I don't know how much of an interest this might be to people:
It would seem those 156 are not going anywhere.
http://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=JUL215775&catID=
It would seem those 156 are not going anywhere.
http://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=JUL215775&catID=
Contract(s) commencement 1st April 2016
Lot1
Overhaul of Class 156 bogies required in accordance with Specification: AT/CI0734 Issue 1, Revision A Class 150, 153 & 156 DMU Bogie Overhaul types BP38,P3-10 & BT38
Initial contract duration to 31st Dec 2019 covering a requirement of 22 units bogie overhauls
Lot2
Overhaul of Class 158 bogies required in accordance with Specification: AT/VI0064-S2 Issue 1, Revision A Class 158 Diesel Multiple Units C4 and C4X Supplementary Overhaul Instruction Scotrail. Job UFS0050
Additional works to be completed during overhaul:-
Modification of axle box sand bracket fixings as per AT-C0-2204225 Issue A - Additional Drilling For Mounting Sander Bogie Bracket Class 158
Brake Callipers overhauled as per Sabre spec EI-131
Initial contract duration to 31st Dec 2018 covering a requirement of 5 units bogie overhauls
Supplier(s)required to ensure the following documents are applied within the Specification to the current revision:
WOSS612/10 Issue 7 Wheelset Overhaul
TN/TS0574 Issue 5 Wheelset Off-Vehicle Repair
CR/CI0567 Issue 4, Revision A - Gmeinder Final Drive Overhaul
TU/TS0075 Issue 3, Revision A - Cardan shaft Overhaul
Suppliers must have access to a suitable facility to complete the work and be accredited to ISO9001:2008 (UKAS approved) along with RISAS for safety critical components including wheelsets.
Bogies will require uplifted and redelivered to Glasgow or Edinburgh depots.
CPV: 50222000.