
Four of the five bays at Newcastle are quite short, and of the five through platforms, two cause conflicts if services are crossing to them from the ECML. One of those through ECML platforms (platform 3 or sometimes 4) is often occupied for the greater part of the hour by the terminating Crosscountry service.
According to the Sectional Appendix, 12 is actually shorter than 9 (108m instead of 112m).
As far as I know, there are few terminating services at Stockport: The majority are through trains. Newcastle has a mix of through and terminating services.
Four of the five bays at Newcastle are quite short, and of the five through platforms, two cause conflicts if services are crossing to them from the ECML. One of those through ECML platforms (platform 3 or sometimes 4) is often occupied for the greater part of the hour by the terminating Crosscountry service.
The turnaround times at Newcastle for the terminating Crosscountry and TPE services are certainly less than ideal to maximise platform usage.
What about terminating the train at Heaton depot? One option might be to switch Cleethorpes to Northern units and merge the Middlesbrough and Newcastle services via Sunderland creating a big loop.
I wonder if the announcement that TPex electrification is back on track, albeit delayed, increases the chances we'll be seeing locomotive haulage of a sort as a stop-gap prior to an all EMU fleet, rather than a new bimode fleet?