Mod Note: This thread has been split from another thread which can be found here.
Is this going to be the best place to discuss the latest plans though? Perhaps an earlier thread should be reopened...
But in the meantime, this is quite a significant bit of news. The key thing is that they are going to rebuild all the separate bridges on the international platform lines, between Leake St and Upper Marsh into single structures to allow the tracks to be shifted.
Network Rail pdf fact sheet here: http://www.networkrail.co.uk/improv...e/documents/waterloo-approaches-factsheet.pdf
What it implies to me, looking at Google overhead view, is that there will be a new throat for the international terminal, which probably involves reducing the length of the 5 platforms P20-24. AIUI the international terminal didn't allow for parallel moves in and out, which they'll obviously have to enable for the proposed P19-24 Windsor side station.
With the (international side) approach tracks concentrated further towards the far west of the overall viaduct, they will make space available to re-arrange the throat of the existing mainline layout as well.
SWT's latest press release on their web site claims that the bringing back into use of the former Eurostar platforms will be the first major change at Waterloo since the 1930s.
Is this going to be the best place to discuss the latest plans though? Perhaps an earlier thread should be reopened...
But in the meantime, this is quite a significant bit of news. The key thing is that they are going to rebuild all the separate bridges on the international platform lines, between Leake St and Upper Marsh into single structures to allow the tracks to be shifted.
Network Rail pdf fact sheet here: http://www.networkrail.co.uk/improv...e/documents/waterloo-approaches-factsheet.pdf
What it implies to me, looking at Google overhead view, is that there will be a new throat for the international terminal, which probably involves reducing the length of the 5 platforms P20-24. AIUI the international terminal didn't allow for parallel moves in and out, which they'll obviously have to enable for the proposed P19-24 Windsor side station.
With the (international side) approach tracks concentrated further towards the far west of the overall viaduct, they will make space available to re-arrange the throat of the existing mainline layout as well.