AT300s have been confirmed by DfT today.
Ministers have given the go ahead for a new fleet of 29 long distance trains for the South West, to be introduced to routes between Cornwall and the capital by 2018.
The state of the art Hitachi trains will improve journey time and increase capacity by 24% creating more than 1,000 additional peak-time seats.
They will also be capable of operating on both non-electric and electric routes, and will cut the average travelling time between Penzance and London cut by 14 minutes.
Rail minister Claire Perry visited Exeter to mark the announcement today.
Laira depot secures role for AT300s in revived GWR
09/05/2015 in Network
First Great Western says Plymouth’s Laira depot will service the Hitachi AT300 bi-mode trains from their introduction, should the Secretary of State for Transport approve the order at the end of June.
Confirmation came as FGW managers and directors undertook a comprehensive tour of the franchise for staff and stakeholders to explain changes in the Direct Award franchise, which starts on September 15.
Laira and Long Rock (Penzance) depots will service the AT300s, with maintenance carried out at North Pole alongside the similar Class 800s.
The announcement follows concerns about potential job cuts at Laira as a result of the introduction of the new trains (RAIL 773). While a servicing role means the depot will retain work on long-distance trains, it still stands to lose much of the major engineering it has been undertaking on the High Speed Train fleet.
As well as new trains, the most visual aspect of the new franchise will be the abandonment of the First Great Western name in favour of a revival of the Great Western Railway, a name last used commercially on December 31 1947 (see Analysis, pages 32-33).
All the Class 800s, AT300s, Class 57s and ‘Night Riviera’ rolling stock will be painted green with (when the new franchise starts) cast GWR letters on the vehicles. The first ‘Night Riviera’ coaches in unbranded green began operation at the start of May.
•For more on this story, see RAIL 774 published on May 13 2015
- See more at: http://www.railmagazine.com/news/ne...or-at300s-in-revived-gwr#sthash.pRLG1OOJ.dpuf
I seem to recall the MP for Penzance was lobbying for Long Rock to be expanded. Laira's being downgraded, though?
Interesting - I was beginning to wonder what was going on, as this decision was expected back in June. I did wonder whether it might be delayed until there was capacity to build these at Newton Aycliffe (as, unless it's changed, it was reported that these would come from Japan,) but that would leave the issue of PRM-TSI compliance by 2020 for the HSTs. Also I wondered if there was any negotiation to reschedule the deliveries ahead of the IEP electrics, to get around the issues of the bi-modes running extended/higher speed diagrams temporarily. Modern Railways (August) did note that there was rumour of fitting temporary engine rafts to the IEP electric sets.
I think the dft has probably decided accept the order as I believe the majority of HST trains need to be moving to Scotrail and without that move, they would need to find trains to either replace trains on the GWR or provide different trains to Scotrail.
What terrible news, looks like I'll be travelling with SWT for my London bound trips from the day they enter service.

When is the first one expected in service? Will they be available in time to fill the void if electrification is not ready and the HST's need to move off to Scotrail?
Should also ensure that there are plenty of spare HST power cars and Mk3 coaches for Scotrail and EMT.
When is the first one expected in service? Will they be available in time to fill the void if electrification is not ready and the HST's need to move off to Scotrail?

Should also ensure that there are plenty of spare HST power cars and Mk3 coaches for Scotrail and EMT.
What terrible news, looks like I'll be travelling with SWT for my London bound trips from the day they enter service.
May I ask why this is terrible news? Is it because
A) You are some sort of HST fanatic and refuse to travel on any other type of intercity train
B) You don't like the proposed interior and level of service provided by the IEP trains
C) You are showing solidarity with rail workers potentially affected by the introduction of these trains
D) Something else?
If the answer is B - remember that the IEP sets had interiors specified by the DfT. These sets are free to be specified as FGW want - being the long distance 'flagship' units, I would expect these units to have more than a trolley service
(If your answer was C, please don't drag this thread off about FGW, DOO, TUPE etc. There are already threads for that)
Not a fan of the whole underfloor engine, and the low-quality interior, but as you said, FGW have control over this, and will hopefully do a good job. (GWR First Class on the HSTs is fantastic, copy that!)
Don't think MUs are very good for IC services.
As we've discovered before, if anyone is particularly annoyed about the prospect of sitting on top of a diesel engine running from Newbury to Penzance, then they can just choose to sit in one of the many non-engined carriages. All driving vehicles lack engines and there are some intermediate trailer vehicles in IEPs longer than 5 carriages.
Non-engined carriages...a luxury the 159s don't have...
Glad to see some common sense has broken out and the Greater Western franchise won't have a micro-fleet of HSTs for its long distance services.
Whilst Im still of the opinion that IEP equals Voyager Mark2, Im pleased that GWR will be able to spec these, that jobs in the Southwest will be retained and that DFT have saved Scotrails bacon and assuming the voyager mk2, AKA IEP introduction starts om time in 2 years enough trailers can go for refurb and on to Scotland with these arriving in 2018 to fill the gaps.
Only sad thing is that chances of bacon, cooked fresh in a freshly made sandwitch for anyone with any ticket in any class woant be sold on the voyager IEP Trolley.
I shall now sit bck and wate for the Voyager IEP appologists to inform me how wrong I am. Well Il bet when these propper IC Spec qualitty trains start appearing I woant be!
And following the demise of the Travelling Chef, no one can get freshly-cooked bacon in a freshly-made sandwich on an FGW HST right now - but don't let that get in the way of a good whinge, will you?
Everyone else has to make do with a pre-packed bacon baguette bunged in the microwave.
Which was a decision taken at the time so people wouldn't associate the withdrawal with the introduction of the new trains, the Travelling Chef made quite a profit and was well used and liked by the passengers.
....like the rest of us, you have not actually set foot on an IEP, since they haven't been built yet?
I was told by senior management prior to withdrawal that the Travelling Chef services were loss making. As are buffets. Pullman Dining just about covers costs, but only when the full service is able to be offered and the restaurant is full.
Edit-
I note there are only 7x9 coach trains but 22x5 coach trains, will 260m fit on most of the platforms or will it be 5 coach IEP replacing 8 coach HST?